Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 742-36-0143 | |
| Parish: Orleans | |
| Routes: | |
| Description: Tchoupitoulas St: Calliope St - Canal St | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $1,074,332.08 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $1,088,143.75 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,142,777.00 |
| 3 | 49954 | Plus Concrete Inc. | $1,295,960.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Boh Bros. Construction Co., LLC. |
- 2 - Barriere Construction Co., LLC |
- 3 - Plus Concrete Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 5 | EACH | 1,000.00 | 5,000.00 | 750.00 | 3,750.00 | 600.00 | 3,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 150 | SQYD | 35.00 | 5,250.00 | 15.00 | 2,250.00 | 18.00 | 2,700.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 240 | LNFT | 20.00 | 4,800.00 | 15.00 | 3,600.00 | 15.00 | 3,600.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 1,975.5 | TON | 130.00 | 256,815.00 | 136.00 | 268,668.00 | 150.00 | 296,325.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 291.5 | TON | 130.00 | 37,895.00 | 174.00 | 50,721.00 | 175.00 | 51,012.50 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 19,741 | SQYD | 4.00 | 78,964.00 | 7.00 | 138,187.00 | 5.00 | 98,705.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -817 | CUYD | 10.00 | -8,170.00 | 10.00 | -8,170.00 | 1.00 | -817.00 |
| 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 682 | SQYD | 125.00 | 85,250.00 | 150.00 | 102,300.00 | 250.00 | 170,500.00 |
| 0009 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 150 | SQYD | 100.00 | 15,000.00 | 110.00 | 16,500.00 | 150.00 | 22,500.00 |
| 0010 | 701-14-00100 | Cleaning Existing Pipes | 4,194 | LNFT | 6.00 | 25,164.00 | 10.00 | 41,940.00 | 15.00 | 62,910.00 |
| 0011 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 25 | EACH | 2,000.00 | 50,000.00 | 2,500.00 | 62,500.00 | 4,000.00 | 100,000.00 |
| 0012 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 10 | EACH | 1,500.00 | 15,000.00 | 2,570.00 | 25,700.00 | 2,500.00 | 25,000.00 |
| 0013 | 702-03-00700 | Catch Basins (CB-08) | 5 | EACH | 10,000.00 | 50,000.00 | 6,500.00 | 32,500.00 | 5,400.00 | 27,000.00 |
| 0014 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 1,700.00 | 3,400.00 | 2,000.00 | 4,000.00 | 1,500.00 | 3,000.00 |
| 0015 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 8 | EACH | 500.00 | 4,000.00 | 500.00 | 4,000.00 | 450.00 | 3,600.00 |
| 0016 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 1,000.00 | 5,000.00 | 2,100.00 | 10,500.00 | 1,200.00 | 6,000.00 |
| 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 225 | SQYD | 65.00 | 14,625.00 | 80.00 | 18,000.00 | 75.00 | 16,875.00 |
| 0018 | 706-04-00100 | Handicapped Curb Ramps | 22 | EACH | 3,500.00 | 77,000.00 | 3,500.00 | 77,000.00 | 2,000.00 | 44,000.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 185,000.00 | 185,000.00 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 |
| 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,750 | LNFT | 0.35 | 962.50 | 0.22 | 605.00 | 0.75 | 2,062.50 |
| 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 400 | LNFT | 1.00 | 400.00 | 0.75 | 300.00 | 1.20 | 480.00 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.855 | MILE | 450.00 | 384.75 | 800.00 | 684.00 | 800.00 | 684.00 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.71 | MILE | 800.00 | 1,368.00 | 450.00 | 769.50 | 800.00 | 1,368.00 |
| 0024 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 60.00 | 120.00 | 15.00 | 30.00 | 50.00 | 100.00 |
| 0025 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 60.00 | 120.00 | 15.00 | 30.00 | 50.00 | 100.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 110 | EACH | 6.00 | 660.00 | 12.00 | 1,320.00 | 4.50 | 495.00 |
| 0028 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 1,560 | LNFT | 1.00 | 1,560.00 | 1.25 | 1,950.00 | 1.25 | 1,950.00 |
| 0029 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,750 | LNFT | 1.50 | 4,125.00 | 1.35 | 3,712.50 | 1.65 | 4,537.50 |
| 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 400 | LNFT | 5.50 | 2,200.00 | 5.00 | 2,000.00 | 5.00 | 2,000.00 |
| 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.71 | MILE | 3,500.00 | 5,985.00 | 3,000.00 | 5,130.00 | 3,300.00 | 5,643.00 |
| 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.855 | MILE | 1,100.00 | 940.50 | 1,000.00 | 855.00 | 1,000.00 | 855.00 |
| 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 200.00 | 200.00 | 250.00 | 250.00 | 200.00 | 200.00 |
| 0034 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 200.00 | 200.00 | 250.00 | 250.00 | 200.00 | 200.00 |
| 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 225.00 | 450.00 | 250.00 | 500.00 | 250.00 | 500.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 |
| 0037 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,725 | INLF | 3.00 | 14,175.00 | 1.60 | 7,560.00 | 1.00 | 4,725.00 |
| 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 900 | INLF | 2.00 | 1,800.00 | 0.90 | 810.00 | 1.50 | 1,350.00 |
| 0039 | NS-ENH-16000 | Pavers (Brick) (Resetting Cobblestone Pavers) | 15 | SQFT | 100.00 | 1,500.00 | 225.00 | 3,375.00 | 300.00 | 4,500.00 |
| 0040 | NS-P36-00069 | Tree Protection | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 |
| 0041 | NS-P36-00073 | Concrete Curb (Barrier) (Doweled) | 120 | LNFT | 20.00 | 2,400.00 | 30.00 | 3,600.00 | 45.00 | 5,400.00 |
| 0042 | NS-P36-00075 | Concrete Curb Barrier (Drilled and Doweled) | 120 | LNFT | 35.00 | 4,200.00 | 55.00 | 6,600.00 | 45.00 | 5,400.00 |
| 0043 | NS-P36-00077 | Reset Existing Curb (Stone) | 60 | LNFT | 140.00 | 8,400.00 | 225.00 | 13,500.00 | 250.00 | 15,000.00 |
| CONTRACTOR TOTAL | 1,088,143.75 | 1,142,777.00 | 1,295,960.50 | |||||||