Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 810-24-0048 | |
| Parish: Calcasieu | |
| Routes: US 90 | |
| Description: BROAD STREET | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PAVEMENT JOINT REPAIR, VIDEO DETECTOR DEVICE and VIDEO DETECTION SYSTEM, AND RELATED WORK. | |
| Estimated Construction Cost: $1,913,944.60 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $1,717,169.83 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $2,063,857.87 |
| 3 | 36384 | John Bailey, Inc. | $2,099,082.05 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - John Bailey, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 10 | EACH | 600.00 | 6,000.00 | 1,300.00 | 13,000.00 | 1,400.00 | 14,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 300 | SQYD | 10.00 | 3,000.00 | 13.50 | 4,050.00 | 14.00 | 4,200.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 1,138 | LNFT | 4.50 | 5,121.00 | 11.25 | 12,802.50 | 12.00 | 13,656.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 15 | LNFT | 70.00 | 1,050.00 | 20.00 | 300.00 | 100.00 | 1,500.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 600 | EACH | 12.00 | 7,200.00 | 10.00 | 6,000.00 | 20.00 | 12,000.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,200 | LNFT | 3.00 | 3,600.00 | 2.50 | 3,000.00 | 4.00 | 4,800.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 250 | CUYD | 30.00 | 7,500.00 | 35.00 | 8,750.00 | 85.00 | 21,250.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 12,487.6 | TON | 86.30 | 1,077,679.88 | 100.00 | 1,248,760.00 | 108.00 | 1,348,660.80 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 295.8 | TON | 150.00 | 44,370.00 | 225.00 | 66,555.00 | 112.00 | 33,129.60 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 59,960 | SQYD | 1.50 | 89,940.00 | 2.50 | 149,900.00 | 2.50 | 149,900.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,997 | CUYD | 0.01 | -49.97 | 0.10 | -499.70 | 0.01 | -49.97 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 400 | SQYD | 99.00 | 39,600.00 | 110.00 | 44,000.00 | 95.00 | 38,000.00 |
| 0013 | 510-03-00100 | Pavement Joint Repair | 15 | TON | 300.00 | 4,500.00 | 275.00 | 4,125.00 | 325.00 | 4,875.00 |
| 0014 | 701-14-00100 | Cleaning Existing Pipes | 300 | LNFT | 15.00 | 4,500.00 | 11.50 | 3,450.00 | 12.00 | 3,600.00 |
| 0015 | 702-03-00200 | Catch Basins (CB-02) | 10 | EACH | 4,000.00 | 40,000.00 | 5,000.00 | 50,000.00 | 5,400.00 | 54,000.00 |
| 0016 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,000.00 | 4,000.00 | 1,300.00 | 2,600.00 | 1,400.00 | 2,800.00 |
| 0017 | 702-04-00200 | Adjusting Catch Basins | 20 | EACH | 2,200.00 | 44,000.00 | 1,600.00 | 32,000.00 | 1,800.00 | 36,000.00 |
| 0018 | 704-03-00100 | Blocked Out Guard Rail | 118.8 | LNFT | 30.00 | 3,564.00 | 22.00 | 2,613.60 | 24.00 | 2,851.20 |
| 0019 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 60.00 | 1,500.00 | 65.00 | 1,625.00 | 70.00 | 1,750.00 |
| 0020 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 3,000.00 | 3,000.00 | 2,700.00 | 2,700.00 | 2,880.00 | 2,880.00 |
| 0021 | 706-01-00100 | Concrete Walk (4" Thick) | 493.5 | SQYD | 45.00 | 22,207.50 | 73.00 | 36,025.50 | 70.00 | 34,545.00 |
| 0022 | 706-04-00100 | Handicapped Curb Ramps | 41 | EACH | 625.00 | 25,625.00 | 650.00 | 26,650.00 | 700.00 | 28,700.00 |
| 0023 | 707-01-00100 | Concrete Curb | 1,138 | LNFT | 11.00 | 12,518.00 | 13.50 | 15,363.00 | 14.00 | 15,932.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,979.00 | 25,979.00 | 25,000.00 | 25,000.00 | 55,000.00 | 55,000.00 |
| 0025 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,700 | LNFT | 0.01 | 17.00 | 0.30 | 510.00 | 0.24 | 408.00 |
| 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 420 | LNFT | 0.01 | 4.20 | 1.50 | 630.00 | 1.20 | 504.00 |
| 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.944 | MILE | 500.00 | 4,472.00 | 285.00 | 2,549.04 | 575.00 | 5,142.80 |
| 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.95 | MILE | 0.01 | 0.04 | 535.00 | 2,113.25 | 360.00 | 1,422.00 |
| 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.704 | MILE | 0.01 | 0.08 | 620.00 | 4,776.48 | 720.00 | 5,546.88 |
| 0030 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 0.01 | 0.06 | 57.00 | 342.00 | 60.00 | 360.00 |
| 0031 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 0.01 | 0.04 | 57.00 | 228.00 | 60.00 | 240.00 |
| 0032 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 2,758 | EACH | 6.00 | 16,548.00 | 6.00 | 16,548.00 | 4.80 | 13,238.40 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 140,000.00 | 140,000.00 | 67,000.00 | 67,000.00 |
| 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,725 | EACH | 6.00 | 28,350.00 | 5.90 | 27,877.50 | 5.82 | 27,499.50 |
| 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,700 | LNFT | 1.85 | 3,145.00 | 1.50 | 2,550.00 | 1.20 | 2,040.00 |
| 0036 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 420 | LNFT | 6.00 | 2,520.00 | 5.00 | 2,100.00 | 3.90 | 1,638.00 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.704 | MILE | 3,000.00 | 23,112.00 | 2,800.00 | 21,571.20 | 3,060.00 | 23,574.24 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.95 | MILE | 900.00 | 3,555.00 | 950.00 | 3,752.50 | 828.00 | 3,270.60 |
| 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 240.00 | 960.00 | 222.00 | 888.00 |
| 0040 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 240.00 | 480.00 | 222.00 | 444.00 |
| 0041 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 300.00 | 1,200.00 | 250.00 | 1,000.00 | 228.00 | 912.00 |
| 0042 | 736-09-00100 | Loop Detector | 2,700 | LNFT | 13.50 | 36,450.00 | 13.50 | 36,450.00 | 14.50 | 39,150.00 |
| 0043 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 600 | LNFT | 2.00 | 1,200.00 | 1.75 | 1,050.00 | 1.80 | 1,080.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 |
| 0045 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,840 | INLF | 1.00 | 3,840.00 | 1.70 | 6,528.00 | 1.75 | 6,720.00 |
| 0046 | NS-602-00001 | Milling Concrete Pavement | 1,504 | SQYD | 13.00 | 19,552.00 | 18.00 | 27,072.00 | 6.00 | 9,024.00 |
| CONTRACTOR TOTAL | 1,717,169.83 | 2,063,857.87 | 2,099,082.05 | |||||||