Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 742-55-0110 | |
| Parish: Terrebonne | |
| Routes: | |
| Description: Urban Systems Project - Terrebonne Parish Overlays | |
| Type Const: SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $1,040,078.25 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06487 | Huey Stockstill, Inc. | $946,615.30 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,027,925.13 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Huey Stockstill, Inc. |
- 2 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-06-00100 | Temporary Silt Fencing | 1,000 | LNFT | 0.10 | 100.00 | 1.00 | 1,000.00 |
| 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,018 | CUYD | 70.00 | 71,260.00 | 80.00 | 81,440.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 5,731.6 | TON | 81.00 | 464,259.60 | 90.00 | 515,844.00 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 69.8 | TON | 225.00 | 15,705.00 | 150.00 | 10,470.00 |
| 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,546.2 | SQYD | 87.00 | 221,519.40 | 95.00 | 241,889.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 45,000.00 | 45,000.00 |
| 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 94,000.00 | 94,000.00 | 100,000.00 | 100,000.00 |
| 0008 | 731-02-00100 | Reflectorized Raised Pavement Markers | 618 | EACH | 5.50 | 3,399.00 | 5.50 | 3,399.00 |
| 0009 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 354 | LNFT | 1.50 | 531.00 | 1.45 | 513.30 |
| 0010 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 100 | LNFT | 5.00 | 500.00 | 4.75 | 475.00 |
| 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.976 | MILE | 2,700.00 | 16,135.20 | 2,600.00 | 15,537.60 |
| 0012 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.075 | MILE | 900.00 | 967.50 | 875.00 | 940.63 |
| 0013 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 225.00 | 225.00 | 230.00 | 230.00 |
| 0014 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 225.00 | 225.00 | 230.00 | 230.00 |
| 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,400.00 | 1,400.00 | 6,000.00 | 6,000.00 |
| 0016 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 36,926 | INLF | 0.10 | 3,692.60 | 0.10 | 3,692.60 |
| 0017 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 12,640 | INLF | 1.40 | 17,696.00 | 0.10 | 1,264.00 |
| CONTRACTOR TOTAL | 946,615.30 | 1,027,925.13 | ||||||