Bid Tabulations
Letting of
02/24/2010
LA DOTD Headquarters
| Lead Project: 742-37-0022 | |
| Parish: Ouachita | |
| Routes: | |
| Description: DELLWOOD DRIVE | |
| Type Const: GRADING, CLASS II BASE COURSE, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, DRAINAGE STRUCTURES AND RELATED WORK. | |
| Estimated Construction Cost: $565,345.65 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $453,226.75 |
| 2 | 05789 | D & J Construction Co., Inc. | $497,459.06 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $587,722.93 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - D & J Construction Co., Inc. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 387 | SQYD | 12.00 | 4,644.00 | 10.00 | 3,870.00 | 10.00 | 3,870.00 |
| 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24 inch RCP | 77 | LNFT | 12.00 | 924.00 | 10.00 | 770.00 | 30.00 | 2,310.00 |
| 0005 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 3,178 | CUYD | 20.00 | 63,560.00 | 11.00 | 34,958.00 | 25.00 | 79,450.00 |
| 0006 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 8,724 | SQYD | 12.20 | 106,432.80 | 10.00 | 87,240.00 | 13.00 | 113,412.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 80 | CUYD | 95.00 | 7,600.00 | 50.00 | 4,000.00 | 120.00 | 9,600.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 1,848.2 | TON | 82.00 | 151,552.40 | 106.00 | 195,909.20 | 100.00 | 184,820.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 75.4 | TON | 190.00 | 14,326.00 | 225.00 | 16,965.00 | 240.00 | 18,096.00 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,109 | SQYD | 3.50 | 24,881.50 | 3.00 | 21,327.00 | 3.00 | 21,327.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -296.2 | CUYD | 0.10 | -29.62 | 0.10 | -29.62 | 2.00 | -592.40 |
| 0012 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 80 | LNFT | 120.00 | 9,600.00 | 110.00 | 8,800.00 | 150.00 | 12,000.00 |
| 0013 | 706-02-00200 | Concrete Drive (6" Thick) | 218.3 | SQYD | 82.00 | 17,900.60 | 75.00 | 16,372.50 | 70.00 | 15,281.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,500.00 | 7,500.00 | 43,000.00 | 43,000.00 | 50,000.00 | 50,000.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.551 | MILE | 170.00 | 93.67 | 225.00 | 123.98 | 275.00 | 151.53 |
| 0016 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,000.00 | 3,000.00 | 600.00 | 600.00 | 600.00 | 600.00 |
| 0017 | 717-01-00100 | Seeding | 22 | LB | 23.00 | 506.00 | 15.00 | 330.00 | 12.00 | 264.00 |
| 0018 | 718-01-00100 | Fertilizer | 440 | LB | 4.00 | 1,760.00 | 2.00 | 880.00 | 1.20 | 528.00 |
| 0019 | 726-01-00100 | Bedding Material | 17.6 | CUYD | 100.00 | 1,760.00 | 100.00 | 1,760.00 | 120.00 | 2,112.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 20,750.00 | 20,750.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 |
| 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 74 | EACH | 12.00 | 888.00 | 12.00 | 888.00 | 6.00 | 444.00 |
| 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.204 | MILE | 3,600.00 | 7,934.40 | 2,500.00 | 5,510.00 | 3,000.00 | 6,612.00 |
| 0023 | 735-01-00100 | Mailboxes | 23 | EACH | 1.00 | 23.00 | 5.00 | 115.00 | 10.00 | 230.00 |
| 0024 | 735-02-00100 | Mailbox Supports (Single) | 23 | EACH | 150.00 | 3,450.00 | 125.00 | 2,875.00 | 150.00 | 3,450.00 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 13,000.00 | 13,000.00 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 346 | INLF | 4.00 | 1,384.00 | 5.00 | 1,730.00 | 0.60 | 207.60 |
| 0027 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 393 | INLF | 2.00 | 786.00 | 5.00 | 1,965.00 | 1.40 | 550.20 |
| CONTRACTOR TOTAL | 453,226.75 | 497,459.06 | 587,722.93 | |||||||