Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 742-26-0053 | |
| Parish: Jefferson | |
| Routes: | |
| Description: Lapalco Overlay (Phase 3) (Bayou Fatma to Manhattan Blvd) | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK | |
| Estimated Construction Cost: $1,250,589.24 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,209,673.88 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,361,988.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,850.00 | 1,850.00 | 1,000.00 | 1,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 965 | LNFT | 10.00 | 9,650.00 | 20.00 | 19,300.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 475.88 | SQYD | 20.00 | 9,517.60 | 20.00 | 9,517.60 |
| 0004 | 203-03-00100 | Embankment | 25 | CUYD | 160.00 | 4,000.00 | 30.00 | 750.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 60 | EACH | 3.00 | 180.00 | 15.00 | 900.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 2,500 | LNFT | 1.00 | 2,500.00 | 2.00 | 5,000.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 10.00 | 500.00 | 20.00 | 1,000.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,973.57 | TON | 85.00 | 252,753.45 | 100.00 | 297,357.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,038.18 | TON | 136.00 | 141,192.48 | 100.00 | 103,818.00 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 13,959 | SQYD | 3.50 | 48,856.50 | 6.00 | 83,754.00 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,344.56 | SQYD | 95.00 | 127,733.20 | 130.00 | 174,792.80 |
| 0012 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 100 | LNFT | 148.00 | 14,800.00 | 150.00 | 15,000.00 |
| 0013 | 701-14-00100 | Cleaning Existing Pipes | 3,253 | LNFT | 3.25 | 10,572.25 | 13.00 | 42,289.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 8,950.00 | 8,950.00 | 6,500.00 | 6,500.00 |
| 0015 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 8,950.00 | 8,950.00 | 7,500.00 | 7,500.00 |
| 0016 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,940.00 | 1,940.00 | 3,000.00 | 3,000.00 |
| 0017 | 702-04-00200 | Adjusting Catch Basins | 14 | EACH | 1,940.00 | 27,160.00 | 1,000.00 | 14,000.00 |
| 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 50.21 | SQYD | 87.00 | 4,368.27 | 60.00 | 3,012.60 |
| 0019 | 706-02-00300 | Concrete Drive (8" Thick) | 413.88 | SQYD | 76.00 | 31,454.88 | 80.00 | 33,110.40 |
| 0020 | 706-04-00100 | Handicapped Curb Ramps | 10 | EACH | 800.00 | 8,000.00 | 1,200.00 | 12,000.00 |
| 0021 | 707-01-00100 | Concrete Curb (Doweled Barrier Curb Extension) | 4,350 | LNFT | 30.00 | 130,500.00 | 15.40 | 66,990.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 957 | LNFT | 42.00 | 40,194.00 | 75.00 | 71,775.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 96,000.00 | 96,000.00 | 143,000.00 | 143,000.00 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.08 | MILE | 475.00 | 513.00 | 360.00 | 388.80 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.11 | MILE | 550.00 | 610.50 | 770.00 | 854.70 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 5 | EACH | 45.00 | 225.00 | 50.00 | 250.00 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 5 | EACH | 45.00 | 225.00 | 50.00 | 250.00 |
| 0028 | 717-01-00100 | Seeding | 55 | LB | 20.00 | 1,100.00 | 10.00 | 550.00 |
| 0029 | 718-01-00100 | Fertilizer | 55 | LB | 5.00 | 275.00 | 10.00 | 550.00 |
| 0030 | 726-01-00100 | Bedding Material | 25 | CUYD | 50.00 | 1,250.00 | 50.00 | 1,250.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 120,000.00 | 120,000.00 |
| 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 190 | EACH | 5.25 | 997.50 | 5.60 | 1,064.00 |
| 0033 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 714 | LNFT | 1.35 | 963.90 | 1.00 | 714.00 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 120 | LNFT | 4.50 | 540.00 | 4.00 | 480.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.55 | MILE | 2,500.00 | 1,375.00 | 3,000.00 | 1,650.00 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.54 | MILE | 850.00 | 459.00 | 800.00 | 432.00 |
| 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 215.00 | 3,010.00 | 200.00 | 2,800.00 |
| 0038 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 225.00 | 1,800.00 | 200.00 | 1,600.00 |
| 0039 | 736-09-00100 | Loop Detector | 130 | LNFT | 12.00 | 1,560.00 | 14.00 | 1,820.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0041 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 150.00 | 150.00 | 1,500.00 | 1,500.00 |
| 0042 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 10,813 | SQYD | 6.75 | 72,987.75 | 7.40 | 80,016.20 |
| 0043 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,496 | INLF | 0.10 | 849.60 | 0.80 | 6,796.80 |
| 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,328 | INLF | 1.25 | 1,660.00 | 2.00 | 2,656.00 |
| 0045 | NS-MSC-00120 | Drainage Structure (Manhole Top to Catchbasin Top) | 1 | EACH | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 |
| 0046 | NS-P26-04020 | Cleaning and Sealing Random Cracks in Asphaltic Concrete Pavement | 250 | LF | 10.00 | 2,500.00 | 20.00 | 5,000.00 |
| CONTRACTOR TOTAL | 1,209,673.88 | 1,361,988.90 | ||||||