Bid Tabulations
Letting of
07/28/2010
LA DOTD Headquarters
| Lead Project: 742-26-0066 | |
| Parish: Jefferson | |
| Routes: | |
| Description: Segnette Boulevard Overlay (LAPALCO BLVD. TO US HWY 90B) | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $3,045,989.43 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $2,946,868.91 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $3,083,277.10 |
| 3 | 43371 | RMD Holdings Ltd | $3,101,673.15 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
- 3 - RMD Holdings Ltd |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 | 11,845.00 | 11,845.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 5,922.50 | 5,922.50 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 96.7 | SQYD | 13.00 | 1,257.10 | 23.00 | 2,224.10 | 9.29 | 898.54 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 2,796.1 | SQYD | 10.00 | 27,961.00 | 7.00 | 19,572.70 | 9.29 | 25,981.36 |
| 0005 | 202-02-06000 | Removal of Concrete Approach Slabs | 410 | SQYD | 27.00 | 11,070.00 | 20.00 | 8,200.00 | 9.80 | 4,017.18 |
| 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 8,022.14 | LNFT | 8.00 | 64,177.12 | 5.00 | 40,110.70 | 5.69 | 45,666.03 |
| 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 379 | SQYD | 30.00 | 11,370.00 | 12.00 | 4,548.00 | 3.88 | 1,468.81 |
| 0008 | 202-02-14500 | Removal of Guard Rail | 400 | LNFT | 7.80 | 3,120.00 | 7.00 | 2,800.00 | 2.21 | 883.20 |
| 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) (30" C.M.P.)(Outfall) | 80 | LNFT | 5.60 | 448.00 | 40.00 | 3,200.00 | 9.13 | 730.48 |
| 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) (48" C.M.P.)(Outfall) | 160 | LNFT | 8.20 | 1,312.00 | 50.00 | 8,000.00 | 9.13 | 1,460.96 |
| 0011 | 203-01-00100 | General Excavation | 1,843.8 | CUYD | 21.00 | 38,719.80 | 14.00 | 25,813.20 | 9.86 | 18,171.57 |
| 0012 | 203-03-00100 | Embankment | 4,297.08 | CUYD | 21.00 | 90,238.68 | 24.00 | 103,129.92 | 19.57 | 84,106.75 |
| 0013 | 203-08-00100 | Geotextile Fabric | 4,231 | SQYD | 1.40 | 5,923.40 | 1.50 | 6,346.50 | 2.39 | 10,120.55 |
| 0014 | 204-02-00100 | Temporary Hay or Straw Bales | 150 | EACH | 15.00 | 2,250.00 | 16.50 | 2,475.00 | 16.58 | 2,487.45 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 800 | LNFT | 2.00 | 1,600.00 | 1.75 | 1,400.00 | 2.59 | 2,070.00 |
| 0016 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 2,760 | SQYD | 16.00 | 44,160.00 | 15.00 | 41,400.00 | 20.18 | 55,703.70 |
| 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 400 | CUYD | 10.00 | 4,000.00 | 57.00 | 22,800.00 | 20.18 | 8,073.00 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 5,958.6 | TON | 85.00 | 506,481.00 | 100.00 | 595,860.00 | 118.00 | 703,114.80 |
| 0019 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,241 | TON | 130.00 | 161,330.00 | 100.00 | 124,100.00 | 125.00 | 155,125.00 |
| 0020 | 509-01-00100 | Cold Planing Asphaltic Pavement | 21,187 | SQYD | 2.00 | 42,374.00 | 4.00 | 84,748.00 | 6.00 | 127,122.00 |
| 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,250 | SQYD | 65.00 | 211,250.00 | 100.00 | 325,000.00 | 87.96 | 285,881.38 |
| 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 228 | LNFT | 57.00 | 12,996.00 | 130.00 | 29,640.00 | 35.26 | 8,039.05 |
| 0023 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) (30" CMP Only) | 80 | LNFT | 125.00 | 10,000.00 | 190.00 | 15,200.00 | 52.91 | 4,232.92 |
| 0024 | 701-03-02100 | Storm Drain Pipe (Outfall) (42" PP or 48" CMP) (48" CMP Only) | 160 | LNFT | 180.00 | 28,800.00 | 240.00 | 38,400.00 | 103.99 | 16,639.12 |
| 0025 | 701-14-00100 | Cleaning Existing Pipes | 5,503 | LNFT | 11.00 | 60,533.00 | 7.00 | 38,521.00 | 3.45 | 18,985.35 |
| 0026 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 550.00 | 3,300.00 | 700.00 | 4,200.00 | 500.25 | 3,001.50 |
| 0027 | 702-04-00200 | Adjusting Catch Basins | 42 | EACH | 750.00 | 31,500.00 | 700.00 | 29,400.00 | 500.25 | 21,010.50 |
| 0028 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 25.00 | 2,500.00 | 22.00 | 2,200.00 | 13.80 | 1,380.00 |
| 0029 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 20 | LNFT | 73.00 | 1,460.00 | 66.00 | 1,320.00 | 28.75 | 575.00 |
| 0030 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 73.00 | 14,600.00 | 66.00 | 13,200.00 | 66.13 | 13,225.00 |
| 0031 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 3,000.00 | 24,000.00 | 2,400.00 | 19,200.00 | 2,300.00 | 18,400.00 |
| 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 40.11 | SQYD | 91.00 | 3,650.01 | 103.00 | 4,131.33 | 34.28 | 1,375.03 |
| 0033 | 706-02-00300 | Concrete Drive (8" Thick) | 379 | SQYD | 91.00 | 34,489.00 | 72.00 | 27,288.00 | 53.73 | 20,362.91 |
| 0034 | 707-01-00100 | Concrete Curb (Doweled Barrier Extension) | 6,289.8 | LNFT | 19.00 | 119,506.20 | 16.50 | 103,781.70 | 12.65 | 79,565.97 |
| 0035 | 707-03-00100 | Combination Concrete Curb and Gutter (4" High Mountable Type) | 910.5 | LNFT | 33.00 | 30,046.50 | 31.00 | 28,225.50 | 20.70 | 18,847.35 |
| 0036 | 707-03-00100 | Combination Concrete Curb and Gutter (8" High Mountable Type) | 7,111.7 | LNFT | 24.00 | 170,680.80 | 22.00 | 156,457.40 | 20.70 | 147,212.19 |
| 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 161,000.00 | 161,000.00 | 162,586.00 | 162,586.00 |
| 0038 | 713-03-02020 | Temporary Pavement Markings (Broken Line) (4" W) (10' L) (Type 1 Removable) | 0.613 | MILE | 3,100.00 | 1,900.30 | 2,400.00 | 1,471.20 | 2,875.00 | 1,762.38 |
| 0039 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.628 | MILE | 9,500.00 | 5,966.00 | 6,700.00 | 4,207.60 | 10,062.50 | 6,319.25 |
| 0040 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 100 | EACH | 1,200.00 | 120,000.00 | 770.00 | 77,000.00 | 1,343.56 | 134,355.70 |
| 0041 | 715-01-00100 | Topsoil | 1,200 | CUYD | 35.00 | 42,000.00 | 33.00 | 39,600.00 | 19.57 | 23,487.60 |
| 0042 | 717-01-00100 | Seeding | 128 | LB | 32.00 | 4,096.00 | 5.00 | 640.00 | 28.75 | 3,680.00 |
| 0043 | 718-01-00100 | Fertilizer | 6,792 | LB | 1.15 | 7,810.80 | 1.00 | 6,792.00 | 1.15 | 7,810.80 |
| 0044 | 719-01-01320 | Plants (Tree) (Balled and Burlapped) (Relocate) (Cypress) | 14 | EACH | 1,900.00 | 26,600.00 | 300.00 | 4,200.00 | 107.81 | 1,509.38 |
| 0045 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,200.00 | 2,200.00 | 10,000.00 | 10,000.00 | 11,500.00 | 11,500.00 |
| 0046 | 723-01-00100 | Granular Material (Net Section) | 2,981.7 | CUYD | 20.00 | 59,634.00 | 20.00 | 59,634.00 | 19.57 | 58,360.81 |
| 0047 | 726-01-00100 | Bedding Material | 162 | CUYD | 50.00 | 8,100.00 | 80.00 | 12,960.00 | 99.06 | 16,048.45 |
| 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 280,000.00 | 280,000.00 | 297,000.00 | 297,000.00 | 376,429.00 | 376,429.00 |
| 0049 | 730-15-01000 | Relocate Light Poles (27' Aluminum Single Arm (Including Footing and Timber Pile)) | 5 | EACH | 5,500.00 | 27,500.00 | 7,100.00 | 35,500.00 | 7,475.00 | 37,375.00 |
| 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 323 | EACH | 6.00 | 1,938.00 | 5.50 | 1,776.50 | 6.04 | 1,950.11 |
| 0051 | 732-01-02020 | Plastic Pavement Striping (6" Width) (Thermoplastic 125 mil) | 140 | LNFT | 1.00 | 140.00 | 2.00 | 280.00 | 0.92 | 128.80 |
| 0052 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 5.50 | 132.00 | 5.00 | 120.00 | 5.18 | 124.20 |
| 0053 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.8 | MILE | 2,900.00 | 11,020.00 | 2,500.00 | 9,500.00 | 2,760.00 | 10,488.00 |
| 0054 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.1 | MILE | 7,900.00 | 790.00 | 5,600.00 | 560.00 | 9,775.00 | 977.50 |
| 0055 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.6 | MILE | 1,100.00 | 1,760.00 | 950.00 | 1,520.00 | 977.50 | 1,564.00 |
| 0056 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 325.00 | 650.00 | 175.00 | 350.00 | 304.75 | 609.50 |
| 0057 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 325.00 | 1,300.00 | 160.00 | 640.00 | 247.25 | 989.00 |
| 0058 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 325.00 | 650.00 | 160.00 | 320.00 | 247.25 | 494.50 |
| 0059 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 300.00 | 1,800.00 | 170.00 | 1,020.00 | 258.75 | 1,552.50 |
| 0060 | 732-05-00100 | Removal of Existing Markings | 1.51 | MILE | 4,500.00 | 6,795.00 | 2,000.00 | 3,020.00 | 4,312.50 | 6,511.88 |
| 0061 | 736-09-00100 | Loop Detector | 824 | LNFT | 15.00 | 12,360.00 | 18.00 | 14,832.00 | 18.40 | 15,161.60 |
| 0062 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | 17,250.00 | 17,250.00 |
| 0063 | 813-01-00100 | Concrete Approach Slabs | 410.15 | SQYD | 280.00 | 114,842.00 | 275.00 | 112,791.25 | 78.22 | 32,083.16 |
| 0064 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 24,260 | SQYD | 9.00 | 218,340.00 | 7.00 | 169,820.00 | 8.04 | 195,014.01 |
| 0065 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,152 | INLF | 0.85 | 979.20 | 1.00 | 1,152.00 | 1.04 | 1,192.32 |
| 0066 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,062 | INLF | 1.00 | 1,062.00 | 1.25 | 1,327.50 | 1.44 | 1,526.63 |
| 0067 | NS-P26-04000 | Jefferson Parish Type 2 Catch Basins | 4 | EACH | 3,000.00 | 12,000.00 | 4,900.00 | 19,600.00 | 1,291.11 | 5,164.42 |
| 0068 | NS-P26-04010 | Cleaning Existing Drain Inlets and Catch Basins | 39 | EACH | 100.00 | 3,900.00 | 250.00 | 9,750.00 | 770.50 | 30,049.50 |
| 0069 | NS-P26-04020 | Cleaning and Sealing Random Cracks in Asphaltic Concrete Pavement | 2,500 | LF | 4.00 | 10,000.00 | 4.00 | 10,000.00 | 3.91 | 9,775.00 |
| 0070 | NS-P26-04030 | Bulkhead and Canal Discharge Pipe Repairs | 1 | LUMP | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 4,140.00 | 4,140.00 |
| CONTRACTOR TOTAL | 2,946,868.91 | 3,083,277.10 | 3,101,673.15 | |||||||