LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 832-10-0018
Parish: Livingston
Routes: LA 1024
Description: Jct. LA 16 - Jct. LA 447
Type Const: Drainage, patch, surface preparation, striping and guardrail
Estimated Construction Cost: $2,897,778.47


RankLicenseBidderConstruction Bid
1 06276 Barriere Construction Co., LLC. $2,677,605.58
2 12487 Diamond B Construction Co., L.L.C. $2,853,396.82
3 00849 F.G. Sullivan, Jr. Contractor LLC $3,295,052.57
4 00046 Barber Bros. Contracting Co., L.L.C $3,410,464.23
5 00481 Coastal Bridge Co., L.L.C. $3,692,935.23


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Barriere Construction Co., LLC.
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
F.G. Sullivan, Jr. Contractor LLC
- 4 -
Barber Bros. Contracting Co., L.L.C
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 756      LNFT 7.00 5,292.00 6.50 4,914.00 6.00 4,536.00 8.00 6,048.00
0002 202-02-32100 Removal of Pipe (Cross Drain) Stations 60+30, 74+50, 85+75, 139+80, 169+55, 193+50, and 281+80 326      LNFT 20.00 6,520.00 10.50 3,423.00 9.00 2,934.00 25.00 8,150.00
0003 202-02-38300 Removal of Sign and U-Channel Post 35      EACH 1.00 35.00 10.50 367.50 10.00 350.00 40.00 1,400.00
0004 203-07-00100 Borrow (Vehicular Measurement) 1,546      CUYD 30.00 46,380.00 25.00 38,650.00 22.00 34,012.00 10.00 15,460.00
0005 204-02-00100 Temporary Hay or Straw Bales 70      EACH 11.00 770.00 23.00 1,610.00 12.00 840.00 10.00 700.00
0006 204-06-00100 Temporary Silt Fencing 7,780      LNFT 5.00 38,900.00 2.00 15,560.00 1.00 7,780.00 1.60 12,448.00
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,500      CUYD 30.00 45,000.00 85.00 127,500.00 38.00 57,000.00 60.00 90,000.00
0008 502-01-00100 Superpave Asphaltic Concrete 20,608.3    TON 62.00 1,277,714.60 69.00 1,421,972.70 95.00 1,957,788.50 90.00 1,854,747.00
0009 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,358      TON 1.00 1,358.00 135.00 183,330.00 95.00 129,010.00 130.00 176,540.00
0010 509-01-00100 Cold Planing Asphaltic Pavement 7,648      SQYD 2.00 15,296.00 3.50 26,768.00 4.00 30,592.00 2.00 15,296.00
0011 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -319      CUYD 1.00 -319.00 0.10 -31.90 0.00 0.00 0.00 0.00
0012 510-01-00200 Pavement Patching (12" Minimum Thickness) 3,000      SQYD 48.00 144,000.00 80.00 240,000.00 75.00 225,000.00 65.00 195,000.00
0013 510-02-00100 Pavement Widening 3,282.4    SQYD 30.00 98,472.00 33.00 108,319.20 29.00 95,189.60 40.00 131,296.00
0014 701-02-02000 Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) 146      LNFT 190.00 27,740.00 120.00 17,520.00 180.00 26,280.00 170.00 24,820.00
0015 701-02-02040 Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) 88      LNFT 200.00 17,600.00 190.00 16,720.00 200.00 17,600.00 215.00 18,920.00
0016 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 44      LNFT 225.00 9,900.00 200.00 8,800.00 235.00 10,340.00 260.00 11,440.00
0017 701-02-02160 Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) 48      LNFT 240.00 11,520.00 260.00 12,480.00 275.00 13,200.00 300.00 14,400.00
0018 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 275      LNFT 37.00 10,175.00 38.00 10,450.00 37.00 10,175.00 42.50 11,687.50
0019 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 78      LNFT 60.00 4,680.00 60.00 4,680.00 59.00 4,602.00 70.00 5,460.00
0020 704-03-00100 Blocked Out Guard Rail 381.3    LNFT 18.00 6,863.40 18.00 6,863.40 18.00 6,863.40 20.50 7,816.65
0021 704-11-00100 Guard Rail End Treatment (Flared) 11      EACH 2,100.00 23,100.00 2,100.00 23,100.00 2,000.00 22,000.00 2,300.00 25,300.00
0022 713-01-00100 Temporary Signs and Barricades 1      LUMP 84,500.00 84,500.00 17,250.00 17,250.00 101,000.00 101,000.00 95,000.00 95,000.00
0023 713-02-00500 Temporary Pavement Markings (24" Width) 44      LNFT 1.00 44.00 1.00 44.00 0.35 15.40 1.00 44.00
0024 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 13.4    MILE 200.00 2,680.00 150.00 2,010.00 350.00 4,690.00 300.00 4,020.00
0025 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 6.172  MILE 500.00 3,086.00 325.00 2,005.90 100.00 617.20 500.00 3,086.00
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 35.238  MILE 1.00 35.24 650.00 22,904.70 100.00 3,523.80 500.00 17,619.00
0027 717-01-00100 Seeding 161      LB 9.00 1,449.00 8.25 1,328.25 8.00 1,288.00 20.00 3,220.00
0028 718-01-00100 Fertilizer 5,382      LB 0.75 4,036.50 0.32 1,722.24 0.30 1,614.60 1.00 5,382.00
0029 726-01-00100 Bedding Material 49.6    CUYD 20.00 992.00 76.00 3,769.60 47.00 2,331.20 50.00 2,480.00
0030 727-01-00100 Mobilization 1      LUMP 250,000.00 250,000.00 72,000.00 72,000.00 40,000.00 40,000.00 100,000.00 100,000.00
0031 729-16-00300 Object Marker Assembly (Type 3) 35      EACH 80.00 2,800.00 75.00 2,625.00 75.00 2,625.00 85.00 2,975.00
0032 731-02-00100 Reflectorized Raised Pavement Markers 1,652      EACH 6.50 10,738.00 5.00 8,260.00 5.50 9,086.00 6.00 9,912.00
0033 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 22      LNFT 5.00 110.00 3.25 71.50 4.50 99.00 5.50 121.00
0034 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.119  MILE 2,600.00 44,509.40 2,600.00 44,509.40 2,500.00 42,797.50 3,000.00 51,357.00
0035 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.586  MILE 900.00 2,327.40 825.00 2,133.45 825.00 2,133.45 1,000.00 2,586.00
0036 735-01-00100 Mailboxes 187      EACH 1.00 187.00 1.00 187.00 3.00 561.00 2.00 374.00
0037 735-02-00100 Mailbox Supports (Single) 164      EACH 125.00 20,500.00 100.00 16,400.00 125.00 20,500.00 130.00 21,320.00
0038 735-04-00100 Mailbox Supports (Multiple) 5      EACH 275.00 1,375.00 300.00 1,500.00 275.00 1,375.00 200.00 1,000.00
0039 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00 24,000.00 24,000.00 25,000.00 25,000.00 32,000.00 32,000.00
0040 NS-200-00020 Cleaning Existing Ditches 1,400      LNFT 2.00 2,800.00 3.25 4,550.00 7.00 9,800.00 10.00 14,000.00
0041 NS-500-00280 Surface Preparation 1      LUMP 117,000.00 117,000.00 58,000.00 58,000.00 50,000.00 50,000.00 50,000.00 50,000.00
0042 NS-700-00020 Adjusting Guard Rail 522      LNFT 12.50 6,525.00 12.00 6,264.00 12.00 6,264.00 15.00 7,830.00
0043 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 51,992.8    GAL 3.30 171,576.24 3.35 174,175.88 3.15 163,777.32 3.60 187,174.08
0044 507-02-00200 Aggregate (S2) (Stone Only) 76,460      SQYD 0.80 61,168.00 0.85 64,991.00 1.07 81,812.20 1.25 95,575.00
0045 507-02-00300 Aggregate (S3) (Stone Only) 76,460      SQYD 0.63 48,169.80 0.65 49,699.00 0.89 68,049.40 1.00 76,460.00
                         
    CONTRACTOR TOTAL       2,677,605.58   2,853,396.82   3,295,052.57   3,410,464.23



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 756      LNFT 6.00 4,536.00
0002 202-02-32100 Removal of Pipe (Cross Drain) Stations 60+30, 74+50, 85+75, 139+80, 169+55, 193+50, and 281+80 326      LNFT 12.00 3,912.00
0003 202-02-38300 Removal of Sign and U-Channel Post 35      EACH 15.00 525.00
0004 203-07-00100 Borrow (Vehicular Measurement) 1,546      CUYD 20.00 30,920.00
0005 204-02-00100 Temporary Hay or Straw Bales 70      EACH 10.50 735.00
0006 204-06-00100 Temporary Silt Fencing 7,780      LNFT 1.75 13,615.00
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,500      CUYD 25.00 37,500.00
0008 502-01-00100 Superpave Asphaltic Concrete 20,608.3    TON 98.50 2,029,917.55
0009 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,358      TON 150.00 203,700.00
0010 509-01-00100 Cold Planing Asphaltic Pavement 7,648      SQYD 5.00 38,240.00
0011 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -319      CUYD 0.01 -3.19
0012 510-01-00200 Pavement Patching (12" Minimum Thickness) 3,000      SQYD 85.00 255,000.00
0013 510-02-00100 Pavement Widening 3,282.4    SQYD 30.00 98,472.00
0014 701-02-02000 Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) 146      LNFT 175.00 25,550.00
0015 701-02-02040 Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) 88      LNFT 225.00 19,800.00
0016 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 44      LNFT 250.00 11,000.00
0017 701-02-02160 Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) 48      LNFT 275.00 13,200.00
0018 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 275      LNFT 40.00 11,000.00
0019 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 78      LNFT 60.00 4,680.00
0020 704-03-00100 Blocked Out Guard Rail 381.3    LNFT 20.00 7,626.00
0021 704-11-00100 Guard Rail End Treatment (Flared) 11      EACH 2,000.00 22,000.00
0022 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00
0023 713-02-00500 Temporary Pavement Markings (24" Width) 44      LNFT 0.75 33.00
0024 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 13.4    MILE 400.00 5,360.00
0025 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 6.172  MILE 475.00 2,931.70
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 35.238  MILE 550.00 19,380.90
0027 717-01-00100 Seeding 161      LB 8.00 1,288.00
0028 718-01-00100 Fertilizer 5,382      LB 0.50 2,691.00
0029 726-01-00100 Bedding Material 49.6    CUYD 50.00 2,480.00
0030 727-01-00100 Mobilization 1      LUMP 305,000.00 305,000.00
0031 729-16-00300 Object Marker Assembly (Type 3) 35      EACH 75.00 2,625.00
0032 731-02-00100 Reflectorized Raised Pavement Markers 1,652      EACH 5.25 8,673.00
0033 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 22      LNFT 100.00 2,200.00
0034 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.119  MILE 2,500.00 42,797.50
0035 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.586  MILE 825.00 2,133.45
0036 735-01-00100 Mailboxes 187      EACH 15.00 2,805.00
0037 735-02-00100 Mailbox Supports (Single) 164      EACH 150.00 24,600.00
0038 735-04-00100 Mailbox Supports (Multiple) 5      EACH 250.00 1,250.00
0039 740-01-00100 Construction Layout 1      LUMP 20,000.00 20,000.00
0040 NS-200-00020 Cleaning Existing Ditches 1,400      LNFT 12.00 16,800.00
0041 NS-500-00280 Surface Preparation 1      LUMP 50,000.00 50,000.00
0042 NS-700-00020 Adjusting Guard Rail 522      LNFT 12.00 6,264.00
0043 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 51,992.8    GAL 3.15 163,777.32
0044 507-02-00200 Aggregate (S2) (Stone Only) 76,460      SQYD 1.10 84,106.00
0045 507-02-00300 Aggregate (S3) (Stone Only) 76,460      SQYD 0.90 68,814.00
             
    CONTRACTOR TOTAL       3,692,935.23