Bid Tabulations
Letting of
02/23/2011
LA DOTD Headquarters
| Lead Project: 742-37-0030 | |
| Parish: Ouachita | |
| Routes: | |
| Description: GARRETT ROAD @ LA 594 TURN LANES | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $396,698.40 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 48462 | Fessler And Bowman, Inc. | $355,923.39 |
| 2 | 49239 | W L Bass Construction Inc. | $368,760.30 |
| 3 | 15099 | Amethyst Construction, Inc. | $428,710.60 |
| 4 | 44289 | Jeff Mercer LLC | $459,775.36 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Fessler And Bowman, Inc. |
- 2 - W L Bass Construction Inc. |
- 3 - Amethyst Construction, Inc. |
- 4 - Jeff Mercer LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,152.49 | 7,152.49 | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 7,500.00 | 7,500.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,451.47 | 8,451.47 | 250.00 | 250.00 | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 53.5 | LNFT | 6.48 | 346.68 | 22.00 | 1,177.00 | 6.00 | 321.00 | 15.00 | 802.50 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 191 | SQYD | 6.98 | 1,333.18 | 10.00 | 1,910.00 | 5.00 | 955.00 | 10.00 | 1,910.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,283 | SQYD | 15.19 | 19,488.77 | 6.00 | 7,698.00 | 6.00 | 7,698.00 | 4.00 | 5,132.00 |
| 0006 | 202-03-38000 | Relocation of Sign Various Locations | 3 | EACH | 72.14 | 216.42 | 250.00 | 750.00 | 25.00 | 75.00 | 10,000.00 | 30,000.00 |
| 0007 | 202-03-38020 | Relocation of Sign Pole Various Locations | 2 | EACH | 72.14 | 144.28 | 100.00 | 200.00 | 35.00 | 70.00 | 8,000.00 | 16,000.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 7,938.27 | 7,938.27 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 96 | EACH | 14.43 | 1,385.28 | 5.00 | 480.00 | 10.00 | 960.00 | 5.00 | 480.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 194.21 | 388.42 | 125.00 | 250.00 | 100.00 | 200.00 | 75.00 | 150.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 713 | LNFT | 2.77 | 1,975.01 | 0.50 | 356.50 | 1.50 | 1,069.50 | 1.00 | 713.00 |
| 0012 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 3,133.2 | SQYD | 17.26 | 54,079.03 | 15.00 | 46,998.00 | 15.00 | 46,998.00 | 30.00 | 93,996.00 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 12 | TON | 1,077.62 | 12,931.44 | 175.00 | 2,100.00 | 750.00 | 9,000.00 | 210.00 | 2,520.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 87.00 | 4,350.00 | 35.00 | 1,750.00 | 65.00 | 3,250.00 | 45.00 | 2,250.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 483.1 | TON | 162.03 | 78,276.69 | 175.00 | 84,542.50 | 275.00 | 132,852.50 | 120.00 | 57,972.00 |
| 0016 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 202 | LNFT | 63.24 | 12,774.48 | 45.00 | 9,090.00 | 70.00 | 14,140.00 | 60.00 | 12,120.00 |
| 0017 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 250 | LNFT | 74.91 | 18,727.50 | 50.00 | 12,500.00 | 72.00 | 18,000.00 | 70.00 | 17,500.00 |
| 0018 | 701-04-02020 | Storm Drain Pipe Arch (Outfall) (18" Equiv. CMPA) | 76 | LNFT | 83.42 | 6,339.92 | 50.00 | 3,800.00 | 74.00 | 5,624.00 | 70.00 | 5,320.00 |
| 0019 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 3 | LNFT | 303.98 | 911.94 | 250.00 | 750.00 | 74.00 | 222.00 | 500.00 | 1,500.00 |
| 0020 | 702-02-00200 | Manholes (R-CB-11) | 8 | EACH | 2,453.90 | 19,631.20 | 3,300.00 | 26,400.00 | 4,000.00 | 32,000.00 | 4,000.00 | 32,000.00 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 2,213.04 | 17,704.32 | 3,000.00 | 24,000.00 | 4,000.00 | 32,000.00 | 2,600.00 | 20,800.00 |
| 0022 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 2,503.81 | 5,007.62 | 6,000.00 | 12,000.00 | 4,400.00 | 8,800.00 | 5,800.00 | 11,600.00 |
| 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 97.7 | SQYD | 55.88 | 5,459.48 | 75.00 | 7,327.50 | 78.00 | 7,620.60 | 58.00 | 5,666.60 |
| 0024 | 707-03-00100 | Combination Concrete Curb and Gutter | 739 | LNFT | 25.68 | 18,977.52 | 25.00 | 18,475.00 | 32.00 | 23,648.00 | 25.00 | 18,475.00 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,165.78 | 10,165.78 | 5,700.00 | 5,700.00 | 12,000.00 | 12,000.00 | 18,000.00 | 18,000.00 |
| 0026 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,000 | LNFT | 0.33 | 330.00 | 1.00 | 1,000.00 | 1.00 | 1,000.00 | 0.18 | 180.00 |
| 0027 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 3,329.41 | 998.82 | 2,000.00 | 600.00 | 2,000.00 | 600.00 | 1,100.00 | 330.00 |
| 0028 | 717-01-00100 | Seeding | 10 | LB | 33.29 | 332.90 | 20.00 | 200.00 | 12.00 | 120.00 | 5.00 | 50.00 |
| 0029 | 718-01-00100 | Fertilizer | 150 | LB | 4.44 | 666.00 | 5.00 | 750.00 | 1.00 | 150.00 | 3.00 | 450.00 |
| 0030 | 726-01-00100 | Bedding Material | 60.6 | CUYD | 76.02 | 4,606.81 | 91.00 | 5,514.60 | 55.00 | 3,333.00 | 90.00 | 5,454.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 15,547.13 | 15,547.13 | 40,000.00 | 40,000.00 | 14,000.00 | 14,000.00 | 28,000.00 | 28,000.00 |
| 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 26 | EACH | 5.55 | 144.30 | 13.00 | 338.00 | 5.00 | 130.00 | 5.50 | 143.00 |
| 0033 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 107 | LNFT | 1.11 | 118.77 | 5.00 | 535.00 | 1.00 | 107.00 | 1.36 | 145.52 |
| 0034 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 34 | LNFT | 6.66 | 226.44 | 11.00 | 374.00 | 6.00 | 204.00 | 2.93 | 99.62 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.266 | MILE | 4,439.21 | 1,180.83 | 7,700.00 | 2,048.20 | 4,000.00 | 1,064.00 | 0.45 | 0.12 |
| 0036 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 194.21 | 194.21 | 610.00 | 610.00 | 175.00 | 175.00 | 200.00 | 200.00 |
| 0037 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 194.21 | 194.21 | 610.00 | 610.00 | 200.00 | 200.00 | 196.00 | 196.00 |
| 0038 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 216.41 | 432.82 | 610.00 | 1,220.00 | 200.00 | 400.00 | 214.00 | 428.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,811.88 | 5,811.88 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0040 | 741-10-00100 | Adjusting Water Service Lines | 150 | LNFT | 23.47 | 3,520.50 | 25.00 | 3,750.00 | 24.00 | 3,600.00 | 25.00 | 3,750.00 |
| 0041 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 150 | LNFT | 24.27 | 3,640.50 | 35.00 | 5,250.00 | 20.00 | 3,000.00 | 35.00 | 5,250.00 |
| 0042 | NS-200-00020 | Cleaning Existing Ditches | 62 | LNFT | 30.91 | 1,916.42 | 10.00 | 620.00 | 24.00 | 1,488.00 | 10.00 | 620.00 |
| 0043 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,036 | INLF | 1.24 | 1,284.64 | 1.00 | 1,036.00 | 1.00 | 1,036.00 | 2.00 | 2,072.00 |
| 0044 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain | 2 | EACH | 309.51 | 619.02 | 400.00 | 800.00 | 1,800.00 | 3,600.00 | 5,000.00 | 10,000.00 |
| CONTRACTOR TOTAL | 355,923.39 | 368,760.30 | 428,710.60 | 459,775.36 | ||||||||