Bid Tabulations
Letting of
02/23/2011
LA DOTD Headquarters
| Lead Project: 831-15-0003 | |
| Parish: Lincoln | |
| Routes: LA 3074 | |
| Description: JCT. LA 563 TO JCT. LA 544 | |
| Type Const: CLEARING AND GRUBBING, GRADING, IN-PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $573,277.28 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $508,374.41 |
| 2 | 40615 | Specialty Trackhoe & Dozer Serv.Inc | $613,925.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Specialty Trackhoe & Dozer Serv.Inc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Tree Trimming | 1 | LUMP | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 500.00 | 500.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 18 | SQYD | 10.00 | 180.00 | 16.00 | 288.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 467 | CUYD | 1.00 | 467.00 | 20.00 | 9,340.00 |
| 0005 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 417 | CUYD | 14.00 | 5,838.00 | 20.00 | 8,340.00 |
| 0006 | 303-02-00100 | Removal of Existing Patches | 150 | SQYD | 10.00 | 1,500.00 | 35.00 | 5,250.00 |
| 0007 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 16,608 | SQYD | 8.00 | 132,864.00 | 7.50 | 124,560.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 50.00 | 1,600.00 | 103.00 | 3,296.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 104.1 | CUYD | 40.00 | 4,164.00 | 95.00 | 9,889.50 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,755 | TON | 85.00 | 149,175.00 | 117.00 | 205,335.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 155.6 | TON | 50.00 | 7,780.00 | 140.00 | 21,784.00 |
| 0012 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 15,339 | GAL | 2.71 | 41,568.69 | 3.00 | 46,017.00 |
| 0013 | 507-02-00200 | Aggregate (S2) | 22,558 | SQYD | 1.16 | 26,167.28 | 1.50 | 33,837.00 |
| 0014 | 507-02-00300 | Aggregate (S3) | 22,558 | SQYD | 0.93 | 20,978.94 | 1.00 | 22,558.00 |
| 0015 | 701-12-01100 | Corrugated Metal Pipe (Extension) (36") | 12 | LNFT | 350.00 | 4,200.00 | 185.00 | 2,220.00 |
| 0016 | 701-15-00100 | Concrete Collar | 2 | EACH | 500.00 | 1,000.00 | 1,200.00 | 2,400.00 |
| 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 14.2 | SQYD | 100.00 | 1,420.00 | 130.00 | 1,846.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 32,000.00 | 32,000.00 | 5,500.00 | 5,500.00 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.12 | MILE | 400.00 | 448.00 | 600.00 | 672.00 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.084 | MILE | 1.00 | 1.08 | 500.00 | 542.00 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.568 | MILE | 1.00 | 15.57 | 600.00 | 9,340.80 |
| 0022 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,103 | EACH | 0.85 | 937.55 | 0.75 | 827.25 |
| 0023 | 716-01-00100 | Mulch (Vegetative) | 4.4 | TON | 1,000.00 | 4,400.00 | 800.00 | 3,520.00 |
| 0024 | 717-01-00100 | Seeding | 132 | LB | 10.00 | 1,320.00 | 10.00 | 1,320.00 |
| 0025 | 718-01-00100 | Fertilizer | 2,200 | LB | 1.00 | 2,200.00 | 0.50 | 1,100.00 |
| 0026 | 726-01-00100 | Bedding Material | 5.6 | CUYD | 100.00 | 560.00 | 120.00 | 672.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 32,000.00 | 32,000.00 | 55,000.00 | 55,000.00 |
| 0028 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 100.00 | 200.00 | 175.00 | 350.00 |
| 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 405 | EACH | 4.50 | 1,822.50 | 4.85 | 1,964.25 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.824 | MILE | 2,500.00 | 9,560.00 | 3,000.00 | 11,472.00 |
| 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.26 | MILE | 800.00 | 208.00 | 1,000.00 | 260.00 |
| 0032 | 737-01-00100 | Painted Traffic Striping (Solid Line) (4" Width) | 3.168 | MILE | 600.00 | 1,900.80 | 1,000.00 | 3,168.00 |
| 0033 | 737-02-00100 | Painted Traffic Striping (Broken Line) (4" Width) | 0.66 | MILE | 300.00 | 198.00 | 450.00 | 297.00 |
| 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 96 | INLF | 12.50 | 1,200.00 | 10.00 | 960.00 |
| CONTRACTOR TOTAL | 508,374.41 | 613,925.80 | ||||||