Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 824-06-0024 | |
| Parish: Iberville | |
| Routes: LA 405, LA 75 | |
| Description: 713' SOUTH OF STEWART ST. - 1.24 MILES SOUTH OF LA 1 | |
| Type Const: GRADING, LIME TREATMENT, CEMENT TREATED BASE COURSE, COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $3,717,263.36 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $3,529,443.97 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $3,668,322.68 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $4,199,900.55 |
| 4 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $4,460,115.45 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Mcdonald & Son, LLC. |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - Barber Bros. Contracting Co., L.L.C |
- 4 - F.G. Sullivan, Jr. Contractor LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 430 | SQYD | 7.50 | 3,225.00 | 10.00 | 4,300.00 | 10.00 | 4,300.00 | 7.00 | 3,010.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 420 | LNFT | 3.00 | 1,260.00 | 10.00 | 4,200.00 | 10.00 | 4,200.00 | 5.00 | 2,100.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) STATIONS 172+10, 266+08, 289+05, AND 309+69 | 200 | LNFT | 9.75 | 1,950.00 | 12.00 | 2,400.00 | 30.00 | 6,000.00 | 10.00 | 2,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,800 | CUYD | 9.00 | 16,200.00 | 1.00 | 1,800.00 | 10.00 | 18,000.00 | 8.00 | 14,400.00 |
| 0005 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 3,298 | CUYD | 9.00 | 29,682.00 | 1.00 | 3,298.00 | 8.00 | 26,384.00 | 10.00 | 32,980.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 48 | EACH | 250.00 | 12,000.00 | 90.00 | 4,320.00 | 65.00 | 3,120.00 | 90.00 | 4,320.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 18,652 | LNFT | 2.50 | 46,630.00 | 1.50 | 27,978.00 | 1.60 | 29,843.20 | 1.35 | 25,180.20 |
| 0008 | 303-01-00300 | In-Place Cement Stabilzed Base Course (10" Thick) | 118,669 | SQYD | 6.05 | 717,947.45 | 5.00 | 593,345.00 | 7.00 | 830,683.00 | 10.00 | 1,186,690.00 |
| 0009 | 304-01-00100 | Lime | 84.01 | TON | 160.00 | 13,441.60 | 1.00 | 84.01 | 200.00 | 16,802.00 | 150.00 | 12,601.50 |
| 0010 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 2,967 | SQYD | 2.50 | 7,417.50 | 1.00 | 2,967.00 | 1.00 | 2,967.00 | 2.00 | 5,934.00 |
| 0011 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 84.1 | SQYD | 6.00 | 504.60 | 1.00 | 84.10 | 20.00 | 1,682.00 | 4.00 | 336.40 |
| 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 650 | CUYD | 20.00 | 13,000.00 | 1.00 | 650.00 | 60.00 | 39,000.00 | 30.00 | 19,500.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 22,055.8 | TON | 71.75 | 1,582,503.65 | 71.00 | 1,565,961.80 | 80.00 | 1,764,464.00 | 78.00 | 1,720,352.40 |
| 0014 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,492.4 | TON | 1.00 | 1,492.40 | 1.00 | 1,492.40 | 110.00 | 164,164.00 | 78.00 | 116,407.20 |
| 0015 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 77,911 | GAL | 2.99 | 232,953.89 | 3.15 | 245,419.65 | 3.60 | 280,479.60 | 3.00 | 233,733.00 |
| 0016 | 507-02-00200 | Aggregate (S2) | 114,575 | SQYD | 0.80 | 91,660.00 | 0.75 | 85,931.25 | 1.00 | 114,575.00 | 0.80 | 91,660.00 |
| 0017 | 507-02-00300 | Aggregate (S3) | 114,575 | SQYD | 0.70 | 80,202.50 | 0.65 | 74,473.75 | 0.75 | 85,931.25 | 0.65 | 74,473.75 |
| 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 114,575 | SQYD | 1.50 | 171,862.50 | 1.85 | 211,963.75 | 2.30 | 263,522.50 | 2.75 | 315,081.25 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,774 | CUYD | 0.01 | -47.74 | 1.00 | -4,774.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 0020 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 4,320 | LNFT | 2.00 | 8,640.00 | 2.00 | 8,640.00 | 2.00 | 8,640.00 | 2.00 | 8,640.00 |
| 0021 | 602-03-00100 | Cleaning and Sealing Random cracks | 864 | LNFT | 3.50 | 3,024.00 | 5.00 | 4,320.00 | 5.00 | 4,320.00 | 2.00 | 1,728.00 |
| 0022 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 60 | SQYD | 185.00 | 11,100.00 | 185.00 | 11,100.00 | 285.00 | 17,100.00 | 300.00 | 18,000.00 |
| 0023 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 50 | SQYD | 170.00 | 8,500.00 | 165.00 | 8,250.00 | 275.00 | 13,750.00 | 285.00 | 14,250.00 |
| 0024 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 65 | SQYD | 150.00 | 9,750.00 | 155.00 | 10,075.00 | 265.00 | 17,225.00 | 280.00 | 18,200.00 |
| 0025 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 64 | LNFT | 67.00 | 4,288.00 | 80.00 | 5,120.00 | 122.00 | 7,808.00 | 130.00 | 8,320.00 |
| 0026 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 136 | LNFT | 69.50 | 9,452.00 | 85.00 | 11,560.00 | 152.00 | 20,672.00 | 160.00 | 21,760.00 |
| 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 72.00 | 1,152.00 | 100.00 | 1,600.00 | 300.00 | 4,800.00 | 158.00 | 2,528.00 |
| 0028 | 701-15-00100 | Concrete Collar | 2 | EACH | 575.00 | 1,150.00 | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | 850.00 | 1,700.00 |
| 0029 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 150 | LNFT | 30.00 | 4,500.00 | 65.00 | 9,750.00 | 35.00 | 5,250.00 | 35.00 | 5,250.00 |
| 0030 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 17.50 | 875.00 | 135.00 | 6,750.00 | 25.00 | 1,250.00 | 17.00 | 850.00 |
| 0031 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,250.00 | 9,000.00 | 2,500.00 | 10,000.00 | 3,000.00 | 12,000.00 | 2,100.00 | 8,400.00 |
| 0032 | 707-01-00100 | Concrete Curb | 96 | LNFT | 9.94 | 954.24 | 15.00 | 1,440.00 | 35.00 | 3,360.00 | 35.00 | 3,360.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,500.00 | 10,500.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 130,000.00 | 130,000.00 |
| 0034 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 260 | LNFT | 0.25 | 65.00 | 0.25 | 65.00 | 1.00 | 260.00 | 0.15 | 39.00 |
| 0035 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,100 | LNFT | 1.00 | 1,100.00 | 1.00 | 1,100.00 | 1.50 | 1,650.00 | 0.50 | 550.00 |
| 0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.195 | MILE | 400.00 | 8,478.00 | 400.00 | 8,478.00 | 750.00 | 15,896.25 | 500.00 | 10,597.50 |
| 0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.7 | MILE | 475.00 | 6,982.50 | 1.00 | 14.70 | 500.00 | 7,350.00 | 100.00 | 1,470.00 |
| 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.015 | MILE | 375.00 | 23,630.63 | 1.00 | 63.02 | 500.00 | 31,507.50 | 50.00 | 3,150.75 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,500.00 | 3,500.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 240,000.00 | 240,000.00 | 525,000.00 | 525,000.00 | 152,000.00 | 152,000.00 | 124,500.00 | 124,500.00 |
| 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 50 | EACH | 65.00 | 3,250.00 | 75.00 | 3,750.00 | 75.00 | 3,750.00 | 45.00 | 2,250.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 75.00 | 300.00 | 85.00 | 340.00 | 75.00 | 300.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,135 | EACH | 5.25 | 5,958.75 | 5.25 | 5,958.75 | 6.00 | 6,810.00 | 6.00 | 6,810.00 |
| 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 260 | LNFT | 1.35 | 351.00 | 1.35 | 351.00 | 1.50 | 390.00 | 1.40 | 364.00 |
| 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,100 | LNFT | 4.50 | 4,950.00 | 4.50 | 4,950.00 | 5.00 | 5,500.00 | 5.00 | 5,500.00 |
| 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.005 | MILE | 2,500.00 | 52,512.50 | 2,500.00 | 52,512.50 | 2,850.00 | 59,864.25 | 2,700.00 | 56,713.50 |
| 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.9 | MILE | 850.00 | 4,165.00 | 850.00 | 4,165.00 | 1,000.00 | 4,900.00 | 900.00 | 4,410.00 |
| 0048 | 735-01-00100 | Mailboxes | 63 | EACH | 1.00 | 63.00 | 1.00 | 63.00 | 6.00 | 378.00 | 5.00 | 315.00 |
| 0049 | 735-02-00100 | Mailbox Supports (Single) | 58 | EACH | 109.00 | 6,322.00 | 105.00 | 6,090.00 | 150.00 | 8,700.00 | 125.00 | 7,250.00 |
| 0050 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 170.00 | 170.00 | 175.00 | 175.00 | 220.00 | 220.00 | 195.00 | 195.00 |
| 0051 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 315.00 | 315.00 | 275.00 | 275.00 | 320.00 | 320.00 | 295.00 | 295.00 |
| 0052 | 739-01-00100 | Hydro-Seeding | 8.56 | ACRE | 1,000.00 | 8,560.00 | 950.00 | 8,132.00 | 1,200.00 | 10,272.00 | 1,000.00 | 8,560.00 |
| 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 40,500.00 | 40,500.00 | 15,000.00 | 15,000.00 | 49,900.00 | 49,900.00 |
| 0054 | NS-200-00020 | Cleaning Existing Ditches | 2,000 | LNFT | 6.50 | 13,000.00 | 10.00 | 20,000.00 | 10.00 | 20,000.00 | 10.00 | 20,000.00 |
| 0055 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 150 | TON | 100.00 | 15,000.00 | 70.00 | 10,500.00 | 90.00 | 13,500.00 | 200.00 | 30,000.00 |
| 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 13,200 | INLF | 1.25 | 16,500.00 | 0.90 | 11,880.00 | 0.50 | 6,600.00 | 1.00 | 13,200.00 |
| CONTRACTOR TOTAL | 3,529,443.97 | 3,668,322.68 | 4,199,900.55 | 4,460,115.45 | ||||||||