Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 808-05-0010 | |
| Parish: Bossier | |
| Routes: LA 537 | |
| Description: STILLHOUSE BAYOU BRIDGE | |
| Type Const: GRADING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST SLAB SPAN BRIDGE, AND RELATED WORK. | |
| Estimated Construction Cost: $1,681,019.69 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 18546 | C W & W Contractors, Inc. | $1,593,073.30 |
| 2 | 01012 | Cecil D. Gassiott, LLC | $1,894,310.70 |
| 3 | 09476 | Key Constructors, Inc. | $2,566,034.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - C W & W Contractors, Inc. |
- 2 - Cecil D. Gassiott, LLC |
- 3 - Key Constructors, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 7,000.00 | 7,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Bridge to be removed Sta. 110+88 To Sta. 112+78 Conc. Bridge | 1 | EACH | 27,000.00 | 27,000.00 | 125,000.00 | 125,000.00 | 25,000.00 | 25,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 210 | LNFT | 5.00 | 1,050.00 | 12.00 | 2,520.00 | 4.00 | 840.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,169 | SQYD | 4.00 | 4,676.00 | 6.00 | 7,014.00 | 8.00 | 9,352.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 34,000.00 | 34,000.00 | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 185.00 | 740.00 | 150.00 | 600.00 |
| 0008 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 200.00 | 800.00 | 900.00 | 3,600.00 | 1,500.00 | 6,000.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,400 | LNFT | 3.00 | 4,200.00 | 5.00 | 7,000.00 | 3.50 | 4,900.00 |
| 0010 | 304-05-00100 | Lime Treatment (Type E) | 13.73 | TON | 260.00 | 3,569.80 | 240.00 | 3,295.20 | 400.00 | 5,492.00 |
| 0011 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 2,007 | SQYD | 8.00 | 16,056.00 | 14.00 | 28,098.00 | 10.00 | 20,070.00 |
| 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 42.7 | CUYD | 30.00 | 1,281.00 | 85.00 | 3,629.50 | 100.00 | 4,270.00 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 150 | CUYD | 30.00 | 4,500.00 | 50.00 | 7,500.00 | 75.00 | 11,250.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 397.4 | TON | 225.00 | 89,415.00 | 185.00 | 73,519.00 | 200.00 | 79,480.00 |
| 0015 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 57 | LNFT | 110.00 | 6,270.00 | 100.00 | 5,700.00 | 90.00 | 5,130.00 |
| 0016 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 23 | LNFT | 120.00 | 2,760.00 | 95.00 | 2,185.00 | 80.00 | 1,840.00 |
| 0017 | 704-03-00100 | Blocked Out Guard Rail | 225 | LNFT | 30.00 | 6,750.00 | 21.00 | 4,725.00 | 25.00 | 5,625.00 |
| 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 70.00 | 7,000.00 | 65.00 | 6,500.00 | 60.00 | 6,000.00 |
| 0019 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 3,000.00 | 3,000.00 | 2,200.00 | 2,200.00 | 2,500.00 | 2,500.00 |
| 0020 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 3,500.00 | 7,000.00 | 2,400.00 | 4,800.00 | 3,000.00 | 6,000.00 |
| 0021 | 705-01-00100 | Barbed Wire Fence | 530 | LNFT | 7.00 | 3,710.00 | 8.00 | 4,240.00 | 13.00 | 6,890.00 |
| 0022 | 708-01-00100 | Right-of-Way Monument | 9 | EACH | 100.00 | 900.00 | 600.00 | 5,400.00 | 100.00 | 900.00 |
| 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 9 | EACH | 50.00 | 450.00 | 150.00 | 1,350.00 | 100.00 | 900.00 |
| 0024 | 711-03-00400 | Riprap (55 lb) | 2,056.1 | TON | 85.00 | 174,768.50 | 110.00 | 226,171.00 | 125.00 | 257,012.50 |
| 0025 | 711-04-00100 | Geotextile Fabric | 2,706 | SQYD | 5.00 | 13,530.00 | 3.50 | 9,471.00 | 4.50 | 12,177.00 |
| 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 11,000.00 | 11,000.00 | 20,000.00 | 20,000.00 |
| 0027 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 9,504 | LNFT | 0.25 | 2,376.00 | 0.25 | 2,376.00 | 0.20 | 1,900.80 |
| 0028 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 60 | EACH | 5.00 | 300.00 | 5.00 | 300.00 | 5.00 | 300.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 3,000.00 | 3,000.00 | 9,000.00 | 9,000.00 | 20,000.00 | 20,000.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 180,000.00 | 180,000.00 | 250,000.00 | 250,000.00 |
| 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 110.00 | 440.00 | 75.00 | 300.00 |
| 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20 | EACH | 9.00 | 180.00 | 20.00 | 400.00 | 10.00 | 200.00 |
| 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.484 | MILE | 5,000.00 | 2,420.00 | 16,000.00 | 7,744.00 | 3,000.00 | 1,452.00 |
| 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.096 | MILE | 5,000.00 | 480.00 | 11,000.00 | 1,056.00 | 2,000.00 | 192.00 |
| 0035 | 739-01-00100 | Hydro-Seeding | 1.4 | ACRE | 2,500.00 | 3,500.00 | 4,300.00 | 6,020.00 | 1,850.00 | 2,590.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 |
| 0037 | 804-02-00100 | Treated Timber Piles (Noncoastal Treatment) | 640 | LNFT | 60.00 | 38,400.00 | 28.00 | 17,920.00 | 90.00 | 57,600.00 |
| 0038 | 804-03-02080 | Steel Piles (18" Pipe) | 3,465 | LNFT | 125.00 | 433,125.00 | 145.00 | 502,425.00 | 235.00 | 814,275.00 |
| 0039 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 5,000.00 | 5,000.00 | 250.00 | 250.00 | 10,000.00 | 10,000.00 |
| 0040 | 805-10-00100 | Bridge Superstructure and Substructure | 11 | SPAN | 37,000.00 | 407,000.00 | 33,000.00 | 363,000.00 | 50,000.00 | 550,000.00 |
| 0041 | 807-08-00100 | Structural Metalwork [Grade 36] | 1 | LUMP | 132,000.00 | 132,000.00 | 60,000.00 | 60,000.00 | 115,000.00 | 115,000.00 |
| 0042 | 812-01-00100 | Treated Timber (Land and Fresh Water) | 3.1 | MFBM | 3,000.00 | 9,300.00 | 12,000.00 | 37,200.00 | 10,000.00 | 31,000.00 |
| 0043 | 813-01-00100 | Concrete Approach Slabs | 111.12 | SQYD | 225.00 | 25,002.00 | 225.00 | 25,002.00 | 220.00 | 24,446.40 |
| 0044 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 432 | INLF | 2.00 | 864.00 | 10.00 | 4,320.00 | 50.00 | 21,600.00 |
| 0045 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,500.00 | 1,500.00 | 1,200.00 | 1,200.00 | 950.00 | 950.00 |
| CONTRACTOR TOTAL | 1,593,073.30 | 1,894,310.70 | 2,566,034.70 | |||||||