Bid Tabulations
Letting of
04/14/2010
LA DOTD Headquarters
| Lead Project: 742-55-0111 | |
| Parish: Terrebonne | |
| Routes: | |
| Description: Terrebonne Parish Concrete Section Repairs | |
| Type Const: PAVEMENT PATCHING, PATCHING CONCRETE PACEMENT(ADDITIVE ALTERNATES) AND RELATED WORK. | |
| Estimated Construction Cost: $3,865,509.30 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 51292 | JJH Construction Co. LLC | $1,662,214.05 |
| 2 | 10830 | G & W Construction Co., Inc. | $1,733,177.76 |
| 3 | 06276 | Barriere Construction Co., LLC | $1,897,747.90 |
| 4 | 24901 | Hard Rock Construction Co. | $1,980,214.30 |
| 5 | 12198 | Byron E. Talbot Contractor, Inc. | $2,053,862.52 |
| 6 | 21982 | Forby Contracting, Inc. | $2,062,592.10 |
| 7 | 52550 | Gibbs & Register Inc | $2,198,473.28 |
| 8 | 34263 | La Contracting Enterprises Llc | $2,307,076.15 |
| 9 | 25088 | RCS Contractors, Inc. | $2,386,306.88 |
| 10 | 46547 | Interstate Improvement, Inc. | $2,471,551.10 |
| 11 | 49954 | Plus Concrete Inc. | $2,583,448.00 |
| 12 | 38936 | Southern Industrial Contractors Llc | $3,117,541.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - JJH Construction Co. LLC |
- 2 - G & W Construction Co., Inc. |
- 3 - Barriere Construction Co., LLC |
- 4 - Hard Rock Construction Co. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 173 | SQYD | 95.00 | 16,435.00 | 80.00 | 13,840.00 | 110.00 | 19,030.00 | 96.00 | 16,608.00 |
| 0002 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 2,207 | SQYD | 85.00 | 187,595.00 | 80.00 | 176,560.00 | 92.00 | 203,044.00 | 96.00 | 211,872.00 |
| 0003 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 9,194.7 | SQYD | 81.50 | 749,368.05 | 80.00 | 735,576.00 | 82.00 | 753,965.40 | 96.00 | 882,691.20 |
| 0004 | 707-01-00200 | Concrete Curb (Barrier) | 2,030 | LNFT | 12.00 | 24,360.00 | 9.00 | 18,270.00 | 18.00 | 36,540.00 | 6.00 | 12,180.00 |
| 0005 | 707-01-00300 | Concrete Curb (Mountable) | 1,298 | LNFT | 12.00 | 15,576.00 | 8.00 | 10,384.00 | 15.00 | 19,470.00 | 6.00 | 7,788.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 126,000.00 | 126,000.00 | 70,000.00 | 70,000.00 |
| 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 45,000.00 | 45,000.00 | 80,500.00 | 80,500.00 | 100,000.00 | 100,000.00 |
| 0008 | 731-02-00100 | Reflectorized Raised Pavement Markers | 300 | EACH | 6.00 | 1,800.00 | 7.00 | 2,100.00 | 5.25 | 1,575.00 | 4.75 | 1,425.00 |
| 0009 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 272 | LNFT | 2.00 | 544.00 | 1.80 | 489.60 | 1.10 | 299.20 | 0.95 | 258.40 |
| 0010 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 52.5 | LNFT | 5.00 | 262.50 | 6.00 | 315.00 | 4.00 | 210.00 | 3.50 | 183.75 |
| 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.754 | MILE | 3,000.00 | 8,262.00 | 3,300.00 | 9,088.20 | 2,650.00 | 7,298.10 | 2,400.00 | 6,609.60 |
| 0012 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.564 | MILE | 1,000.00 | 1,564.00 | 1,122.00 | 1,754.81 | 775.00 | 1,212.10 | 690.00 | 1,079.16 |
| 0013 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 0.038 | MILE | 2,000.00 | 76.00 | 2,000.00 | 76.00 | 1,750.00 | 66.50 | 1,584.00 | 60.19 |
| 0014 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 250.00 | 500.00 | 285.00 | 570.00 | 205.00 | 410.00 | 185.00 | 370.00 |
| 0015 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 250.00 | 250.00 | 349.80 | 349.80 | 225.00 | 225.00 | 195.00 | 195.00 |
| 0016 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 250.00 | 1,000.00 | 300.00 | 1,200.00 | 210.00 | 840.00 | 190.00 | 760.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 |
| SUBTOTAL GENERAL | 1,078,593 | 1,120,573 | 1,270,685 | 1,322,080 | ||||||||
| Alternate DA1 | ||||||||||||
| 0018 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 152.2 | SQYD | 95.00 | 14,459.00 | 88.00 | 13,393.60 | 110.00 | 16,742.00 | 96.00 | 14,611.20 |
| 0019 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,837.7 | SQYD | 85.00 | 156,204.50 | 88.00 | 161,717.60 | 92.00 | 169,068.40 | 96.00 | 176,419.20 |
| 0020 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 2,222 | SQYD | 80.00 | 177,760.00 | 88.00 | 195,536.00 | 82.00 | 182,204.00 | 96.00 | 213,312.00 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 967 | LNFT | 12.00 | 11,604.00 | 9.95 | 9,621.65 | 18.00 | 17,406.00 | 6.00 | 5,802.00 |
| 0022 | 707-01-00300 | Concrete Curb (Mountable) | 526 | LNFT | 12.00 | 6,312.00 | 8.95 | 4,707.70 | 15.00 | 7,890.00 | 6.00 | 3,156.00 |
| SUBTOTAL ALT DA1 | 366,340 | 384,977 | 393,310 | 413,300 | ||||||||
| Alternate EA1 | ||||||||||||
| 0023 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 92.5 | SQYD | 95.00 | 8,787.50 | 88.00 | 8,140.00 | 110.00 | 10,175.00 | 96.00 | 8,880.00 |
| 0024 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,281.3 | SQYD | 85.00 | 108,910.50 | 88.00 | 112,754.40 | 92.00 | 117,879.60 | 96.00 | 123,004.80 |
| 0025 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,127.8 | SQYD | 80.00 | 90,224.00 | 88.00 | 99,246.40 | 82.00 | 92,479.60 | 96.00 | 108,268.80 |
| 0026 | 707-01-00200 | Concrete Curb (Barrier) | 506 | LNFT | 12.00 | 6,072.00 | 9.95 | 5,034.70 | 18.00 | 9,108.00 | 6.00 | 3,036.00 |
| 0027 | 707-01-00300 | Concrete Curb (Mountable) | 274 | LNFT | 12.00 | 3,288.00 | 8.95 | 2,452.30 | 15.00 | 4,110.00 | 6.00 | 1,644.00 |
| SUBTOTAL ALT EA1 | 217,282.00 | 227,627.80 | 233,752.20 | 244,833.60 | ||||||||
| CONTRACTOR TOTAL | 1,662,214.05 | 1,733,177.76 | 1,897,747.90 | 1,980,214.30 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Byron E. Talbot Contractor, Inc. |
- 6 - Forby Contracting, Inc. |
- 7 - Gibbs & Register Inc |
- 8 - La Contracting Enterprises Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 173 | SQYD | 140.00 | 24,220.00 | 125.00 | 21,625.00 | 148.00 | 25,604.00 | 127.00 | 21,971.00 |
| 0002 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 2,207 | SQYD | 116.20 | 256,453.40 | 115.00 | 253,805.00 | 113.00 | 249,391.00 | 108.00 | 238,356.00 |
| 0003 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 9,194.7 | SQYD | 93.00 | 855,107.10 | 95.00 | 873,496.50 | 98.00 | 901,080.60 | 107.00 | 983,832.90 |
| 0004 | 707-01-00200 | Concrete Curb (Barrier) | 2,030 | LNFT | 9.30 | 18,879.00 | 15.00 | 30,450.00 | 13.00 | 26,390.00 | 9.50 | 19,285.00 |
| 0005 | 707-01-00300 | Concrete Curb (Mountable) | 1,298 | LNFT | 9.30 | 12,071.40 | 12.00 | 15,576.00 | 13.00 | 16,874.00 | 11.00 | 14,278.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 14,800.00 | 14,800.00 | 170,000.00 | 170,000.00 |
| 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 85,000.00 | 85,000.00 | 75,000.00 | 75,000.00 | 130,000.00 | 130,000.00 | 81,000.00 | 81,000.00 |
| 0008 | 731-02-00100 | Reflectorized Raised Pavement Markers | 300 | EACH | 5.55 | 1,665.00 | 4.75 | 1,425.00 | 5.00 | 1,500.00 | 6.25 | 1,875.00 |
| 0009 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 272 | LNFT | 1.45 | 394.40 | 0.95 | 258.40 | 1.00 | 272.00 | 1.25 | 340.00 |
| 0010 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 52.5 | LNFT | 4.80 | 252.00 | 3.50 | 183.75 | 3.75 | 196.88 | 4.50 | 236.25 |
| 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.754 | MILE | 2,650.00 | 7,298.10 | 2,400.00 | 6,609.60 | 2,600.00 | 7,160.40 | 3,100.00 | 8,537.40 |
| 0012 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.564 | MILE | 900.00 | 1,407.60 | 690.00 | 1,079.16 | 700.00 | 1,094.80 | 900.00 | 1,407.60 |
| 0013 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 0.038 | MILE | 1,590.00 | 60.42 | 1,584.00 | 60.19 | 1,600.00 | 60.80 | 2,000.00 | 76.00 |
| 0014 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 228.00 | 456.00 | 185.00 | 370.00 | 200.00 | 400.00 | 240.00 | 480.00 |
| 0015 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 281.00 | 281.00 | 195.00 | 195.00 | 200.00 | 200.00 | 250.00 | 250.00 |
| 0016 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 240.00 | 960.00 | 190.00 | 760.00 | 200.00 | 800.00 | 250.00 | 1,000.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 1.00 | 1.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| SUBTOTAL GENERAL | 1,324,506 | 1,323,394 | 1,380,824 | 1,557,925 | ||||||||
| Alternate DA1 | ||||||||||||
| 0018 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 152.2 | SQYD | 140.00 | 21,308.00 | 125.00 | 19,025.00 | 148.00 | 22,525.60 | 127.00 | 19,329.40 |
| 0019 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,837.7 | SQYD | 116.20 | 213,540.74 | 115.00 | 211,335.50 | 124.00 | 227,874.80 | 108.00 | 198,471.60 |
| 0020 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 2,222 | SQYD | 93.00 | 206,646.00 | 95.00 | 211,090.00 | 109.00 | 242,198.00 | 107.00 | 237,754.00 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 967 | LNFT | 9.30 | 8,993.10 | 15.00 | 14,505.00 | 13.00 | 12,571.00 | 9.50 | 9,186.50 |
| 0022 | 707-01-00300 | Concrete Curb (Mountable) | 526 | LNFT | 9.30 | 4,891.80 | 12.00 | 6,312.00 | 13.00 | 6,838.00 | 11.00 | 5,786.00 |
| SUBTOTAL ALT DA1 | 455,380 | 462,268 | 512,007 | 470,528 | ||||||||
| Alternate EA1 | ||||||||||||
| 0023 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 92.5 | SQYD | 140.00 | 12,950.00 | 125.00 | 11,562.50 | 148.00 | 13,690.00 | 127.00 | 11,747.50 |
| 0024 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,281.3 | SQYD | 116.20 | 148,887.06 | 115.00 | 147,349.50 | 124.00 | 158,881.20 | 108.00 | 138,380.40 |
| 0025 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,127.8 | SQYD | 93.00 | 104,885.40 | 95.00 | 107,141.00 | 109.00 | 122,930.20 | 107.00 | 120,674.60 |
| 0026 | 707-01-00200 | Concrete Curb (Barrier) | 506 | LNFT | 9.30 | 4,705.80 | 15.00 | 7,590.00 | 13.00 | 6,578.00 | 9.50 | 4,807.00 |
| 0027 | 707-01-00300 | Concrete Curb (Mountable) | 274 | LNFT | 9.30 | 2,548.20 | 12.00 | 3,288.00 | 13.00 | 3,562.00 | 11.00 | 3,014.00 |
| SUBTOTAL ALT EA1 | 273,976.46 | 276,931.00 | 305,641.40 | 278,623.50 | ||||||||
| CONTRACTOR TOTAL | 2,053,862.52 | 2,062,592.10 | 2,198,473.28 | 2,307,076.15 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - RCS Contractors, Inc. |
- 10 - Interstate Improvement, Inc. |
- 11 - Plus Concrete Inc. |
- 12 - Southern Industrial Contractors Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 173 | SQYD | 117.73 | 20,367.29 | 140.00 | 24,220.00 | 135.00 | 23,355.00 | 180.00 | 31,140.00 |
| 0002 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 2,207 | SQYD | 117.73 | 259,830.11 | 130.00 | 286,910.00 | 108.00 | 238,356.00 | 170.00 | 375,190.00 |
| 0003 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 9,194.7 | SQYD | 105.00 | 965,443.50 | 120.00 | 1,103,364.00 | 105.00 | 965,443.50 | 125.00 | 1,149,337.50 |
| 0004 | 707-01-00200 | Concrete Curb (Barrier) | 2,030 | LNFT | 12.00 | 24,360.00 | 10.00 | 20,300.00 | 35.00 | 71,050.00 | 20.00 | 40,600.00 |
| 0005 | 707-01-00300 | Concrete Curb (Mountable) | 1,298 | LNFT | 12.00 | 15,576.00 | 9.00 | 11,682.00 | 35.00 | 45,430.00 | 20.00 | 25,960.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 64,500.00 | 64,500.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 |
| 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 76,000.00 | 76,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 |
| 0008 | 731-02-00100 | Reflectorized Raised Pavement Markers | 300 | EACH | 4.75 | 1,425.00 | 4.75 | 1,425.00 | 7.50 | 2,250.00 | 7.00 | 2,100.00 |
| 0009 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 272 | LNFT | 0.95 | 258.40 | 0.95 | 258.40 | 1.00 | 272.00 | 1.20 | 326.40 |
| 0010 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 52.5 | LNFT | 3.50 | 183.75 | 3.50 | 183.75 | 4.00 | 210.00 | 3.50 | 183.75 |
| 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.754 | MILE | 2,400.00 | 6,609.60 | 2,400.00 | 6,609.60 | 3,000.00 | 8,262.00 | 3,500.00 | 9,639.00 |
| 0012 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.564 | MILE | 2,400.00 | 3,753.60 | 690.00 | 1,079.16 | 750.00 | 1,173.00 | 900.00 | 1,407.60 |
| 0013 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 0.038 | MILE | 690.00 | 26.22 | 1,584.00 | 60.19 | 2,000.00 | 76.00 | 5,175.00 | 196.65 |
| 0014 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 185.00 | 370.00 | 185.00 | 370.00 | 200.00 | 400.00 | 300.00 | 600.00 |
| 0015 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 195.00 | 195.00 | 195.00 | 195.00 | 200.00 | 200.00 | 400.00 | 400.00 |
| 0016 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 190.00 | 760.00 | 190.00 | 760.00 | 200.00 | 800.00 | 500.00 | 2,000.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 |
| SUBTOTAL GENERAL | 1,544,158 | 1,607,917 | 1,782,278 | 2,079,081 | ||||||||
| Alternate DA1 | ||||||||||||
| 0018 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 152.2 | SQYD | 127.73 | 19,440.51 | 140.00 | 21,308.00 | 135.00 | 20,547.00 | 180.00 | 27,396.00 |
| 0019 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,837.7 | SQYD | 127.73 | 234,729.42 | 130.00 | 238,901.00 | 108.00 | 198,471.60 | 170.00 | 312,409.00 |
| 0020 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 2,222 | SQYD | 115.00 | 255,530.00 | 120.00 | 266,640.00 | 105.00 | 233,310.00 | 125.00 | 277,750.00 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 967 | LNFT | 12.00 | 11,604.00 | 10.00 | 9,670.00 | 35.00 | 33,845.00 | 20.00 | 19,340.00 |
| 0022 | 707-01-00300 | Concrete Curb (Mountable) | 526 | LNFT | 12.00 | 6,312.00 | 9.00 | 4,734.00 | 35.00 | 18,410.00 | 20.00 | 10,520.00 |
| SUBTOTAL ALT DA1 | 527,616 | 541,253 | 504,584 | 647,415 | ||||||||
| Alternate EA1 | ||||||||||||
| 0023 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 92.5 | SQYD | 127.73 | 11,815.03 | 140.00 | 12,950.00 | 135.00 | 12,487.50 | 180.00 | 16,650.00 |
| 0024 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,281.3 | SQYD | 127.73 | 163,660.45 | 130.00 | 166,569.00 | 108.00 | 138,380.40 | 170.00 | 217,821.00 |
| 0025 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,127.8 | SQYD | 115.00 | 129,697.00 | 120.00 | 135,336.00 | 105.00 | 118,419.00 | 125.00 | 140,975.00 |
| 0026 | 707-01-00200 | Concrete Curb (Barrier) | 506 | LNFT | 12.00 | 6,072.00 | 10.00 | 5,060.00 | 35.00 | 17,710.00 | 20.00 | 10,120.00 |
| 0027 | 707-01-00300 | Concrete Curb (Mountable) | 274 | LNFT | 12.00 | 3,288.00 | 9.00 | 2,466.00 | 35.00 | 9,590.00 | 20.00 | 5,480.00 |
| SUBTOTAL ALT EA1 | 314,532.48 | 322,381.00 | 296,586.90 | 391,046.00 | ||||||||
| CONTRACTOR TOTAL | 2,386,306.88 | 2,471,551.10 | 2,583,448.00 | 3,117,541.90 | ||||||||