LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 819-19-0008
Parish: East Feliciana
Routes: LA 963
Description: LA 963: LA 68 - LA 10
Type Const: BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE, GUARD RAIL AND RELATED WORK
Estimated Construction Cost: $3,037,752.78


RankLicenseBidderConstruction Bid
1 00046 Barber Bros. Contracting Co., L.L.C $2,739,420.50
2 25088 RCS Contractors, Inc. $2,818,046.27
3 12487 Diamond B Construction Co., L.L.C. $3,107,406.96
4 12312 Gilchrist Construction Co. LLC $3,184,757.24
5 00481 Coastal Bridge Co., L.L.C. $3,188,915.66


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Barber Bros. Contracting Co., L.L.C
- 2 -
RCS Contractors, Inc.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions REMOVAL OF CHECK DAMS AT STA 23+27 AND 24+11 1      LUMP 3,000.00 3,000.00 500.00 500.00 2,500.00 2,500.00 5,000.00 5,000.00
0002 202-02-06100 Removal of Concrete Walks and Drives 219.3    SQYD 15.00 3,289.50 10.00 2,193.00 26.00 5,701.80 20.00 4,386.00
0003 202-02-14500 Removal of Guard Rail 840      LNFT 5.00 4,200.00 3.50 2,940.00 5.00 4,200.00 9.00 7,560.00
0004 202-02-32100 Removal of Pipe (Cross Drain) STA 189+52 62      LNFT 20.00 1,240.00 1.00 62.00 12.00 744.00 20.00 1,240.00
0005 202-02-32100 Removal of Pipe (Cross Drain) STA 274+00 37      LNFT 25.00 925.00 1.00 37.00 12.00 444.00 20.00 740.00
0006 202-02-32100 Removal of Pipe (Cross Drain) STA 17+92 60      LNFT 35.00 2,100.00 1.00 60.00 18.00 1,080.00 20.00 1,200.00
0007 202-02-32100 Removal of Pipe (Cross Drain) STA 105+04 60      LNFT 20.00 1,200.00 25.00 1,500.00 12.00 720.00 20.00 1,200.00
0008 202-02-32100 Removal of Pipe (Cross Drain) STA 200+08 30      LNFT 20.00 600.00 1.00 30.00 12.00 360.00 20.00 600.00
0009 202-02-32100 Removal of Pipe (Cross Drain) STA 231+76 30      LNFT 20.00 600.00 1.00 30.00 12.00 360.00 20.00 600.00
0010 202-02-32100 Removal of Pipe (Cross Drain) STA 41+68 40      LNFT 20.00 800.00 25.00 1,000.00 12.00 480.00 20.00 800.00
0011 202-02-32100 Removal of Pipe (Cross Drain) STA 62+80 40      LNFT 20.00 800.00 25.00 1,000.00 12.00 480.00 20.00 800.00
0012 202-02-32100 Removal of Pipe (Cross Drain) STA 83+92 40      LNFT 20.00 800.00 25.00 1,000.00 12.00 480.00 20.00 800.00
0013 202-02-32120 Removal of Pipe (Side Drain) STA 20+56 30      LNFT 20.00 600.00 1.00 30.00 12.00 360.00 20.00 600.00
0014 203-05-00100 Excavation and Embankment 1      LUMP 16,000.00 16,000.00 15,000.00 15,000.00 3,000.00 3,000.00 30,000.00 30,000.00
0015 203-07-00100 Borrow (Vehicular Measurement) 2,066      CUYD 18.00 37,188.00 12.00 24,792.00 36.00 74,376.00 20.00 41,320.00
0016 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,555      CUYD 15.00 23,325.00 12.00 18,660.00 26.00 40,430.00 20.00 31,100.00
0017 204-02-00100 Temporary Hay or Straw Bales 5,548      EACH 5.00 27,740.00 11.00 61,028.00 15.00 83,220.00 15.00 83,220.00
0018 204-06-00100 Temporary Silt Fencing 1,956      LNFT 2.00 3,912.00 2.20 4,303.20 3.00 5,868.00 1.20 2,347.20
0019 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 73,740      SQYD 5.00 368,700.00 7.00 516,180.00 5.80 427,692.00 5.20 383,448.00
0020 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 2,335.2    CUYD 25.00 58,380.00 1.00 2,335.20 94.00 219,508.80 80.00 186,816.00
0021 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 380      CUYD 35.00 13,300.00 40.00 15,200.00 75.00 28,500.00 80.00 30,400.00
0022 502-01-00100 Superpave Asphaltic Concrete 15,516.1    TON 75.00 1,163,707.50 80.00 1,241,288.00 76.00 1,179,223.60 87.00 1,349,900.70
0023 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 805.5    TON 110.00 88,605.00 80.00 64,440.00 180.00 144,990.00 160.00 128,880.00
0024 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 50,143.2    GAL 3.75 188,037.00 4.00 200,572.80 3.50 175,501.20 3.70 185,529.84
0025 507-02-00200 Aggregate (S2) 73,740      SQYD 1.20 88,488.00 1.00 73,740.00 1.00 73,740.00 1.20 88,488.00
0026 507-02-00300 Aggregate (S3) 73,740      SQYD 1.00 73,740.00 0.85 62,679.00 0.80 58,992.00 0.95 70,053.00
0027 509-01-00100 Cold Planing Asphaltic Pavement 1,200      SQYD 3.00 3,600.00 4.00 4,800.00 10.00 12,000.00 10.00 12,000.00
0028 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -27      CUYD 0.00 0.00 0.00 0.00 0.10 -2.70 5.00 -135.00
0029 701-01-01000 Cross Drain Pipe (24" RCP/PP) CMP NOT ALLOWED 332      LNFT 90.00 29,880.00 150.00 49,800.00 120.00 39,840.00 90.00 29,880.00
0030 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) CMP NOT ALLOWED 150      LNFT 100.00 15,000.00 100.00 15,000.00 100.00 15,000.00 95.00 14,250.00
0031 701-10-01100 Reinforced Concrete Pipe (Extension) (36") 12      LNFT 350.00 4,200.00 150.00 1,800.00 185.00 2,220.00 200.00 2,400.00
0032 701-10-01140 Reinforced Concrete Pipe (Extension) (48") 20      LNFT 300.00 6,000.00 225.00 4,500.00 285.00 5,700.00 245.00 4,900.00
0033 701-15-00100 Concrete Collar 4      EACH 1,200.00 4,800.00 500.00 2,000.00 810.00 3,240.00 730.00 2,920.00
0034 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 300      LNFT 55.00 16,500.00 45.00 13,500.00 50.00 15,000.00 50.00 15,000.00
0035 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 250      LNFT 46.00 11,500.00 40.00 10,000.00 45.00 11,250.00 45.00 11,250.00
0036 704-03-00100 Blocked Out Guard Rail 275      LNFT 20.00 5,500.00 16.50 4,537.50 20.00 5,500.00 18.00 4,950.00
0037 704-11-00200 Guard Rail End Treatment (Tangent) 12      EACH 2,500.00 30,000.00 2,300.00 27,600.00 2,500.00 30,000.00 2,500.00 30,000.00
0038 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 23+69 206      SQYD 100.00 20,600.00 55.00 11,330.00 80.00 16,480.00 50.00 10,300.00
0039 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 17+92 56      SQYD 115.00 6,440.00 55.00 3,080.00 80.00 4,480.00 65.00 3,640.00
0040 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 20+56 11      SQYD 175.00 1,925.00 55.00 605.00 80.00 880.00 120.00 1,320.00
0041 713-01-00100 Temporary Signs and Barricades 1      LUMP 40,000.00 40,000.00 95,800.00 95,800.00 35,000.00 35,000.00 25,000.00 25,000.00
0042 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 16.5    MILE 220.00 3,630.00 250.00 4,125.00 170.00 2,805.00 245.00 4,042.50
0043 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.016  MILE 250.00 504.00 1.00 2.02 220.00 443.52 100.00 201.60
0044 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 42.602  MILE 250.00 10,650.50 1.00 42.60 320.00 13,632.64 100.00 4,260.20
0045 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 6      EACH 60.00 360.00 1.00 6.00 60.00 360.00 115.00 690.00
0046 726-01-00100 Bedding Material 92.8    CUYD 10.00 928.00 70.00 6,496.00 80.00 7,424.00 115.00 10,672.00
0047 727-01-00100 Mobilization 1      LUMP 140,000.00 140,000.00 35,000.00 35,000.00 132,500.00 132,500.00 150,000.00 150,000.00
0048 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 75.00 600.00 65.00 520.00 70.00 560.00 74.00 592.00
0049 729-16-00300 Object Marker Assembly (Type 3) 12      EACH 90.00 1,080.00 75.00 900.00 80.00 960.00 85.00 1,020.00
0050 731-02-00100 Reflectorized Raised Pavement Markers 734      EACH 5.00 3,670.00 5.25 3,853.50 7.00 5,138.00 6.00 4,404.00
0051 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 21.301  MILE 3,200.00 68,163.20 2,850.00 60,707.85 3,000.00 63,903.00 3,200.00 68,163.20
0052 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.336  MILE 1,800.00 604.80 850.00 285.60 1,600.00 537.60 1,000.00 336.00
0053 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 700.00 1,400.00 400.00 800.00 650.00 1,300.00 450.00 900.00
0054 735-01-00100 Mailboxes 30      EACH 2.00 60.00 6.00 180.00 1.10 33.00 10.00 300.00
0055 735-02-00100 Mailbox Supports (Single) 30      EACH 150.00 4,500.00 145.00 4,350.00 130.00 3,900.00 140.00 4,200.00
0056 739-01-00100 Hydro-Seeding 3.86   ACRE 1,500.00 5,790.00 1,050.00 4,053.00 1,100.00 4,246.00 1,200.00 4,632.00
0057 740-01-00100 Construction Layout 1      LUMP 20,000.00 20,000.00 15,000.00 15,000.00 21,000.00 21,000.00 6,500.00 6,500.00
0058 805-01-00300 Class A Concrete (Box Culvert Headwalls) 33.4    CUYD 100.00 3,340.00 1,200.00 40,080.00 1,350.00 45,090.00 1,200.00 40,080.00
0059 805-12-11040 Reinforced Concrete Box Culverts (7' x 5') (Cast-In-Place) 60      LNFT 1,500.00 90,000.00 1,200.00 72,000.00 725.00 43,500.00 1,000.00 60,000.00
0060 806-01-00100 Deformed Reinforcing Steel 2,142      LB 1.00 2,142.00 1.00 2,142.00 2.25 4,819.50 2.00 4,284.00
0061 NS-200-00020 Cleaning Existing Ditches 1,184      LNFT 8.00 9,472.00 5.00 5,920.00 15.00 17,760.00 8.00 9,472.00
0062 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 2,652      INLF 2.00 5,304.00 2.50 6,630.00 3.00 7,956.00 2.00 5,304.00
                         
    CONTRACTOR TOTAL       2,739,420.50   2,818,046.27   3,107,406.96   3,184,757.24



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions REMOVAL OF CHECK DAMS AT STA 23+27 AND 24+11 1      LUMP 2,000.00 2,000.00
0002 202-02-06100 Removal of Concrete Walks and Drives 219.3    SQYD 15.00 3,289.50
0003 202-02-14500 Removal of Guard Rail 840      LNFT 10.00 8,400.00
0004 202-02-32100 Removal of Pipe (Cross Drain) STA 189+52 62      LNFT 10.00 620.00
0005 202-02-32100 Removal of Pipe (Cross Drain) STA 274+00 37      LNFT 10.00 370.00
0006 202-02-32100 Removal of Pipe (Cross Drain) STA 17+92 60      LNFT 15.00 900.00
0007 202-02-32100 Removal of Pipe (Cross Drain) STA 105+04 60      LNFT 10.00 600.00
0008 202-02-32100 Removal of Pipe (Cross Drain) STA 200+08 30      LNFT 10.00 300.00
0009 202-02-32100 Removal of Pipe (Cross Drain) STA 231+76 30      LNFT 10.00 300.00
0010 202-02-32100 Removal of Pipe (Cross Drain) STA 41+68 40      LNFT 10.00 400.00
0011 202-02-32100 Removal of Pipe (Cross Drain) STA 62+80 40      LNFT 10.00 400.00
0012 202-02-32100 Removal of Pipe (Cross Drain) STA 83+92 40      LNFT 10.00 400.00
0013 202-02-32120 Removal of Pipe (Side Drain) STA 20+56 30      LNFT 10.00 300.00
0014 203-05-00100 Excavation and Embankment 1      LUMP 60,000.00 60,000.00
0015 203-07-00100 Borrow (Vehicular Measurement) 2,066      CUYD 10.00 20,660.00
0016 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 1,555      CUYD 20.00 31,100.00
0017 204-02-00100 Temporary Hay or Straw Bales 5,548      EACH 1.25 6,935.00
0018 204-06-00100 Temporary Silt Fencing 1,956      LNFT 2.25 4,401.00
0019 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 73,740      SQYD 6.80 501,432.00
0020 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 2,335.2    CUYD 5.00 11,676.00
0021 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 380      CUYD 25.00 9,500.00
0022 502-01-00100 Superpave Asphaltic Concrete 15,516.1    TON 69.00 1,070,610.90
0023 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 805.5    TON 125.00 100,687.50
0024 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 50,143.2    GAL 3.30 165,472.56
0025 507-02-00200 Aggregate (S2) 73,740      SQYD 1.05 77,427.00
0026 507-02-00300 Aggregate (S3) 73,740      SQYD 0.85 62,679.00
0027 509-01-00100 Cold Planing Asphaltic Pavement 1,200      SQYD 10.00 12,000.00
0028 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -27      CUYD 1.00 -27.00
0029 701-01-01000 Cross Drain Pipe (24" RCP/PP) CMP NOT ALLOWED 332      LNFT 110.00 36,520.00
0030 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) CMP NOT ALLOWED 150      LNFT 90.00 13,500.00
0031 701-10-01100 Reinforced Concrete Pipe (Extension) (36") 12      LNFT 175.00 2,100.00
0032 701-10-01140 Reinforced Concrete Pipe (Extension) (48") 20      LNFT 275.00 5,500.00
0033 701-15-00100 Concrete Collar 4      EACH 800.00 3,200.00
0034 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 300      LNFT 45.00 13,500.00
0035 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 250      LNFT 40.00 10,000.00
0036 704-03-00100 Blocked Out Guard Rail 275      LNFT 16.50 4,537.50
0037 704-11-00200 Guard Rail End Treatment (Tangent) 12      EACH 2,300.00 27,600.00
0038 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 23+69 206      SQYD 75.00 15,450.00
0039 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 17+92 56      SQYD 75.00 4,200.00
0040 712-04-00100 Flexible Revetment RIPRAP OR SACKED - FOR WORK NEAR STATION 20+56 11      SQYD 75.00 825.00
0041 713-01-00100 Temporary Signs and Barricades 1      LUMP 105,000.00 105,000.00
0042 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 16.5    MILE 9,240.00 152,460.00
0043 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.016  MILE 200.00 403.20
0044 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 42.602  MILE 300.00 12,780.60
0045 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 6      EACH 50.00 300.00
0046 726-01-00100 Bedding Material 92.8    CUYD 75.00 6,960.00
0047 727-01-00100 Mobilization 1      LUMP 300,000.00 300,000.00
0048 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 65.00 520.00
0049 729-16-00300 Object Marker Assembly (Type 3) 12      EACH 75.00 900.00
0050 731-02-00100 Reflectorized Raised Pavement Markers 734      EACH 6.00 4,404.00
0051 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 21.301  MILE 2,700.00 57,512.70
0052 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.336  MILE 1,500.00 504.00
0053 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 600.00 1,200.00
0054 735-01-00100 Mailboxes 30      EACH 10.00 300.00
0055 735-02-00100 Mailbox Supports (Single) 30      EACH 150.00 4,500.00
0056 739-01-00100 Hydro-Seeding 3.86   ACRE 1,100.00 4,246.00
0057 740-01-00100 Construction Layout 1      LUMP 145,000.00 145,000.00
0058 805-01-00300 Class A Concrete (Box Culvert Headwalls) 33.4    CUYD 1,250.00 41,750.00
0059 805-12-11040 Reinforced Concrete Box Culverts (7' x 5') (Cast-In-Place) 60      LNFT 650.00 39,000.00
0060 806-01-00100 Deformed Reinforcing Steel 2,142      LB 2.00 4,284.00
0061 NS-200-00020 Cleaning Existing Ditches 1,184      LNFT 12.00 14,208.00
0062 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 2,652      INLF 1.10 2,917.20
             
    CONTRACTOR TOTAL       3,188,915.66