Bid Tabulations
Letting of
04/27/2011
LA DOTD Headquarters
| Lead Project: 742-10-0114-R1 | |
| Parish: Calcasieu | |
| Routes: | |
| Description: ELLIOTT RD. AT GAUTHIER ROAD INTERSECTION IMPROVEMENTS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,873,508.23 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $1,628,851.90 |
| 2 | 39155 | HD Truck & Tractor, LLC | $1,704,241.70 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $1,705,184.30 |
| 4 | 36384 | John Bailey, Inc. | $1,737,943.02 |
| 5 | 30774 | Progressive Construction Co., LLC | $1,818,173.06 |
| 6 | 50078 | Fenton Excavating & Const. Inc. | $2,298,178.01 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - HD Truck & Tractor, LLC |
- 3 - Gilchrist Construction Co. LLC |
- 4 - John Bailey, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 90,000.00 | 90,000.00 | 22,500.00 | 22,500.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 | 7,000.00 | 7,000.00 | 2,500.00 | 2,500.00 |
| 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,000.00 | 2,000.00 | 850.00 | 1,700.00 | 600.00 | 1,200.00 | 540.00 | 1,080.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 197 | SQYD | 14.00 | 2,758.00 | 20.00 | 3,940.00 | 15.00 | 2,955.00 | 12.00 | 2,364.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 75 | LNFT | 12.00 | 900.00 | 36.00 | 2,700.00 | 10.00 | 750.00 | 12.00 | 900.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP or RCPA | 82 | LNFT | 12.00 | 984.00 | 33.00 | 2,706.00 | 10.00 | 820.00 | 12.00 | 984.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 24" RCP | 85 | LNFT | 5.00 | 425.00 | 33.00 | 2,805.00 | 10.00 | 850.00 | 6.00 | 510.00 |
| 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 23 | LNFT | 5.00 | 115.00 | 25.00 | 575.00 | 10.00 | 230.00 | 6.00 | 138.00 |
| 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 30" RCP | 86 | LNFT | 5.00 | 430.00 | 25.00 | 2,150.00 | 10.00 | 860.00 | 6.00 | 516.00 |
| 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP or PCP | 159 | LNFT | 5.00 | 795.00 | 28.00 | 4,452.00 | 10.00 | 1,590.00 | 6.00 | 954.00 |
| 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP or CMP | 50 | LNFT | 5.00 | 250.00 | 21.00 | 1,050.00 | 10.00 | 500.00 | 6.00 | 300.00 |
| 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 42" CMPA | 139 | LNFT | 5.00 | 695.00 | 24.00 | 3,336.00 | 10.00 | 1,390.00 | 6.00 | 834.00 |
| 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) 48" RCPA | 66 | LNFT | 12.00 | 792.00 | 17.00 | 1,122.00 | 10.00 | 660.00 | 12.00 | 792.00 |
| 0014 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" RCP | 56 | LNFT | 12.00 | 672.00 | 20.00 | 1,120.00 | 10.00 | 560.00 | 12.00 | 672.00 |
| 0015 | 202-02-38500 | Removal of Surfacing and Stablized Base | 257.9 | SQYD | 5.00 | 1,289.50 | 11.00 | 2,836.90 | 15.00 | 3,868.50 | 6.00 | 1,547.40 |
| 0016 | 203-01-00100 | General Excavation | 2,523 | CUYD | 12.00 | 30,276.00 | 6.50 | 16,399.50 | 6.00 | 15,138.00 | 10.00 | 25,230.00 |
| 0017 | 203-03-00100 | Embankment | 2,523 | CUYD | 20.00 | 50,460.00 | 10.50 | 26,491.50 | 16.50 | 41,629.50 | 15.00 | 37,845.00 |
| 0018 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 220,000.00 | 220,000.00 | 230,000.00 | 230,000.00 | 285,000.00 | 285,000.00 |
| 0019 | 204-02-00100 | Temporary Hay or Straw Bales | 150 | EACH | 10.00 | 1,500.00 | 16.50 | 2,475.00 | 17.00 | 2,550.00 | 25.00 | 3,750.00 |
| 0020 | 204-06-00100 | Temporary Silt Fencing | 5,000 | LNFT | 1.50 | 7,500.00 | 1.50 | 7,500.00 | 2.00 | 10,000.00 | 4.00 | 20,000.00 |
| 0021 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,190.9 | SQYD | 17.00 | 105,245.30 | 23.00 | 142,390.70 | 24.00 | 148,581.60 | 28.00 | 173,345.20 |
| 0022 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 50.00 | 25,000.00 | 70.00 | 35,000.00 | 45.00 | 22,500.00 | 75.00 | 37,500.00 |
| 0023 | 502-01-00100 | Superpave Asphaltic Concrete | 2,358.7 | TON | 97.00 | 228,793.90 | 89.00 | 209,924.30 | 105.00 | 247,663.50 | 97.00 | 228,793.90 |
| 0024 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 349.2 | TON | 111.00 | 38,761.20 | 93.00 | 32,475.60 | 200.00 | 69,840.00 | 100.00 | 34,920.00 |
| 0025 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,616 | SQYD | 5.00 | 8,080.00 | 5.00 | 8,080.00 | 6.00 | 9,696.00 | 8.00 | 12,928.00 |
| 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -90 | CUYD | 1.00 | -90.00 | 1.00 | -90.00 | 10.00 | -900.00 | 0.01 | -0.90 |
| 0027 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 345 | SQYD | 76.00 | 26,220.00 | 66.00 | 22,770.00 | 122.00 | 42,090.00 | 100.00 | 34,500.00 |
| 0028 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 184 | LNFT | 100.00 | 18,400.00 | 115.00 | 21,160.00 | 110.00 | 20,240.00 | 119.00 | 21,896.00 |
| 0029 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) 15" RCP ONLY | 8 | LNFT | 35.00 | 280.00 | 70.00 | 560.00 | 35.00 | 280.00 | 39.00 | 312.00 |
| 0030 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 953 | LNFT | 35.00 | 33,355.00 | 56.00 | 53,368.00 | 35.00 | 33,355.00 | 39.00 | 37,167.00 |
| 0031 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 302 | LNFT | 38.00 | 11,476.00 | 71.00 | 21,442.00 | 39.00 | 11,778.00 | 42.00 | 12,684.00 |
| 0032 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) 18" RCP ONLY | 74 | LNFT | 45.00 | 3,330.00 | 82.00 | 6,068.00 | 39.00 | 2,886.00 | 42.00 | 3,108.00 |
| 0033 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) 36" RCP ONLY | 140 | LNFT | 76.00 | 10,640.00 | 128.00 | 17,920.00 | 85.00 | 11,900.00 | 90.00 | 12,600.00 |
| 0034 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 70 | LNFT | 55.00 | 3,850.00 | 97.00 | 6,790.00 | 54.00 | 3,780.00 | 60.00 | 4,200.00 |
| 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 252 | LNFT | 65.00 | 16,380.00 | 109.00 | 27,468.00 | 74.00 | 18,648.00 | 77.00 | 19,404.00 |
| 0036 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 576 | LNFT | 85.00 | 48,960.00 | 115.00 | 66,240.00 | 95.00 | 54,720.00 | 100.00 | 57,600.00 |
| 0037 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 135.00 | 5,400.00 | 172.00 | 6,880.00 | 120.00 | 4,800.00 | 122.00 | 4,880.00 |
| 0038 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 18 | LNFT | 125.00 | 2,250.00 | 142.00 | 2,556.00 | 120.00 | 2,160.00 | 126.00 | 2,268.00 |
| 0039 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 50 | LNFT | 125.00 | 6,250.00 | 120.00 | 6,000.00 | 115.00 | 5,750.00 | 120.00 | 6,000.00 |
| 0040 | 702-02-00200 | Manholes (R-CB-11) | 4 | EACH | 3,800.00 | 15,200.00 | 3,900.00 | 15,600.00 | 4,000.00 | 16,000.00 | 4,200.00 | 16,800.00 |
| 0041 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 4,500.00 | 9,000.00 | 4,900.00 | 9,800.00 | 5,100.00 | 10,200.00 | 5,400.00 | 10,800.00 |
| 0042 | 702-03-00100 | Catch Basins (CB-01) | 28 | EACH | 2,675.00 | 74,900.00 | 2,250.00 | 63,000.00 | 2,700.00 | 75,600.00 | 3,000.00 | 84,000.00 |
| 0043 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 2,050.00 | 10,250.00 | 3,000.00 | 15,000.00 | 2,300.00 | 11,500.00 | 2,400.00 | 12,000.00 |
| 0044 | 702-08-00100 | Side Drain Safety End (Type I) | 5 | EACH | 1,500.00 | 7,500.00 | 1,950.00 | 9,750.00 | 1,700.00 | 8,500.00 | 1,740.00 | 8,700.00 |
| 0045 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 3,000.00 | 12,000.00 | 5,250.00 | 21,000.00 | 3,500.00 | 14,000.00 | 3,540.00 | 14,160.00 |
| 0046 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 167 | LNFT | 30.00 | 5,010.00 | 28.00 | 4,676.00 | 26.00 | 4,342.00 | 28.00 | 4,676.00 |
| 0047 | 706-02-00200 | Concrete Drive (6" Thick) | 117.1 | SQYD | 60.00 | 7,026.00 | 75.00 | 8,782.50 | 100.00 | 11,710.00 | 75.00 | 8,782.50 |
| 0048 | 710-01-00100 | Flowable Fill | 477 | CUYD | 99.00 | 47,223.00 | 115.00 | 54,855.00 | 110.00 | 52,470.00 | 95.00 | 45,315.00 |
| 0049 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 525 | SQYD | 83.00 | 43,575.00 | 106.00 | 55,650.00 | 95.00 | 49,875.00 | 98.00 | 51,450.00 |
| 0050 | 712-03-00100 | Stone Revetment | 1,617 | SQYD | 40.00 | 64,680.00 | 75.00 | 121,275.00 | 50.00 | 80,850.00 | 65.00 | 105,105.00 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 54,000.00 | 54,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 |
| 0052 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 11,872 | LNFT | 0.20 | 2,374.40 | 0.17 | 2,018.24 | 0.25 | 2,968.00 | 0.25 | 2,968.00 |
| 0053 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 48 | LNFT | 0.60 | 28.80 | 0.49 | 23.52 | 0.75 | 36.00 | 0.75 | 36.00 |
| 0054 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 17,330 | SQYD | 1.70 | 29,461.00 | 1.10 | 19,063.00 | 1.54 | 26,688.20 | 1.50 | 25,995.00 |
| 0055 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 378 | SQYD | 2.00 | 756.00 | 1.10 | 415.80 | 2.40 | 907.20 | 3.00 | 1,134.00 |
| 0056 | 726-01-00100 | Bedding Material | 400 | CUYD | 90.00 | 36,000.00 | 74.00 | 29,600.00 | 100.00 | 40,000.00 | 90.00 | 36,000.00 |
| 0057 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 90,000.00 | 90,000.00 | 155,000.00 | 155,000.00 | 67,500.00 | 67,500.00 |
| 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,488 | EACH | 5.00 | 7,440.00 | 5.00 | 7,440.00 | 5.90 | 8,779.20 | 6.00 | 8,928.00 |
| 0059 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 15,988 | LNFT | 0.60 | 9,592.80 | 0.61 | 9,752.68 | 0.70 | 11,191.60 | 0.75 | 11,991.00 |
| 0060 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 368 | LNFT | 2.00 | 736.00 | 1.10 | 404.80 | 2.35 | 864.80 | 2.40 | 883.20 |
| 0061 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 622 | LNFT | 5.00 | 3,110.00 | 5.50 | 3,421.00 | 5.90 | 3,669.80 | 6.00 | 3,732.00 |
| 0062 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 200.00 | 1,200.00 | 330.00 | 1,980.00 | 215.00 | 1,290.00 | 225.00 | 1,350.00 |
| 0063 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 200.00 | 800.00 | 330.00 | 1,320.00 | 220.00 | 880.00 | 240.00 | 960.00 |
| 0064 | 735-01-00100 | Mailboxes | 2 | EACH | 50.00 | 100.00 | 115.00 | 230.00 | 20.00 | 40.00 | 150.00 | 300.00 |
| 0065 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 150.00 | 300.00 | 150.00 | 300.00 | 150.00 | 300.00 |
| 0066 | 739-01-00100 | Hydro-Seeding | 5.78 | ACRE | 1,100.00 | 6,358.00 | 1,215.00 | 7,022.70 | 1,300.00 | 7,514.00 | 1,500.00 | 8,670.00 |
| 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 32,500.00 | 32,500.00 | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 |
| 0068 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 5 | EACH | 500.00 | 2,500.00 | 1,235.00 | 6,175.00 | 500.00 | 2,500.00 | 540.00 | 2,700.00 |
| 0069 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 16.64 | CUYD | 900.00 | 14,976.00 | 1,300.00 | 21,632.00 | 950.00 | 15,808.00 | 1,038.00 | 17,272.32 |
| 0070 | 806-01-00100 | Deformed Reinforcing Steel | 944 | LB | 2.00 | 1,888.00 | 3.70 | 3,492.80 | 2.35 | 2,218.40 | 2.40 | 2,265.60 |
| 0071 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,950 | INLF | 1.00 | 8,950.00 | 1.60 | 14,320.00 | 0.50 | 4,475.00 | 0.90 | 8,055.00 |
| 0072 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 294 | INLF | 1.00 | 294.00 | 3.64 | 1,070.16 | 2.00 | 588.00 | 1.20 | 352.80 |
| 0073 | NS-ENH-06000 | Fence (Wood) 6' Height | 70 | LNFT | 50.00 | 3,500.00 | 33.00 | 2,310.00 | 30.00 | 2,100.00 | 32.00 | 2,240.00 |
| CONTRACTOR TOTAL | 1,628,851.90 | 1,704,241.70 | 1,705,184.30 | 1,737,943.02 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Progressive Construction Co., LLC |
- 6 - Fenton Excavating & Const. Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 39,825.00 | 39,825.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 11,800.00 | 11,800.00 |
| 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,400.00 | 2,800.00 | 513.30 | 1,026.60 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 197 | SQYD | 10.00 | 1,970.00 | 23.60 | 4,649.20 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 75 | LNFT | 20.00 | 1,500.00 | 13.64 | 1,023.08 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP or RCPA | 82 | LNFT | 25.00 | 2,050.00 | 20.86 | 1,710.68 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 24" RCP | 85 | LNFT | 20.00 | 1,700.00 | 21.83 | 1,855.55 |
| 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP | 23 | LNFT | 20.00 | 460.00 | 11.66 | 268.13 |
| 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 30" RCP | 86 | LNFT | 25.00 | 2,150.00 | 18.11 | 1,557.72 |
| 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP or PCP | 159 | LNFT | 25.00 | 3,975.00 | 8.96 | 1,424.00 |
| 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) 24" RCP or CMP | 50 | LNFT | 25.00 | 1,250.00 | 10.97 | 548.70 |
| 0012 | 202-02-32140 | Removal of Pipe (Storm Drain) 42" CMPA | 139 | LNFT | 30.00 | 4,170.00 | 18.35 | 2,550.51 |
| 0013 | 202-02-32140 | Removal of Pipe (Storm Drain) 48" RCPA | 66 | LNFT | 30.00 | 1,980.00 | 38.61 | 2,548.39 |
| 0014 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" RCP | 56 | LNFT | 25.00 | 1,400.00 | 18.46 | 1,033.48 |
| 0015 | 202-02-38500 | Removal of Surfacing and Stablized Base | 257.9 | SQYD | 10.00 | 2,579.00 | 12.50 | 3,222.72 |
| 0016 | 203-01-00100 | General Excavation | 2,523 | CUYD | 10.00 | 25,230.00 | 17.42 | 43,958.23 |
| 0017 | 203-03-00100 | Embankment | 2,523 | CUYD | 17.50 | 44,152.50 | 23.06 | 58,180.38 |
| 0018 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 180,500.00 | 180,500.00 | 362,954.69 | 362,954.69 |
| 0019 | 204-02-00100 | Temporary Hay or Straw Bales | 150 | EACH | 11.00 | 1,650.00 | 17.70 | 2,655.00 |
| 0020 | 204-06-00100 | Temporary Silt Fencing | 5,000 | LNFT | 3.00 | 15,000.00 | 1.89 | 9,440.00 |
| 0021 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,190.9 | SQYD | 26.25 | 162,511.13 | 21.34 | 132,107.62 |
| 0022 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 82.00 | 41,000.00 | 80.89 | 40,444.50 |
| 0023 | 502-01-00100 | Superpave Asphaltic Concrete | 2,358.7 | TON | 107.00 | 252,380.90 | 137.94 | 325,361.44 |
| 0024 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 349.2 | TON | 180.75 | 63,117.90 | 212.27 | 74,124.68 |
| 0025 | 509-01-00100 | Cold Planing Asphaltic Pavement | 1,616 | SQYD | 6.00 | 9,696.00 | 14.87 | 24,026.69 |
| 0026 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -90 | CUYD | 1.00 | -90.00 | 0.01 | -1.08 |
| 0027 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 345 | SQYD | 128.00 | 44,160.00 | 203.55 | 70,224.75 |
| 0028 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 184 | LNFT | 180.50 | 33,212.00 | 164.56 | 30,279.59 |
| 0029 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) 15" RCP ONLY | 8 | LNFT | 40.00 | 320.00 | 46.02 | 368.16 |
| 0030 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 953 | LNFT | 40.00 | 38,120.00 | 46.06 | 43,890.42 |
| 0031 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 302 | LNFT | 74.00 | 22,348.00 | 54.96 | 16,599.13 |
| 0032 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) 18" RCP ONLY | 74 | LNFT | 96.00 | 7,104.00 | 54.82 | 4,056.90 |
| 0033 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) 36" RCP ONLY | 140 | LNFT | 120.00 | 16,800.00 | 109.93 | 15,390.06 |
| 0034 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 70 | LNFT | 68.50 | 4,795.00 | 64.22 | 4,495.12 |
| 0035 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 252 | LNFT | 87.00 | 21,924.00 | 84.71 | 21,347.42 |
| 0036 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 576 | LNFT | 112.00 | 64,512.00 | 85.69 | 49,358.59 |
| 0037 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 40 | LNFT | 141.00 | 5,640.00 | 116.21 | 4,648.24 |
| 0038 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 18 | LNFT | 196.00 | 3,528.00 | 73.83 | 1,328.99 |
| 0039 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 50 | LNFT | 87.00 | 4,350.00 | 64.22 | 3,210.80 |
| 0040 | 702-02-00200 | Manholes (R-CB-11) | 4 | EACH | 3,900.00 | 15,600.00 | 5,148.34 | 20,593.36 |
| 0041 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 6,400.00 | 12,800.00 | 5,148.34 | 10,296.68 |
| 0042 | 702-03-00100 | Catch Basins (CB-01) | 28 | EACH | 2,500.00 | 70,000.00 | 3,103.40 | 86,895.20 |
| 0043 | 702-04-00200 | Adjusting Catch Basins | 5 | EACH | 3,000.00 | 15,000.00 | 2,065.00 | 10,325.00 |
| 0044 | 702-08-00100 | Side Drain Safety End (Type I) | 5 | EACH | 1,200.00 | 6,000.00 | 4,794.34 | 23,971.70 |
| 0045 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 3,500.00 | 14,000.00 | 9,549.74 | 38,198.96 |
| 0046 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 167 | LNFT | 30.00 | 5,010.00 | 25.96 | 4,335.32 |
| 0047 | 706-02-00200 | Concrete Drive (6" Thick) | 117.1 | SQYD | 60.00 | 7,026.00 | 63.60 | 7,447.79 |
| 0048 | 710-01-00100 | Flowable Fill | 477 | CUYD | 85.00 | 40,545.00 | 139.30 | 66,445.62 |
| 0049 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) | 525 | SQYD | 70.25 | 36,881.25 | 95.99 | 50,396.33 |
| 0050 | 712-03-00100 | Stone Revetment | 1,617 | SQYD | 55.00 | 88,935.00 | 48.26 | 78,039.65 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 115,500.00 | 115,500.00 | 50,150.00 | 50,150.00 |
| 0052 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 11,872 | LNFT | 0.17 | 2,018.24 | 0.18 | 2,101.34 |
| 0053 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 48 | LNFT | 0.50 | 24.00 | 0.53 | 25.49 |
| 0054 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 17,330 | SQYD | 1.82 | 31,540.60 | 1.38 | 23,915.40 |
| 0055 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 378 | SQYD | 1.98 | 748.44 | 1.38 | 522.02 |
| 0056 | 726-01-00100 | Bedding Material | 400 | CUYD | 60.00 | 24,000.00 | 87.96 | 35,182.80 |
| 0057 | 727-01-00100 | Mobilization | 1 | LUMP | 86,000.00 | 86,000.00 | 229,980.58 | 229,980.58 |
| 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,488 | EACH | 4.95 | 7,365.60 | 5.31 | 7,901.28 |
| 0059 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 15,988 | LNFT | 0.60 | 9,592.80 | 0.65 | 10,376.21 |
| 0060 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 368 | LNFT | 1.10 | 404.80 | 1.18 | 434.24 |
| 0061 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 622 | LNFT | 5.50 | 3,421.00 | 5.90 | 3,669.80 |
| 0062 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 330.00 | 1,980.00 | 354.00 | 2,124.00 |
| 0063 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 330.00 | 1,320.00 | 354.00 | 1,416.00 |
| 0064 | 735-01-00100 | Mailboxes | 2 | EACH | 25.00 | 50.00 | 206.50 | 413.00 |
| 0065 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 150.00 | 300.00 | 165.20 | 330.40 |
| 0066 | 739-01-00100 | Hydro-Seeding | 5.78 | ACRE | 1,155.00 | 6,675.90 | 4,381.34 | 25,324.15 |
| 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 47,200.00 | 47,200.00 |
| 0068 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 5 | EACH | 1,000.00 | 5,000.00 | 2,596.00 | 12,980.00 |
| 0069 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 16.64 | CUYD | 1,200.00 | 19,968.00 | 986.49 | 16,415.23 |
| 0070 | 806-01-00100 | Deformed Reinforcing Steel | 944 | LB | 4.00 | 3,776.00 | 5.31 | 5,012.64 |
| 0071 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,950 | INLF | 0.80 | 7,160.00 | 1.06 | 9,504.90 |
| 0072 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 294 | INLF | 2.50 | 735.00 | 2.36 | 693.84 |
| 0073 | NS-ENH-06000 | Fence (Wood) 6' Height | 70 | LNFT | 55.00 | 3,850.00 | 29.50 | 2,065.00 |
| CONTRACTOR TOTAL | 1,818,173.06 | 2,298,178.01 | ||||||