Bid Tabulations
Letting of
11/17/2010
LA DOTD Headquarters
| Lead Project: 823-31-0005 | |
| Parish: Iberia | |
| Routes: LA 680 | |
| Description: LA 86 - 0.227 MI SE OF ST. MARTIN PARISH LINE | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE CEMENT STABALIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $874,080.48 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 33663 | Glenn Lege Construction Inc | $729,979.76 |
| 2 | 51821 | Elliott Construction, LLC | $771,515.36 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $797,422.70 |
| 4 | 34356 | Prairie Contractors Inc. | $822,909.00 |
| 5 | 12312 | Gilchrist Construction Co. LLC | $823,186.86 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Glenn Lege Construction Inc |
- 2 - Elliott Construction, LLC |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Prairie Contractors Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 56.00 | 672.00 | 20.00 | 240.00 | 150.00 | 1,800.00 | 70.00 | 840.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 485 | CUYD | 15.00 | 7,275.00 | 15.00 | 7,275.00 | 15.00 | 7,275.00 | 18.00 | 8,730.00 |
| 0003 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 50 | CUYD | 25.00 | 1,250.00 | 20.00 | 1,000.00 | 15.00 | 750.00 | 18.00 | 900.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 200.00 | 4,000.00 | 50.00 | 1,000.00 | 300.00 | 6,000.00 | 300.00 | 6,000.00 |
| 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 19,527 | SQYD | 5.00 | 97,635.00 | 6.25 | 122,043.75 | 6.40 | 124,972.80 | 6.40 | 124,972.80 |
| 0006 | 304-05-00100 | Lime Treatment (Type E) | 276.8 | TON | 345.00 | 95,496.00 | 346.00 | 95,772.80 | 445.00 | 123,176.00 | 400.00 | 110,720.00 |
| 0007 | 308-02-00100 | Removal of Existing Patches | 100 | SQYD | 22.00 | 2,200.00 | 12.00 | 1,200.00 | 28.01 | 2,801.00 | 18.00 | 1,800.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 50 | CUYD | 50.00 | 2,500.00 | 20.00 | 1,000.00 | 90.00 | 4,500.00 | 150.00 | 7,500.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 20 | CUYD | 50.00 | 1,000.00 | 20.00 | 400.00 | 80.00 | 1,600.00 | 150.00 | 3,000.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 5,171 | TON | 75.00 | 387,825.00 | 84.50 | 436,949.50 | 80.00 | 413,680.00 | 80.00 | 413,680.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 100 | TON | 165.00 | 16,500.00 | 132.00 | 13,200.00 | 200.00 | 20,000.00 | 175.00 | 17,500.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 14,464 | SQYD | 2.00 | 28,928.00 | 1.50 | 21,696.00 | 2.02 | 29,217.28 | 2.00 | 28,928.00 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -527 | CUYD | 1.00 | -527.00 | 0.01 | -5.27 | 0.10 | -52.70 | 0.01 | -5.27 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 10 | SQYD | 85.00 | 850.00 | 100.00 | 1,000.00 | 200.00 | 2,000.00 | 175.00 | 1,750.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,500.00 | 15,500.00 | 5,500.00 | 5,500.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.466 | MILE | 650.00 | 1,602.90 | 550.00 | 1,356.30 | 1.00 | 2.47 | 400.00 | 986.40 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.466 | MILE | 550.00 | 1,356.30 | 424.05 | 1,045.71 | 1.00 | 2.47 | 0.01 | 0.02 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.381 | MILE | 750.00 | 4,035.75 | 605.00 | 3,255.51 | 1.00 | 5.38 | 0.01 | 0.05 |
| 0019 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 36,210.00 | 36,210.00 | 35,000.00 | 35,000.00 | 30,500.00 | 30,500.00 | 40,000.00 | 40,000.00 |
| 0021 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 230.00 | 920.00 | 77.00 | 308.00 | 80.00 | 320.00 | 85.00 | 340.00 |
| 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 165 | EACH | 5.25 | 866.25 | 5.78 | 953.70 | 5.00 | 825.00 | 6.00 | 990.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.69 | MILE | 2,625.00 | 7,061.25 | 2,750.00 | 7,397.50 | 2,600.00 | 6,994.00 | 2,600.00 | 6,994.00 |
| 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.233 | MILE | 1,070.00 | 1,319.31 | 935.00 | 1,152.86 | 1,000.00 | 1,233.00 | 1,000.00 | 1,233.00 |
| 0025 | 735-01-00100 | Mailboxes | 10 | EACH | 1.00 | 10.00 | 1.10 | 11.00 | 1.10 | 11.00 | 5.00 | 50.00 |
| 0026 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 186.00 | 1,674.00 | 187.00 | 1,683.00 | 200.00 | 1,800.00 | 200.00 | 1,800.00 |
| 0027 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 220.00 | 220.00 | 220.00 | 220.00 | 210.00 | 210.00 | 300.00 | 300.00 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | 100.00 | 100.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 120 | INLF | 5.00 | 600.00 | 3.00 | 360.00 | 5.00 | 600.00 | 15.00 | 1,800.00 |
| CONTRACTOR TOTAL | 729,979.76 | 771,515.36 | 797,422.70 | 822,909.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Gilchrist Construction Co. LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 25.00 | 300.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 485 | CUYD | 18.00 | 8,730.00 |
| 0003 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 50 | CUYD | 20.00 | 1,000.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 100.00 | 2,000.00 |
| 0005 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 19,527 | SQYD | 5.95 | 116,185.65 |
| 0006 | 304-05-00100 | Lime Treatment (Type E) | 276.8 | TON | 380.00 | 105,184.00 |
| 0007 | 308-02-00100 | Removal of Existing Patches | 100 | SQYD | 5.00 | 500.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 50 | CUYD | 95.00 | 4,750.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 20 | CUYD | 95.00 | 1,900.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 5,171 | TON | 82.00 | 424,022.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 100 | TON | 180.00 | 18,000.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 14,464 | SQYD | 1.10 | 15,910.40 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -527 | CUYD | 1.00 | -527.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 10 | SQYD | 110.00 | 1,100.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.466 | MILE | 600.00 | 1,479.60 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.466 | MILE | 100.00 | 246.60 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.381 | MILE | 100.00 | 538.10 |
| 0019 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 6,000.00 | 6,000.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 78,000.00 | 78,000.00 |
| 0021 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 80.00 | 320.00 |
| 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 165 | EACH | 6.00 | 990.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.69 | MILE | 2,700.00 | 7,263.00 |
| 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.233 | MILE | 985.00 | 1,214.51 |
| 0025 | 735-01-00100 | Mailboxes | 10 | EACH | 6.50 | 65.00 |
| 0026 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 200.00 | 1,800.00 |
| 0027 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 375.00 | 375.00 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 120 | INLF | 7.00 | 840.00 |
| CONTRACTOR TOTAL | 823,186.86 | |||||