LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 742-17-0149
Parish: East Baton Rouge
Routes:
Description: C.T. Paving (Frenchtown to Greenwell Springs Road)
Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost: $4,634,992.18


RankLicenseBidderConstruction Bid
1 12312 Gilchrist Construction Co. LLC $3,238,737.16
2 39462 Jb James Construction Llc $3,405,681.22
3 34567 James Construction Group LLC $3,501,741.79
4 12198 Byron E. Talbot Contractor, Inc. $3,694,699.97
5 52306 Cecil Perry Improvements Llc $3,859,738.00
6 48896 Command Construction Industries LLC $3,894,403.80
7 00046 Barber Bros. Contracting Co., L.L.C $3,947,656.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
Jb James Construction Llc
- 3 -
James Construction Group LLC
- 4 -
Byron E. Talbot Contractor, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 2,500.00 2,500.00 34,000.00 34,000.00 5,000.00 5,000.00 10,000.00 10,000.00
0002 203-01-00100 General Excavation 4,457      CUYD 3.15 14,039.55 6.00 26,742.00 7.00 31,199.00 7.00 31,199.00
0003 203-03-00100 Embankment 5,122      CUYD 8.30 42,512.60 11.00 56,342.00 8.30 42,512.60 7.50 38,415.00
0004 203-04-00300 Nonplastic Embankment (Stone) 395      CUYD 120.00 47,400.00 50.00 19,750.00 110.00 43,450.00 104.00 41,080.00
0005 204-02-00100 Temporary Hay or Straw Bales 100      EACH 14.00 1,400.00 10.00 1,000.00 13.00 1,300.00 10.75 1,075.00
0006 204-05-00100 Temporary Sediment Check Dams (Hay) 16      EACH 240.00 3,840.00 100.00 1,600.00 118.29 1,892.64 106.00 1,696.00
0007 204-05-00200 Temporary Sediment Check Dams (Stone) 4      EACH 300.00 1,200.00 400.00 1,600.00 240.00 960.00 450.00 1,800.00
0008 204-06-00100 Temporary Silt Fencing 830      LNFT 1.40 1,162.00 2.00 1,660.00 2.23 1,850.90 2.20 1,826.00
0009 204-07-00100 Temporary Stone Construction Entrance 2      EACH 3,000.00 6,000.00 2,500.00 5,000.00 1,500.00 3,000.00 2,300.00 4,600.00
0010 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) 34,063.5    SQYD 9.40 320,196.90 11.50 391,730.25 15.00 510,952.50 10.05 342,338.18
0011 302-02-01560 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) 6,945.8    SQYD 12.00 83,349.60 9.00 62,512.20 15.00 104,187.00 13.25 92,031.85
0012 302-02-04020 Class II Base Course (8 1/2" Thick) (Soil Cement) 39,808.4    SQYD 10.20 406,045.68 8.50 338,371.40 9.50 378,179.80 11.95 475,710.38
0013 304-05-00100 Lime Treatment (Type E) 564.27   TON 65.00 36,677.55 1.00 564.27 225.00 126,960.75 250.00 141,067.50
0014 401-01-00100 Aggregate Surface Course (Net Section) 56.1    CUYD 80.00 4,488.00 70.00 3,927.00 45.00 2,524.50 76.00 4,263.60
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 45.00 22,500.00 50.00 25,000.00 33.00 16,500.00 70.00 35,000.00
0016 502-01-00100 Superpave Asphaltic Concrete 1,546.4    TON 120.00 185,568.00 90.00 139,176.00 95.00 146,908.00 95.00 146,908.00
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 6.6    TON 300.00 1,980.00 200.00 1,320.00 150.00 990.00 500.00 3,300.00
0018 601-01-00500 Portland Cement Concrete Pavement (10" Thick) 31,913.4    SQYD 42.00 1,340,362.80 44.00 1,404,189.60 42.00 1,340,362.80 52.50 1,675,453.50
0019 601-04-00100 Portland Cement Concrete Pavement Coring 100      EACH 80.00 8,000.00 100.00 10,000.00 100.00 10,000.00 140.00 14,000.00
0020 701-03-01000 Storm Drain Pipe (15" RCP/PP) 1,913      LNFT 42.00 80,346.00 50.00 95,650.00 39.00 74,607.00 40.00 76,520.00
0021 701-03-02000 Storm Drain Pipe (Outfall) (15" PP or 18" CMP) 164      LNFT 53.00 8,692.00 60.00 9,840.00 48.00 7,872.00 106.00 17,384.00
0022 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 30      LNFT 34.00 1,020.00 60.00 1,800.00 52.00 1,560.00 63.00 1,890.00
0023 702-03-00500 Catch Basins (CB-06) 33      EACH 3,500.00 115,500.00 3,400.00 112,200.00 2,500.00 82,500.00 2,500.00 82,500.00
0024 702-03-00600 Catch Basins (CB-07) 4      EACH 5,200.00 20,800.00 4,200.00 16,800.00 3,650.00 14,600.00 3,500.00 14,000.00
0025 702-03-00700 Catch Basins (CB-08) 2      EACH 6,800.00 13,600.00 5,600.00 11,200.00 6,300.00 12,600.00 6,500.00 13,000.00
0026 703-03-00100 Perforated Pipe Underdrains 2,220      LNFT 12.00 26,640.00 10.00 22,200.00 8.00 17,760.00 11.50 25,530.00
0027 704-03-00100 Blocked Out Guard Rail 250      LNFT 20.00 5,000.00 18.00 4,500.00 19.50 4,875.00 18.00 4,500.00
0028 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 40.00 4,000.00 65.00 6,500.00 36.50 3,650.00 70.00 7,000.00
0029 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,300.00 9,200.00 2,000.00 8,000.00 2,080.00 8,320.00 2,100.00 8,400.00
0030 706-03-00100 Incidental Concrete Paving (4" Thick) 170.4    SQYD 64.00 10,905.60 44.00 7,497.60 52.00 8,860.80 50.00 8,520.00
0031 707-01-00300 Concrete Curb (Mountable) 9,936      LNFT 3.40 33,782.40 3.50 34,776.00 3.20 31,795.20 6.00 59,616.00
0032 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00 80,000.00 80,000.00 8,300.00 8,300.00 5,000.00 5,000.00
0033 717-01-00100 Seeding 1,000      LB 7.50 7,500.00 7.00 7,000.00 7.00 7,000.00 7.50 7,500.00
0034 718-01-00100 Fertilizer 10,000      LB 0.45 4,500.00 0.65 6,500.00 0.65 6,500.00 0.70 7,000.00
0035 722-01-00100 Project Site Laboratory 1      EACH 5,000.00 5,000.00 7,000.00 7,000.00 10,000.00 10,000.00 8,500.00 8,500.00
0036 726-01-00100 Bedding Material 422      CUYD 60.00 25,320.00 55.00 23,210.00 75.00 31,650.00 65.00 27,430.00
0037 727-01-00100 Mobilization 1      LUMP 270,000.00 270,000.00 340,000.00 340,000.00 350,000.00 350,000.00 190,000.00 190,000.00
0038 729-16-00100 Object Marker Assembly (Type 1) 4      EACH 83.00 332.00 70.00 280.00 65.00 260.00 125.00 500.00
0039 731-01-00100 Nonreflectorized Raised Pavement Markers 700      EACH 11.00 7,700.00 10.00 7,000.00 10.00 7,000.00 11.00 7,700.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 437      EACH 5.80 2,534.60 5.00 2,185.00 5.00 2,185.00 5.30 2,316.10
0041 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 235      LNFT 1.50 352.50 1.00 235.00 1.00 235.00 1.05 246.75
0042 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 39      LNFT 5.50 214.50 5.00 195.00 5.00 195.00 5.30 206.70
0043 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 4.345  MILE 2,800.00 12,166.00 2,900.00 12,600.50 2,900.00 12,600.50 3,075.00 13,360.88
0044 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.172  MILE 940.00 2,041.68 1,000.00 2,172.00 1,000.00 2,172.00 1,050.00 2,280.60
0045 732-03-02040 Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.134  MILE 3,300.00 442.20 3,100.00 415.40 3,200.00 428.80 3,395.00 454.93
0046 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 3      EACH 235.00 705.00 180.00 540.00 180.00 540.00 190.00 570.00
0047 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 2      EACH 235.00 470.00 180.00 360.00 180.00 360.00 190.00 380.00
0048 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 3      EACH 250.00 750.00 180.00 540.00 195.00 585.00 210.00 630.00
0049 740-01-00100 Construction Layout 1      LUMP 30,000.00 30,000.00 60,000.00 60,000.00 24,000.00 24,000.00 40,000.00 40,000.00
                         
    CONTRACTOR TOTAL       3,238,737.16   3,405,681.22   3,501,741.79   3,694,699.97



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Cecil Perry Improvements Llc
- 6 -
Command Construction Industries LLC
- 7 -
Barber Bros. Contracting Co., L.L.C
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 7,000.00 7,000.00 10,000.00 10,000.00 20,000.00 20,000.00
0002 203-01-00100 General Excavation 4,457      CUYD 8.64 38,508.48 5.00 22,285.00 8.00 35,656.00
0003 203-03-00100 Embankment 5,122      CUYD 19.75 101,159.50 10.00 51,220.00 10.00 51,220.00
0004 203-04-00300 Nonplastic Embankment (Stone) 395      CUYD 93.16 36,798.20 80.00 31,600.00 125.00 49,375.00
0005 204-02-00100 Temporary Hay or Straw Bales 100      EACH 12.00 1,200.00 15.00 1,500.00 20.00 2,000.00
0006 204-05-00100 Temporary Sediment Check Dams (Hay) 16      EACH 116.00 1,856.00 150.00 2,400.00 150.00 2,400.00
0007 204-05-00200 Temporary Sediment Check Dams (Stone) 4      EACH 610.00 2,440.00 250.00 1,000.00 800.00 3,200.00
0008 204-06-00100 Temporary Silt Fencing 830      LNFT 2.04 1,693.20 3.00 2,490.00 2.00 1,660.00
0009 204-07-00100 Temporary Stone Construction Entrance 2      EACH 2,964.00 5,928.00 2,500.00 5,000.00 5,000.00 10,000.00
0010 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) 34,063.5    SQYD 10.50 357,666.75 8.00 272,508.00 12.00 408,762.00
0011 302-02-01560 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) (Stone Only) 6,945.8    SQYD 13.20 91,684.56 8.00 55,566.40 17.50 121,551.50
0012 302-02-04020 Class II Base Course (8 1/2" Thick) (Soil Cement) 39,808.4    SQYD 6.45 256,764.18 10.00 398,084.00 12.00 477,700.80
0013 304-05-00100 Lime Treatment (Type E) 564.27   TON 278.00 156,867.06 100.00 56,427.00 260.00 146,710.20
0014 401-01-00100 Aggregate Surface Course (Net Section) 56.1    CUYD 87.00 4,880.70 100.00 5,610.00 100.00 5,610.00
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 69.92 34,960.00 10.00 5,000.00 0.00 0.00
0016 502-01-00100 Superpave Asphaltic Concrete 1,546.4    TON 120.00 185,568.00 125.00 193,300.00 90.00 139,176.00
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 6.6    TON 260.00 1,716.00 400.00 2,640.00 360.00 2,376.00
0018 601-01-00500 Portland Cement Concrete Pavement (10" Thick) 31,913.4    SQYD 57.00 1,819,063.80 60.00 1,914,804.00 50.00 1,595,670.00
0019 601-04-00100 Portland Cement Concrete Pavement Coring 100      EACH 81.00 8,100.00 250.00 25,000.00 120.00 12,000.00
0020 701-03-01000 Storm Drain Pipe (15" RCP/PP) 1,913      LNFT 38.00 72,694.00 50.00 95,650.00 30.00 57,390.00
0021 701-03-02000 Storm Drain Pipe (Outfall) (15" PP or 18" CMP) 164      LNFT 41.00 6,724.00 70.00 11,480.00 45.00 7,380.00
0022 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 30      LNFT 34.00 1,020.00 50.00 1,500.00 50.00 1,500.00
0023 702-03-00500 Catch Basins (CB-06) 33      EACH 3,757.00 123,981.00 3,250.00 107,250.00 3,000.00 99,000.00
0024 702-03-00600 Catch Basins (CB-07) 4      EACH 4,690.00 18,760.00 4,000.00 16,000.00 4,600.00 18,400.00
0025 702-03-00700 Catch Basins (CB-08) 2      EACH 7,760.00 15,520.00 7,500.00 15,000.00 7,500.00 15,000.00
0026 703-03-00100 Perforated Pipe Underdrains 2,220      LNFT 11.50 25,530.00 10.00 22,200.00 10.00 22,200.00
0027 704-03-00100 Blocked Out Guard Rail 250      LNFT 18.50 4,625.00 17.00 4,250.00 30.00 7,500.00
0028 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 70.00 7,000.00 65.00 6,500.00 75.00 7,500.00
0029 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,200.00 8,800.00 1,950.00 7,800.00 3,000.00 12,000.00
0030 706-03-00100 Incidental Concrete Paving (4" Thick) 170.4    SQYD 47.62 8,114.45 45.00 7,668.00 90.00 15,336.00
0031 707-01-00300 Concrete Curb (Mountable) 9,936      LNFT 7.25 72,036.00 5.00 49,680.00 7.00 69,552.00
0032 713-01-00100 Temporary Signs and Barricades 1      LUMP 9,990.00 9,990.00 1,000.00 1,000.00 25,000.00 25,000.00
0033 717-01-00100 Seeding 1,000      LB 8.00 8,000.00 2.00 2,000.00 12.00 12,000.00
0034 718-01-00100 Fertilizer 10,000      LB 0.75 7,500.00 2.00 20,000.00 1.00 10,000.00
0035 722-01-00100 Project Site Laboratory 1      EACH 14,943.00 14,943.00 1,000.00 1,000.00 10,000.00 10,000.00
0036 726-01-00100 Bedding Material 422      CUYD 90.26 38,089.72 75.00 31,650.00 30.00 12,660.00
0037 727-01-00100 Mobilization 1      LUMP 250,999.70 250,999.70 400,000.00 400,000.00 390,000.00 390,000.00
0038 729-16-00100 Object Marker Assembly (Type 1) 4      EACH 72.00 288.00 65.00 260.00 100.00 400.00
0039 731-01-00100 Nonreflectorized Raised Pavement Markers 700      EACH 10.50 7,350.00 10.00 7,000.00 12.00 8,400.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 437      EACH 5.50 2,403.50 5.00 2,185.00 6.50 2,840.50
0041 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 235      LNFT 1.10 258.50 1.00 235.00 2.00 470.00
0042 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 39      LNFT 5.50 214.50 5.00 195.00 6.00 234.00
0043 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 4.345  MILE 3,200.00 13,904.00 3,000.00 13,035.00 3,000.00 13,035.00
0044 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.172  MILE 1,100.00 2,389.20 1,100.00 2,389.20 1,000.00 2,172.00
0045 732-03-02040 Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) 0.134  MILE 3,500.00 469.00 3,300.00 442.20 3,500.00 469.00
0046 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 3      EACH 190.00 570.00 200.00 600.00 250.00 750.00
0047 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 2      EACH 190.00 380.00 200.00 400.00 250.00 500.00
0048 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 3      EACH 210.00 630.00 200.00 600.00 300.00 900.00
0049 740-01-00100 Construction Layout 1      LUMP 22,700.00 22,700.00 10,000.00 10,000.00 40,000.00 40,000.00
                     
    CONTRACTOR TOTAL       3,859,738.00   3,894,403.80   3,947,656.00