Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 742-17-0165 | |
| Parish: East Baton Rouge | |
| Routes: | |
| Description: CENTRAL THRUWAY PAVING (FLA BVD TO S END OF SULLIVAN BRIDGE) | |
| Type Const: Grading, Drainage Structure, Class II Base Course, Superpave Asphaltic Concrete Pavement, Portland Cement Concrete Pavement, Traffic Signalization, and Related Work. | |
| Estimated Construction Cost: $5,324,197.12 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34567 | James Construction Group LLC | $3,684,788.12 |
| 2 | 29595 | Boone Services Inc. | $4,047,319.52 |
| 3 | 39462 | JB James Construction LLC | $4,247,894.18 |
| 4 | 24901 | Hard Rock Construction Co. | $4,311,418.61 |
| 5 | 42076 | Austin Bridge & Road, Lp | $4,357,500.00 |
| 6 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $4,363,568.60 |
| 7 | 14807 | Richard Price Contracting Co, Llc | $4,466,609.37 |
| 8 | 25088 | RCS Contractors, Inc. | $4,627,732.69 |
| 9 | 48896 | Command Construction Industries LLC | $4,774,122.96 |
| 10 | 12312 | Gilchrist Construction Co. LLC | $5,184,882.43 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - James Construction Group LLC |
- 2 - Boone Services Inc. |
- 3 - JB James Construction LLC |
- 4 - Hard Rock Construction Co. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 25,000.00 | 25,000.00 | 1,750.00 | 1,750.00 | 200,000.00 | 200,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 1,750.00 | 1,750.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 418.1 | LNFT | 3.00 | 1,254.30 | 3.97 | 1,659.86 | 3.00 | 1,254.30 | 10.00 | 4,181.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 451.4 | SQYD | 2.00 | 902.80 | 5.71 | 2,577.49 | 5.00 | 2,257.00 | 10.00 | 4,514.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,141 | SQYD | 5.00 | 35,705.00 | 7.36 | 52,557.76 | 7.00 | 49,987.00 | 10.00 | 71,410.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 822 | SQYD | 12.00 | 9,864.00 | 20.01 | 16,448.22 | 6.00 | 4,932.00 | 10.00 | 8,220.00 |
| 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,200.00 | 1,200.00 | 1,386.00 | 1,386.00 | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 |
| 0008 | 203-01-00100 | General Excavation | 10,252 | CUYD | 8.00 | 82,016.00 | 4.50 | 46,134.00 | 12.00 | 123,024.00 | 6.00 | 61,512.00 |
| 0009 | 203-03-00100 | Embankment | 4,135 | CUYD | 16.50 | 68,227.50 | 2.00 | 8,270.00 | 15.00 | 62,025.00 | 15.00 | 62,025.00 |
| 0010 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,285.8 | CUYD | 1.00 | 2,285.80 | 80.49 | 183,984.04 | 40.00 | 91,432.00 | 70.00 | 160,006.00 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 329 | EACH | 18.00 | 5,922.00 | 30.30 | 9,968.70 | 12.00 | 3,948.00 | 12.00 | 3,948.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 140.00 | 560.00 | 159.97 | 639.88 | 125.00 | 500.00 | 125.00 | 500.00 |
| 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 325.00 | 650.00 | 257.28 | 514.56 | 430.00 | 860.00 | 6,000.00 | 12,000.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 5,610 | LNFT | 1.50 | 8,415.00 | 1.94 | 10,883.40 | 1.50 | 8,415.00 | 1.50 | 8,415.00 |
| 0015 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 5,000.00 | 5,000.00 | 5,457.61 | 5,457.61 | 3,000.00 | 3,000.00 | 7,000.00 | 7,000.00 |
| 0016 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 21,519 | SQYD | 10.00 | 215,190.00 | 11.44 | 246,177.36 | 10.50 | 225,949.50 | 10.00 | 215,190.00 |
| 0017 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) | 2,796.9 | SQYD | 18.00 | 50,344.20 | 14.50 | 40,555.05 | 10.75 | 30,066.68 | 13.00 | 36,359.70 |
| 0018 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 25,132 | SQYD | 10.00 | 251,320.00 | 9.98 | 250,817.36 | 11.50 | 289,018.00 | 7.00 | 175,924.00 |
| 0019 | 304-05-00100 | Lime Treatment (Type E) | 255.15 | TON | 250.00 | 63,787.50 | 307.43 | 78,440.76 | 150.00 | 38,272.50 | 270.00 | 68,890.50 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 22.8 | CUYD | 95.00 | 2,166.00 | 87.85 | 2,002.98 | 100.00 | 2,280.00 | 100.00 | 2,280.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 55.00 | 55,000.00 | 76.52 | 76,520.00 | 70.00 | 70,000.00 | 30.00 | 30,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 882.9 | TON | 170.00 | 150,093.00 | 173.25 | 152,962.43 | 140.00 | 123,606.00 | 125.00 | 110,362.50 |
| 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 17,963 | SQYD | 50.00 | 898,150.00 | 57.19 | 1,027,303.97 | 53.00 | 952,039.00 | 75.00 | 1,347,225.00 |
| 0024 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 2,626.4 | SQYD | 50.00 | 131,320.00 | 62.19 | 163,335.82 | 59.00 | 154,957.60 | 76.00 | 199,606.40 |
| 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 10 | EACH | 100.00 | 1,000.00 | 150.00 | 1,500.00 | 100.00 | 1,000.00 | 100.00 | 1,000.00 |
| 0026 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 300 | LNFT | 185.00 | 55,500.00 | 212.76 | 63,828.00 | 190.00 | 57,000.00 | 190.00 | 57,000.00 |
| 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,428 | LNFT | 38.00 | 92,264.00 | 41.61 | 101,029.08 | 45.00 | 109,260.00 | 44.00 | 106,832.00 |
| 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 116 | LNFT | 53.00 | 6,148.00 | 41.96 | 4,867.36 | 47.00 | 5,452.00 | 46.00 | 5,336.00 |
| 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 240 | LNFT | 57.00 | 13,680.00 | 49.26 | 11,822.40 | 59.00 | 14,160.00 | 59.00 | 14,160.00 |
| 0030 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 446 | LNFT | 175.00 | 78,050.00 | 156.07 | 69,607.22 | 184.00 | 82,064.00 | 183.00 | 81,618.00 |
| 0031 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 134 | LNFT | 43.00 | 5,762.00 | 35.34 | 4,735.56 | 45.00 | 6,030.00 | 44.00 | 5,896.00 |
| 0032 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 30 | LNFT | 40.00 | 1,200.00 | 45.52 | 1,365.60 | 48.00 | 1,440.00 | 48.00 | 1,440.00 |
| 0033 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 28 | LNFT | 191.00 | 5,348.00 | 118.27 | 3,311.56 | 195.00 | 5,460.00 | 191.00 | 5,348.00 |
| 0034 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 120 | LNFT | 57.00 | 6,840.00 | 38.49 | 4,618.80 | 48.00 | 5,760.00 | 48.00 | 5,760.00 |
| 0035 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 3,515.00 | 7,030.00 | 2,871.84 | 5,743.68 | 1,200.00 | 2,400.00 | 1,176.00 | 2,352.00 |
| 0036 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 5,020.00 | 5,020.00 | 2,889.53 | 2,889.53 | 1,550.00 | 1,550.00 | 1,500.00 | 1,500.00 |
| 0037 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 1,810.00 | 9,050.00 | 2,818.50 | 14,092.50 | 1,130.00 | 5,650.00 | 1,100.00 | 5,500.00 |
| 0038 | 702-03-00500 | Catch Basins (CB-06) | 61 | EACH | 2,810.00 | 171,410.00 | 3,093.96 | 188,731.56 | 2,700.00 | 164,700.00 | 2,700.00 | 164,700.00 |
| 0039 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 3,065.00 | 3,065.00 | 3,777.09 | 3,777.09 | 3,700.00 | 3,700.00 | 2,700.00 | 2,700.00 |
| 0040 | 702-03-00700 | Catch Basins (CB-08) | 9 | EACH | 6,525.00 | 58,725.00 | 5,804.00 | 52,236.00 | 6,700.00 | 60,300.00 | 6,600.00 | 59,400.00 |
| 0041 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 1,005.00 | 2,010.00 | 1,696.95 | 3,393.90 | 1,380.00 | 2,760.00 | 1,400.00 | 2,800.00 |
| 0042 | 703-03-00100 | Perforated Pipe Underdrains | 3,153 | LNFT | 11.00 | 34,683.00 | 15.22 | 47,988.66 | 14.00 | 44,142.00 | 12.00 | 37,836.00 |
| 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 282 | LNFT | 25.00 | 7,050.00 | 28.88 | 8,144.16 | 32.00 | 9,024.00 | 20.00 | 5,640.00 |
| 0044 | 705-09-00100 | Rebuilt Fence | 421 | LNFT | 25.00 | 10,525.00 | 28.88 | 12,158.48 | 32.00 | 13,472.00 | 25.00 | 10,525.00 |
| 0045 | 706-01-00100 | Concrete Walk (4" Thick) | 148.7 | SQYD | 32.00 | 4,758.40 | 23.92 | 3,556.90 | 28.50 | 4,237.95 | 28.00 | 4,163.60 |
| 0046 | 706-02-00300 | Concrete Drive (8" Thick) | 625 | SQYD | 35.00 | 21,875.00 | 51.65 | 32,281.25 | 43.50 | 27,187.50 | 43.00 | 26,875.00 |
| 0047 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 305.4 | SQYD | 30.00 | 9,162.00 | 24.39 | 7,448.71 | 28.50 | 8,703.90 | 28.00 | 8,551.20 |
| 0048 | 707-01-00200 | Concrete Curb (Barrier) | 325.4 | LNFT | 15.00 | 4,881.00 | 8.52 | 2,772.41 | 9.00 | 2,928.60 | 6.00 | 1,952.40 |
| 0049 | 707-01-00300 | Concrete Curb (Mountable) | 5,358.7 | LNFT | 8.00 | 42,869.60 | 9.76 | 52,300.91 | 2.00 | 10,717.40 | 6.00 | 32,152.20 |
| 0050 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,194.8 | LNFT | 8.00 | 9,558.40 | 18.79 | 22,450.29 | 15.00 | 17,922.00 | 30.00 | 35,844.00 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 19,000.00 | 19,000.00 | 28,384.13 | 28,384.13 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 |
| 0052 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.00 | 24.00 | 1.16 | 27.84 | 1.00 | 24.00 | 1.00 | 24.00 |
| 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.024 | MILE | 550.00 | 1,663.20 | 635.25 | 1,921.00 | 550.00 | 1,663.20 | 550.00 | 1,663.20 |
| 0054 | 716-01-00100 | Mulch (Vegetative) | 3.27 | TON | 450.00 | 1,471.50 | 519.75 | 1,699.58 | 450.00 | 1,471.50 | 450.00 | 1,471.50 |
| 0055 | 717-01-00100 | Seeding | 100 | LB | 8.00 | 800.00 | 9.24 | 924.00 | 8.00 | 800.00 | 8.00 | 800.00 |
| 0056 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.25 | 500.00 | 0.29 | 580.00 | 0.25 | 500.00 | 0.25 | 500.00 |
| 0057 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 540 | SQYD | 0.85 | 459.00 | 2.42 | 1,306.80 | 0.85 | 459.00 | 1.00 | 540.00 |
| 0058 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 620 | SQYD | 2.00 | 1,240.00 | 2.54 | 1,574.80 | 3.00 | 1,860.00 | 1.00 | 620.00 |
| 0059 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 8,500.00 | 8,500.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 |
| 0060 | 725-01-00100 | Temporary Detour Roads | 2,113.8 | SQYD | 42.00 | 88,779.60 | 55.91 | 118,182.56 | 60.00 | 126,828.00 | 70.00 | 147,966.00 |
| 0061 | 726-01-00100 | Bedding Material | 894.5 | CUYD | 80.33 | 71,855.19 | 58.41 | 52,247.75 | 48.00 | 42,936.00 | 48.00 | 42,936.00 |
| 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 325,000.00 | 325,000.00 | 178,750.86 | 178,750.86 | 407,000.00 | 407,000.00 | 250,000.00 | 250,000.00 |
| 0063 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 590.00 | 1,180.00 | 1,328.25 | 2,656.50 | 650.00 | 1,300.00 | 650.00 | 1,300.00 |
| 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 402 | EACH | 4.75 | 1,909.50 | 5.49 | 2,206.98 | 5.00 | 2,010.00 | 5.00 | 2,010.00 |
| 0065 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,375 | LNFT | 0.90 | 1,237.50 | 1.04 | 1,430.00 | 1.00 | 1,375.00 | 1.00 | 1,375.00 |
| 0066 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 595 | LNFT | 1.40 | 833.00 | 1.62 | 963.90 | 1.40 | 833.00 | 1.00 | 595.00 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 362 | LNFT | 3.10 | 1,122.20 | 3.58 | 1,295.96 | 3.10 | 1,122.20 | 3.00 | 1,086.00 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.309 | MILE | 2,400.00 | 7,941.60 | 2,772.00 | 9,172.55 | 2,500.00 | 8,272.50 | 2,400.00 | 7,941.60 |
| 0069 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) (10' Length at 30' Intervals) | 1.327 | MILE | 527.00 | 699.33 | 621.15 | 824.27 | 550.00 | 729.85 | 530.00 | 703.31 |
| 0070 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.45 | MILE | 3,700.00 | 1,665.00 | 4,268.88 | 1,921.00 | 3,700.00 | 1,665.00 | 370.00 | 166.50 |
| 0071 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 175.00 | 2,800.00 | 202.13 | 3,234.08 | 175.00 | 2,800.00 | 175.00 | 2,800.00 |
| 0072 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 175.00 | 1,750.00 | 202.13 | 2,021.30 | 175.00 | 1,750.00 | 175.00 | 1,750.00 |
| 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 180.00 | 2,520.00 | 207.90 | 2,910.60 | 175.00 | 2,450.00 | 180.00 | 2,520.00 |
| 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 89,512.50 | 89,512.50 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 |
| 0075 | NS-P17-00001 | NS Traffic Signal System | 1 | LUMP | 370,000.00 | 370,000.00 | 429,821.70 | 429,821.70 | 374,000.00 | 374,000.00 | 375,000.00 | 375,000.00 |
| CONTRACTOR TOTAL | 3,684,788.12 | 4,047,319.52 | 4,247,894.18 | 4,311,418.61 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Austin Bridge & Road, Lp |
- 6 - F.G. Sullivan, Jr. Contractor LLC |
- 7 - Richard Price Contracting Co, Llc |
- 8 - RCS Contractors, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 315,500.00 | 315,500.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 | 85,000.00 | 85,000.00 | 15,000.00 | 15,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 418.1 | LNFT | 9.00 | 3,762.90 | 5.00 | 2,090.50 | 12.00 | 5,017.20 | 3.00 | 1,254.30 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 451.4 | SQYD | 13.00 | 5,868.20 | 5.00 | 2,257.00 | 10.00 | 4,514.00 | 5.00 | 2,257.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,141 | SQYD | 7.25 | 51,772.25 | 5.00 | 35,705.00 | 7.50 | 53,557.50 | 9.00 | 64,269.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 822 | SQYD | 8.00 | 6,576.00 | 5.00 | 4,110.00 | 6.00 | 4,932.00 | 7.00 | 5,754.00 |
| 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,300.00 | 1,300.00 | 1,200.00 | 1,200.00 | 1,383.01 | 1,383.01 | 3,000.00 | 3,000.00 |
| 0008 | 203-01-00100 | General Excavation | 10,252 | CUYD | 8.40 | 86,116.80 | 5.00 | 51,260.00 | 13.00 | 133,276.00 | 5.65 | 57,923.80 |
| 0009 | 203-03-00100 | Embankment | 4,135 | CUYD | 19.00 | 78,565.00 | 5.00 | 20,675.00 | 22.00 | 90,970.00 | 20.00 | 82,700.00 |
| 0010 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,285.8 | CUYD | 60.00 | 137,148.00 | 1.00 | 2,285.80 | 71.33 | 163,046.11 | 73.00 | 166,863.40 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 329 | EACH | 21.00 | 6,909.00 | 10.00 | 3,290.00 | 45.46 | 14,956.34 | 11.00 | 3,619.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 135.00 | 540.00 | 125.00 | 500.00 | 239.07 | 956.28 | 140.00 | 560.00 |
| 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 1,390.20 | 2,780.40 | 300.00 | 600.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 5,610 | LNFT | 1.20 | 6,732.00 | 1.35 | 7,573.50 | 1.88 | 10,546.80 | 1.60 | 8,976.00 |
| 0015 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 7,007.93 | 7,007.93 | 500.00 | 500.00 |
| 0016 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 21,519 | SQYD | 10.00 | 215,190.00 | 14.00 | 301,266.00 | 9.49 | 204,215.31 | 10.82 | 232,835.58 |
| 0017 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) | 2,796.9 | SQYD | 15.00 | 41,953.50 | 19.00 | 53,141.10 | 11.41 | 31,912.63 | 13.53 | 37,842.06 |
| 0018 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 25,132 | SQYD | 14.00 | 351,848.00 | 18.00 | 452,376.00 | 9.10 | 228,701.20 | 17.00 | 427,244.00 |
| 0019 | 304-05-00100 | Lime Treatment (Type E) | 255.15 | TON | 165.00 | 42,099.75 | 300.00 | 76,545.00 | 262.38 | 66,946.26 | 275.00 | 70,166.25 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 22.8 | CUYD | 200.00 | 4,560.00 | 100.00 | 2,280.00 | 108.70 | 2,478.36 | 100.00 | 2,280.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 50.00 | 50,000.00 | 30.00 | 30,000.00 | 55.77 | 55,770.00 | 46.00 | 46,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 882.9 | TON | 165.00 | 145,678.50 | 170.00 | 150,093.00 | 172.88 | 152,635.75 | 178.50 | 157,597.65 |
| 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 17,963 | SQYD | 48.00 | 862,224.00 | 74.00 | 1,329,262.00 | 58.27 | 1,046,704.01 | 62.53 | 1,123,226.39 |
| 0024 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 2,626.4 | SQYD | 52.00 | 136,572.80 | 74.00 | 194,353.60 | 58.29 | 153,092.86 | 75.00 | 196,980.00 |
| 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 10 | EACH | 100.00 | 1,000.00 | 100.00 | 1,000.00 | 230.50 | 2,305.00 | 100.00 | 1,000.00 |
| 0026 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 300 | LNFT | 220.00 | 66,000.00 | 200.00 | 60,000.00 | 218.51 | 65,553.00 | 191.78 | 57,534.00 |
| 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,428 | LNFT | 50.00 | 121,400.00 | 50.00 | 121,400.00 | 50.83 | 123,415.24 | 51.58 | 125,236.24 |
| 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 116 | LNFT | 53.00 | 6,148.00 | 60.00 | 6,960.00 | 53.25 | 6,177.00 | 56.25 | 6,525.00 |
| 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 240 | LNFT | 68.00 | 16,320.00 | 70.00 | 16,800.00 | 67.77 | 16,264.80 | 67.95 | 16,308.00 |
| 0030 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 446 | LNFT | 210.00 | 93,660.00 | 235.00 | 104,810.00 | 210.22 | 93,758.12 | 223.65 | 99,747.90 |
| 0031 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 134 | LNFT | 50.00 | 6,700.00 | 50.00 | 6,700.00 | 50.83 | 6,811.22 | 51.58 | 6,911.72 |
| 0032 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 30 | LNFT | 53.00 | 1,590.00 | 60.00 | 1,800.00 | 55.32 | 1,659.60 | 46.25 | 1,387.50 |
| 0033 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 28 | LNFT | 220.00 | 6,160.00 | 200.00 | 5,600.00 | 220.59 | 6,176.52 | 200.00 | 5,600.00 |
| 0034 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 120 | LNFT | 55.00 | 6,600.00 | 60.00 | 7,200.00 | 55.32 | 6,638.40 | 51.58 | 6,189.60 |
| 0035 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 1,400.00 | 2,800.00 | 2,700.00 | 5,400.00 | 1,355.34 | 2,710.68 | 2,550.00 | 5,100.00 |
| 0036 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 1,800.00 | 1,800.00 | 5,100.00 | 5,100.00 | 1,763.33 | 1,763.33 | 4,800.00 | 4,800.00 |
| 0037 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 1,300.00 | 6,500.00 | 2,500.00 | 12,500.00 | 1,272.36 | 6,361.80 | 2,250.00 | 11,250.00 |
| 0038 | 702-03-00500 | Catch Basins (CB-06) | 61 | EACH | 3,000.00 | 183,000.00 | 3,200.00 | 195,200.00 | 3,085.48 | 188,214.28 | 2,950.00 | 179,950.00 |
| 0039 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,383.40 | 4,383.40 | 3,500.00 | 3,500.00 | 4,248.59 | 4,248.59 | 3,150.00 | 3,150.00 |
| 0040 | 702-03-00700 | Catch Basins (CB-08) | 9 | EACH | 7,500.00 | 67,500.00 | 5,900.00 | 53,100.00 | 7,634.18 | 68,707.62 | 5,500.00 | 49,500.00 |
| 0041 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 1,600.00 | 3,200.00 | 1,600.00 | 3,200.00 | 1,590.46 | 3,180.92 | 1,450.00 | 2,900.00 |
| 0042 | 703-03-00100 | Perforated Pipe Underdrains | 3,153 | LNFT | 22.00 | 69,366.00 | 8.00 | 25,224.00 | 22.20 | 69,996.60 | 7.25 | 22,859.25 |
| 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 282 | LNFT | 30.00 | 8,460.00 | 25.00 | 7,050.00 | 25.00 | 7,050.00 | 6.00 | 1,692.00 |
| 0044 | 705-09-00100 | Rebuilt Fence | 421 | LNFT | 30.00 | 12,630.00 | 12.00 | 5,052.00 | 15.00 | 6,315.00 | 6.00 | 2,526.00 |
| 0045 | 706-01-00100 | Concrete Walk (4" Thick) | 148.7 | SQYD | 40.00 | 5,948.00 | 50.00 | 7,435.00 | 30.28 | 4,502.64 | 35.21 | 5,235.73 |
| 0046 | 706-02-00300 | Concrete Drive (8" Thick) | 625 | SQYD | 50.00 | 31,250.00 | 70.00 | 43,750.00 | 46.53 | 29,081.25 | 43.92 | 27,450.00 |
| 0047 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 305.4 | SQYD | 33.00 | 10,078.20 | 70.00 | 21,378.00 | 30.29 | 9,250.57 | 35.21 | 10,753.13 |
| 0048 | 707-01-00200 | Concrete Curb (Barrier) | 325.4 | LNFT | 4.00 | 1,301.60 | 11.00 | 3,579.40 | 4.81 | 1,565.17 | 15.00 | 4,881.00 |
| 0049 | 707-01-00300 | Concrete Curb (Mountable) | 5,358.7 | LNFT | 2.00 | 10,717.40 | 6.00 | 32,152.20 | 4.81 | 25,775.35 | 15.00 | 80,380.50 |
| 0050 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,194.8 | LNFT | 23.00 | 27,480.40 | 35.00 | 41,818.00 | 20.17 | 24,099.12 | 35.00 | 41,818.00 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 76,500.00 | 76,500.00 | 14,760.68 | 14,760.68 | 35,000.00 | 35,000.00 |
| 0052 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 2.00 | 48.00 | 0.75 | 18.00 | 0.86 | 20.64 | 1.10 | 26.40 |
| 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.024 | MILE | 600.00 | 1,814.40 | 450.00 | 1,360.80 | 517.94 | 1,566.25 | 605.00 | 1,829.52 |
| 0054 | 716-01-00100 | Mulch (Vegetative) | 3.27 | TON | 500.00 | 1,635.00 | 850.00 | 2,779.50 | 518.63 | 1,695.92 | 925.00 | 3,024.75 |
| 0055 | 717-01-00100 | Seeding | 100 | LB | 10.00 | 1,000.00 | 8.00 | 800.00 | 9.22 | 922.00 | 10.00 | 1,000.00 |
| 0056 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.50 | 1,000.00 | 0.40 | 800.00 | 0.29 | 580.00 | 0.50 | 1,000.00 |
| 0057 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 540 | SQYD | 1.00 | 540.00 | 1.20 | 648.00 | 0.98 | 529.20 | 1.30 | 702.00 |
| 0058 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 620 | SQYD | 1.25 | 775.00 | 1.60 | 992.00 | 1.84 | 1,140.80 | 1.75 | 1,085.00 |
| 0059 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 15,000.00 | 15,000.00 | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 |
| 0060 | 725-01-00100 | Temporary Detour Roads | 2,113.8 | SQYD | 51.00 | 107,803.80 | 60.00 | 126,828.00 | 90.00 | 190,242.00 | 75.00 | 158,535.00 |
| 0061 | 726-01-00100 | Bedding Material | 894.5 | CUYD | 51.00 | 45,619.50 | 25.00 | 22,362.50 | 55.32 | 49,483.74 | 35.00 | 31,307.50 |
| 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 375,000.00 | 375,000.00 | 80,000.00 | 80,000.00 | 310,000.00 | 310,000.00 | 341,074.90 | 341,074.90 |
| 0063 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 700.00 | 1,400.00 | 600.00 | 1,200.00 | 864.38 | 1,728.76 | 715.00 | 1,430.00 |
| 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 402 | EACH | 5.00 | 2,010.00 | 6.00 | 2,412.00 | 6.05 | 2,432.10 | 5.00 | 2,010.00 |
| 0065 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,375 | LNFT | 1.00 | 1,375.00 | 2.00 | 2,750.00 | 1.73 | 2,378.75 | 0.95 | 1,306.25 |
| 0066 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 595 | LNFT | 1.60 | 952.00 | 2.50 | 1,487.50 | 2.88 | 1,713.60 | 1.47 | 874.65 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 362 | LNFT | 4.00 | 1,448.00 | 5.00 | 1,810.00 | 5.19 | 1,878.78 | 3.25 | 1,176.50 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.309 | MILE | 2,600.00 | 8,603.40 | 2,700.00 | 8,934.30 | 2,882.13 | 9,536.97 | 2,500.00 | 8,272.50 |
| 0069 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) (10' Length at 30' Intervals) | 1.327 | MILE | 600.00 | 796.20 | 700.00 | 928.90 | 750.82 | 996.34 | 545.00 | 723.22 |
| 0070 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.45 | MILE | 4,000.00 | 1,800.00 | 3,300.00 | 1,485.00 | 3,457.51 | 1,555.88 | 3,890.00 | 1,750.50 |
| 0071 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 185.00 | 2,960.00 | 250.00 | 4,000.00 | 247.79 | 3,964.64 | 185.00 | 2,960.00 |
| 0072 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 185.00 | 1,850.00 | 250.00 | 2,500.00 | 247.79 | 2,477.90 | 185.00 | 1,850.00 |
| 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 190.00 | 2,660.00 | 250.00 | 3,500.00 | 259.31 | 3,630.34 | 190.00 | 2,660.00 |
| 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | 125,000.00 | 125,000.00 |
| 0075 | NS-P17-00001 | NS Traffic Signal System | 1 | LUMP | 400,000.00 | 400,000.00 | 370,000.00 | 370,000.00 | 428,892.31 | 428,892.31 | 400,000.00 | 400,000.00 |
| CONTRACTOR TOTAL | 4,357,500.00 | 4,363,568.60 | 4,466,609.37 | 4,627,732.69 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Command Construction Industries LLC |
- 10 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 150,000.00 | 150,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 418.1 | LNFT | 10.00 | 4,181.00 | 8.00 | 3,344.80 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 451.4 | SQYD | 5.00 | 2,257.00 | 12.00 | 5,416.80 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 7,141 | SQYD | 5.00 | 35,705.00 | 8.50 | 60,698.50 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 822 | SQYD | 5.00 | 4,110.00 | 9.00 | 7,398.00 |
| 0007 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 |
| 0008 | 203-01-00100 | General Excavation | 10,252 | CUYD | 5.00 | 51,260.00 | 4.00 | 41,008.00 |
| 0009 | 203-03-00100 | Embankment | 4,135 | CUYD | 5.00 | 20,675.00 | 20.00 | 82,700.00 |
| 0010 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,285.8 | CUYD | 60.00 | 137,148.00 | 100.00 | 228,580.00 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 329 | EACH | 10.00 | 3,290.00 | 16.00 | 5,264.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 250.00 | 1,000.00 | 320.00 | 1,280.00 |
| 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 300.00 | 600.00 | 520.00 | 1,040.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 5,610 | LNFT | 5.00 | 28,050.00 | 1.50 | 8,415.00 |
| 0015 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 1,000.00 | 1,000.00 | 4,000.00 | 4,000.00 |
| 0016 | 302-02-01060 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) | 21,519 | SQYD | 5.00 | 107,595.00 | 11.00 | 236,709.00 |
| 0017 | 302-02-01560 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) | 2,796.9 | SQYD | 40.00 | 111,876.00 | 18.00 | 50,344.20 |
| 0018 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 25,132 | SQYD | 10.00 | 251,320.00 | 17.00 | 427,244.00 |
| 0019 | 304-05-00100 | Lime Treatment (Type E) | 255.15 | TON | 350.00 | 89,302.50 | 385.00 | 98,232.75 |
| 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 22.8 | CUYD | 150.00 | 3,420.00 | 150.00 | 3,420.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 10.00 | 10,000.00 | 80.00 | 80,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 882.9 | TON | 200.00 | 176,580.00 | 150.00 | 132,435.00 |
| 0023 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 17,963 | SQYD | 75.00 | 1,347,225.00 | 68.00 | 1,221,484.00 |
| 0024 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 2,626.4 | SQYD | 75.00 | 196,980.00 | 100.00 | 262,640.00 |
| 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 10 | EACH | 300.00 | 3,000.00 | 200.00 | 2,000.00 |
| 0026 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 300 | LNFT | 250.00 | 75,000.00 | 225.00 | 67,500.00 |
| 0027 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,428 | LNFT | 80.00 | 194,240.00 | 50.00 | 121,400.00 |
| 0028 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 116 | LNFT | 85.00 | 9,860.00 | 55.00 | 6,380.00 |
| 0029 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 240 | LNFT | 120.00 | 28,800.00 | 70.00 | 16,800.00 |
| 0030 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 446 | LNFT | 275.00 | 122,650.00 | 220.00 | 98,120.00 |
| 0031 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 134 | LNFT | 100.00 | 13,400.00 | 53.00 | 7,102.00 |
| 0032 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 30 | LNFT | 100.00 | 3,000.00 | 58.00 | 1,740.00 |
| 0033 | 701-03-02140 | Storm Drain Pipe (Outfall) (54" CMP) | 28 | LNFT | 220.00 | 6,160.00 | 230.00 | 6,440.00 |
| 0034 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 120 | LNFT | 85.00 | 10,200.00 | 56.00 | 6,720.00 |
| 0035 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 3,000.00 | 6,000.00 | 1,400.00 | 2,800.00 |
| 0036 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 3,000.00 | 3,000.00 | 1,800.00 | 1,800.00 |
| 0037 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 3,500.00 | 17,500.00 | 1,300.00 | 6,500.00 |
| 0038 | 702-03-00500 | Catch Basins (CB-06) | 61 | EACH | 3,500.00 | 213,500.00 | 3,200.00 | 195,200.00 |
| 0039 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,000.00 | 4,000.00 | 4,400.00 | 4,400.00 |
| 0040 | 702-03-00700 | Catch Basins (CB-08) | 9 | EACH | 6,500.00 | 58,500.00 | 7,800.00 | 70,200.00 |
| 0041 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 5,000.00 | 10,000.00 | 1,600.00 | 3,200.00 |
| 0042 | 703-03-00100 | Perforated Pipe Underdrains | 3,153 | LNFT | 10.00 | 31,530.00 | 12.00 | 37,836.00 |
| 0043 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 282 | LNFT | 35.00 | 9,870.00 | 9.00 | 2,538.00 |
| 0044 | 705-09-00100 | Rebuilt Fence | 421 | LNFT | 30.00 | 12,630.00 | 7.00 | 2,947.00 |
| 0045 | 706-01-00100 | Concrete Walk (4" Thick) | 148.7 | SQYD | 40.00 | 5,948.00 | 34.00 | 5,055.80 |
| 0046 | 706-02-00300 | Concrete Drive (8" Thick) | 625 | SQYD | 45.00 | 28,125.00 | 52.00 | 32,500.00 |
| 0047 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 305.4 | SQYD | 40.00 | 12,216.00 | 34.00 | 10,383.60 |
| 0048 | 707-01-00200 | Concrete Curb (Barrier) | 325.4 | LNFT | 10.00 | 3,254.00 | 30.00 | 9,762.00 |
| 0049 | 707-01-00300 | Concrete Curb (Mountable) | 5,358.7 | LNFT | 6.00 | 32,152.20 | 12.00 | 64,304.40 |
| 0050 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,194.8 | LNFT | 23.00 | 27,480.40 | 21.00 | 25,090.80 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 125,000.00 | 125,000.00 |
| 0052 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.00 | 24.00 | 1.00 | 24.00 |
| 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.024 | MILE | 600.00 | 1,814.40 | 545.00 | 1,648.08 |
| 0054 | 716-01-00100 | Mulch (Vegetative) | 3.27 | TON | 900.00 | 2,943.00 | 425.00 | 1,389.75 |
| 0055 | 717-01-00100 | Seeding | 100 | LB | 30.00 | 3,000.00 | 8.45 | 845.00 |
| 0056 | 718-01-00100 | Fertilizer | 2,000 | LB | 1.00 | 2,000.00 | 0.60 | 1,200.00 |
| 0057 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 540 | SQYD | 1.33 | 718.20 | 1.20 | 648.00 |
| 0058 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 620 | SQYD | 2.00 | 1,240.00 | 1.80 | 1,116.00 |
| 0059 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 |
| 0060 | 725-01-00100 | Temporary Detour Roads | 2,113.8 | SQYD | 53.70 | 113,511.06 | 70.00 | 147,966.00 |
| 0061 | 726-01-00100 | Bedding Material | 894.5 | CUYD | 100.00 | 89,450.00 | 60.00 | 53,670.00 |
| 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 500,000.00 | 500,000.00 |
| 0063 | 729-19-00300 | Dead End Road Installations (Type C) | 2 | EACH | 800.00 | 1,600.00 | 1,500.00 | 3,000.00 |
| 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 402 | EACH | 5.00 | 2,010.00 | 6.00 | 2,412.00 |
| 0065 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,375 | LNFT | 1.00 | 1,375.00 | 1.75 | 2,406.25 |
| 0066 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 595 | LNFT | 1.50 | 892.50 | 3.00 | 1,785.00 |
| 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 362 | LNFT | 3.00 | 1,086.00 | 5.00 | 1,810.00 |
| 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.309 | MILE | 2,500.00 | 8,272.50 | 3,000.00 | 9,927.00 |
| 0069 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) (10' Length at 30' Intervals) | 1.327 | MILE | 600.00 | 796.20 | 785.00 | 1,041.70 |
| 0070 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.45 | MILE | 4,000.00 | 1,800.00 | 3,600.00 | 1,620.00 |
| 0071 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 200.00 | 3,200.00 | 250.00 | 4,000.00 |
| 0072 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 10 | EACH | 200.00 | 2,000.00 | 250.00 | 2,500.00 |
| 0073 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 200.00 | 2,800.00 | 250.00 | 3,500.00 |
| 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 100,000.00 | 100,000.00 |
| 0075 | NS-P17-00001 | NS Traffic Signal System | 1 | LUMP | 375,000.00 | 375,000.00 | 400,000.00 | 400,000.00 |
| CONTRACTOR TOTAL | 4,774,122.96 | 5,184,882.43 | ||||||