Bid Tabulations
Letting of
03/30/2011
LA DOTD Headquarters
| Lead Project: 744-48-0005 | |
| Parish: St. John | |
| Routes: | |
| Description: ST. JOHN EASTBANK MS. RIVER MULTI-USE TRAIL PHASE 1 | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE MULTI USE PATH, SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $515,229.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $411,016.20 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $925,906.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Coastal Bridge Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1.00 | 1.00 | 100,000.00 | 100,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 36 | SQYD | 75.00 | 2,700.00 | 50.00 | 1,800.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,727 | CUYD | 40.00 | 69,080.00 | 25.00 | 43,175.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 1.00 | 3.00 | 200.00 | 600.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 1.00 | 100.00 | 5.00 | 500.00 |
| 0007 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 50 | CUYD | 75.00 | 3,750.00 | 225.00 | 11,250.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,707.9 | TON | 77.00 | 208,508.30 | 135.00 | 365,566.50 |
| 0009 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 57.8 | SQYD | 100.00 | 5,780.00 | 85.00 | 4,913.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 130,000.00 | 130,000.00 |
| 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 41,000.00 | 41,000.00 | 100,000.00 | 100,000.00 |
| 0012 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 93 | SQFT | 30.00 | 2,790.00 | 30.00 | 2,790.00 |
| 0013 | 729-08-00200 | Mounting (3 1/2" Size Post) | 22 | EACH | 975.00 | 21,450.00 | 1,000.00 | 22,000.00 |
| 0014 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.134 | MILE | 850.00 | 1,813.90 | 850.00 | 1,813.90 |
| 0015 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 9 | EACH | 200.00 | 1,800.00 | 205.00 | 1,845.00 |
| 0016 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 9 | EACH | 300.00 | 2,700.00 | 300.00 | 2,700.00 |
| 0017 | 739-01-00100 | Hydro-Seeding | 3.7 | ACRE | 1,090.00 | 4,033.00 | 1,090.00 | 4,033.00 |
| 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,500.00 | 19,500.00 | 100,000.00 | 100,000.00 |
| 0019 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 70 | INLF | 0.10 | 7.00 | 6.00 | 420.00 |
| 0020 | NS-ENH-02000 | Benches (Park) 6' Metal | 3 | EACH | 2,000.00 | 6,000.00 | 2,500.00 | 7,500.00 |
| CONTRACTOR TOTAL | 411,016.20 | 925,906.40 | ||||||