Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 737-28-0014 | |
| Parish: Lafayette | |
| Routes: LA 733 | |
| Description: 700' WEST OF US 167-JCT. US 167 AND JCT. US 167-JCT. LA 92 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, AND RELATED WORK. | |
| Estimated Construction Cost: $4,892,320.30 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 33663 | Glenn Lege Construction Inc | $4,413,290.54 |
| 2 | 04089 | H & S Construction Co., Inc. | $4,668,774.49 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $4,698,103.58 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $4,872,516.81 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Glenn Lege Construction Inc |
- 2 - H & S Construction Co., Inc. |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,500.00 | 10,500.00 | 82,000.00 | 82,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 721 | SQYD | 5.55 | 4,001.55 | 7.50 | 5,407.50 | 7.00 | 5,047.00 | 5.00 | 3,605.00 |
| 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 135 | LNFT | 6.50 | 877.50 | 3.00 | 405.00 | 10.00 | 1,350.00 | 5.00 | 675.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,313 | SQYD | 5.20 | 6,827.60 | 10.00 | 13,130.00 | 10.00 | 13,130.00 | 6.00 | 7,878.00 |
| 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 180 | LNFT | 3.50 | 630.00 | 3.50 | 630.00 | 10.00 | 1,800.00 | 5.00 | 900.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 269 | LNFT | 5.00 | 1,345.00 | 6.00 | 1,614.00 | 2.00 | 538.00 | 10.00 | 2,690.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 62,477.5 | SQYD | 2.20 | 137,450.50 | 3.75 | 234,290.63 | 2.85 | 178,060.88 | 3.15 | 196,804.13 |
| 0008 | 203-01-00100 | General Excavation | 200.3 | CUYD | 11.60 | 2,323.48 | 7.45 | 1,492.24 | 35.00 | 7,010.50 | 10.00 | 2,003.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 41,200.00 | 41,200.00 | 32,000.00 | 32,000.00 | 56,000.00 | 56,000.00 | 50,000.00 | 50,000.00 |
| 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 7.00 | 700.00 | 12.00 | 1,200.00 | 30.00 | 3,000.00 | 25.00 | 2,500.00 |
| 0011 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 100 | CUYD | 9.90 | 990.00 | 15.00 | 1,500.00 | 20.00 | 2,000.00 | 35.00 | 3,500.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 85 | EACH | 150.00 | 12,750.00 | 66.00 | 5,610.00 | 160.00 | 13,600.00 | 285.00 | 24,225.00 |
| 0013 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 2,290.6 | SQYD | 11.00 | 25,196.60 | 7.00 | 16,034.20 | 16.00 | 36,649.60 | 24.00 | 54,974.40 |
| 0014 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 73,321.7 | SQYD | 6.90 | 505,919.73 | 7.00 | 513,251.90 | 9.15 | 670,893.56 | 9.50 | 696,556.15 |
| 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,373 | CUYD | 19.00 | 26,087.00 | 44.00 | 60,412.00 | 30.00 | 41,190.00 | 45.00 | 61,785.00 |
| 0016 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 911 | CUYD | 34.50 | 31,429.50 | 33.00 | 30,063.00 | 7.00 | 6,377.00 | 35.00 | 31,885.00 |
| 0017 | 502-01-00100 | Superpave Asphaltic Concrete | 27,650.9 | TON | 79.60 | 2,201,011.64 | 79.00 | 2,184,421.10 | 80.00 | 2,212,072.00 | 85.00 | 2,350,326.50 |
| 0018 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,109.5 | TON | 144.00 | 303,768.00 | 115.00 | 242,592.50 | 145.00 | 305,877.50 | 145.00 | 305,877.50 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 373 | SQYD | 5.00 | 1,865.00 | 1.75 | 652.75 | 15.00 | 5,595.00 | 5.00 | 1,865.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -16 | CUYD | 1.00 | -16.00 | 0.01 | -0.16 | 0.10 | -1.60 | 10.00 | -160.00 |
| 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 107 | SQYD | 109.00 | 11,663.00 | 126.00 | 13,482.00 | 120.50 | 12,893.50 | 125.00 | 13,375.00 |
| 0022 | 510-02-00100 | Pavement Widening | 795 | SQYD | 79.50 | 63,202.50 | 132.00 | 104,940.00 | 54.00 | 42,930.00 | 74.00 | 58,830.00 |
| 0023 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,233 | LNFT | 39.00 | 48,087.00 | 60.50 | 74,596.50 | 56.00 | 69,048.00 | 43.00 | 53,019.00 |
| 0024 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 286 | LNFT | 55.50 | 15,873.00 | 82.50 | 23,595.00 | 76.00 | 21,736.00 | 60.00 | 17,160.00 |
| 0025 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 254 | LNFT | 89.00 | 22,606.00 | 137.50 | 34,925.00 | 126.00 | 32,004.00 | 120.00 | 30,480.00 |
| 0026 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 122 | LNFT | 120.00 | 14,640.00 | 170.50 | 20,801.00 | 160.00 | 19,520.00 | 145.00 | 17,690.00 |
| 0027 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 119 | LNFT | 150.00 | 17,850.00 | 198.00 | 23,562.00 | 190.00 | 22,610.00 | 190.00 | 22,610.00 |
| 0028 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 152 | LNFT | 180.00 | 27,360.00 | 231.00 | 35,112.00 | 220.00 | 33,440.00 | 200.00 | 30,400.00 |
| 0029 | 701-03-01160 | Storm Drain Pipe (72" RCP) | 580 | LNFT | 270.00 | 156,600.00 | 357.50 | 207,350.00 | 345.00 | 200,100.00 | 250.00 | 145,000.00 |
| 0030 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 31 | LNFT | 42.00 | 1,302.00 | 60.50 | 1,875.50 | 59.00 | 1,829.00 | 52.00 | 1,612.00 |
| 0031 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 200 | LNFT | 48.00 | 9,600.00 | 82.50 | 16,500.00 | 80.00 | 16,000.00 | 55.00 | 11,000.00 |
| 0032 | 701-07-00200 | Yard Drain Pipe (6") | 15 | LNFT | 13.00 | 195.00 | 22.00 | 330.00 | 21.00 | 315.00 | 25.00 | 375.00 |
| 0033 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 10 | LNFT | 95.40 | 954.00 | 165.00 | 1,650.00 | 160.00 | 1,600.00 | 165.00 | 1,650.00 |
| 0034 | 701-15-00100 | Concrete Collar | 5 | EACH | 400.00 | 2,000.00 | 990.00 | 4,950.00 | 950.00 | 4,750.00 | 545.00 | 2,725.00 |
| 0035 | 702-02-00300 | Manholes (R-CB-11 MOD) | 2 | EACH | 10,652.00 | 21,304.00 | 6,600.00 | 13,200.00 | 6,400.00 | 12,800.00 | 3,700.00 | 7,400.00 |
| 0036 | 702-03-00100 | Catch Basins (CB-01) | 19 | EACH | 2,650.00 | 50,350.00 | 3,850.00 | 73,150.00 | 3,700.00 | 70,300.00 | 2,200.00 | 41,800.00 |
| 0037 | 702-03-00200 | Catch Basins (CB-02) | 8 | EACH | 4,700.00 | 37,600.00 | 7,150.00 | 57,200.00 | 6,600.00 | 52,800.00 | 3,200.00 | 25,600.00 |
| 0038 | 702-08-00100 | Side Drain Safety End (Type I) | 11 | EACH | 1,200.00 | 13,200.00 | 1,870.00 | 20,570.00 | 1,800.00 | 19,800.00 | 1,200.00 | 13,200.00 |
| 0039 | 702-08-00200 | Side Drain Safety End (Type 2) | 3 | EACH | 3,700.00 | 11,100.00 | 4,400.00 | 13,200.00 | 4,200.00 | 12,600.00 | 3,200.00 | 9,600.00 |
| 0040 | 702-08-00300 | Side Drain Safety End (Type 3) | 1 | EACH | 5,500.00 | 5,500.00 | 4,675.00 | 4,675.00 | 4,500.00 | 4,500.00 | 4,200.00 | 4,200.00 |
| 0041 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 280 | LNFT | 38.50 | 10,780.00 | 27.50 | 7,700.00 | 26.00 | 7,280.00 | 26.00 | 7,280.00 |
| 0042 | 704-03-00100 | Blocked Out Guard Rail | 787.5 | LNFT | 20.00 | 15,750.00 | 16.50 | 12,993.75 | 16.00 | 12,600.00 | 16.00 | 12,600.00 |
| 0043 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 96 | LNFT | 38.00 | 3,648.00 | 27.50 | 2,640.00 | 26.00 | 2,496.00 | 26.00 | 2,496.00 |
| 0044 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 65.00 | 13,000.00 | 71.50 | 14,300.00 | 69.00 | 13,800.00 | 70.00 | 14,000.00 |
| 0045 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,180.00 | 8,720.00 | 1,925.00 | 7,700.00 | 1,800.00 | 7,200.00 | 1,900.00 | 7,600.00 |
| 0046 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,400.00 | 9,600.00 | 2,200.00 | 8,800.00 | 2,100.00 | 8,400.00 | 2,100.00 | 8,400.00 |
| 0047 | 706-02-00200 | Concrete Drive (6" Thick) | 620 | SQYD | 43.00 | 26,660.00 | 66.00 | 40,920.00 | 64.00 | 39,680.00 | 60.00 | 37,200.00 |
| 0048 | 707-01-00100 | Concrete Curb | 144 | LNFT | 10.00 | 1,440.00 | 22.00 | 3,168.00 | 21.00 | 3,024.00 | 60.00 | 8,640.00 |
| 0049 | 707-03-00100 | Combination Concrete Curb and Gutter | 135 | LNFT | 25.00 | 3,375.00 | 44.00 | 5,940.00 | 42.00 | 5,670.00 | 63.00 | 8,505.00 |
| 0050 | 712-02-00100 | Sacked Concrete Revetment | 14 | SQYD | 100.00 | 1,400.00 | 126.50 | 1,771.00 | 120.00 | 1,680.00 | 180.00 | 2,520.00 |
| 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0052 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,050 | LNFT | 0.50 | 1,025.00 | 0.25 | 512.50 | 0.45 | 922.50 | 0.25 | 512.50 |
| 0053 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 432 | LNFT | 1.10 | 475.20 | 0.85 | 367.20 | 1.00 | 432.00 | 1.00 | 432.00 |
| 0054 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.01 | MILE | 625.00 | 11,256.25 | 385.00 | 6,933.85 | 145.00 | 2,611.45 | 215.00 | 3,872.15 |
| 0055 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.246 | MILE | 4,360.00 | 1,072.56 | 2,236.00 | 550.06 | 4,200.00 | 1,033.20 | 500.00 | 123.00 |
| 0056 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.793 | MILE | 275.00 | 1,868.08 | 440.00 | 2,988.92 | 265.00 | 1,800.15 | 438.00 | 2,975.33 |
| 0057 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.473 | MILE | 550.00 | 19,510.15 | 550.00 | 19,510.15 | 530.00 | 18,800.69 | 500.00 | 17,736.50 |
| 0058 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 32 | EACH | 55.00 | 1,760.00 | 49.50 | 1,584.00 | 52.00 | 1,664.00 | 50.00 | 1,600.00 |
| 0059 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 55.00 | 110.00 | 60.50 | 121.00 | 52.00 | 104.00 | 60.00 | 120.00 |
| 0060 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 32 | EACH | 55.00 | 1,760.00 | 49.50 | 1,584.00 | 52.00 | 1,664.00 | 50.00 | 1,600.00 |
| 0061 | 722-02-00100 | Project Site Laboratory (Equipped) | 2 | EACH | 5,000.00 | 10,000.00 | 8,800.00 | 17,600.00 | 12,000.00 | 24,000.00 | 3,700.00 | 7,400.00 |
| 0062 | 726-01-00100 | Bedding Material | 814 | CUYD | 100.00 | 81,400.00 | 94.00 | 76,516.00 | 90.00 | 73,260.00 | 95.00 | 77,330.00 |
| 0063 | 727-01-00100 | Mobilization | 1 | LUMP | 112,845.00 | 112,845.00 | 57,000.00 | 57,000.00 | 49,600.00 | 49,600.00 | 150,000.00 | 150,000.00 |
| 0064 | 729-01-00100 | Sign (Type A) | 10 | SQFT | 33.00 | 330.00 | 148.50 | 1,485.00 | 58.00 | 580.00 | 145.00 | 1,450.00 |
| 0065 | 729-16-00200 | Object Marker Assembly (Type 2) | 23 | EACH | 71.00 | 1,633.00 | 49.50 | 1,138.50 | 47.00 | 1,081.00 | 50.00 | 1,150.00 |
| 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,336 | EACH | 5.20 | 17,347.20 | 5.80 | 19,348.80 | 5.00 | 16,680.00 | 5.75 | 19,182.00 |
| 0067 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,025 | LNFT | 1.10 | 1,127.50 | 1.50 | 1,537.50 | 1.00 | 1,025.00 | 1.45 | 1,486.25 |
| 0068 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,478 | LNFT | 3.30 | 4,877.40 | 5.00 | 7,390.00 | 3.20 | 4,729.60 | 5.00 | 7,390.00 |
| 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 216 | LNFT | 3.30 | 712.80 | 5.00 | 1,080.00 | 3.20 | 691.20 | 5.00 | 1,080.00 |
| 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.736 | MILE | 2,725.00 | 48,330.60 | 2,800.00 | 49,660.80 | 2,600.00 | 46,113.60 | 2,550.00 | 45,226.80 |
| 0071 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.52 | MILE | 875.00 | 3,080.00 | 935.00 | 3,291.20 | 850.00 | 2,992.00 | 900.00 | 3,168.00 |
| 0072 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 220.00 | 220.00 | 226.00 | 226.00 | 210.00 | 210.00 | 224.00 | 224.00 |
| 0073 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 220.00 | 220.00 | 270.00 | 270.00 | 210.00 | 210.00 | 265.00 | 265.00 |
| 0074 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 220.00 | 2,860.00 | 237.00 | 3,081.00 | 210.00 | 2,730.00 | 235.00 | 3,055.00 |
| 0075 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 220.00 | 440.00 | 237.00 | 474.00 | 210.00 | 420.00 | 235.00 | 470.00 |
| 0076 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 16 | EACH | 275.00 | 4,400.00 | 248.00 | 3,968.00 | 260.00 | 4,160.00 | 235.00 | 3,760.00 |
| 0077 | 735-01-00100 | Mailboxes | 104 | EACH | 2.00 | 208.00 | 2.50 | 260.00 | 2.00 | 208.00 | 10.00 | 1,040.00 |
| 0078 | 735-02-00100 | Mailbox Supports (Single) | 83 | EACH | 110.00 | 9,130.00 | 119.00 | 9,877.00 | 105.00 | 8,715.00 | 100.00 | 8,300.00 |
| 0079 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 180.00 | 720.00 | 196.00 | 784.00 | 175.00 | 700.00 | 180.00 | 720.00 |
| 0080 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 305.00 | 610.00 | 333.00 | 666.00 | 290.00 | 580.00 | 300.00 | 600.00 |
| 0081 | 736-04-03080 | Signal Support (30' Steel Strain Pole) | 1 | EACH | 8,750.00 | 8,750.00 | 8,850.00 | 8,850.00 | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 |
| 0082 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 1 | EACH | 940.00 | 940.00 | 950.00 | 950.00 | 1,000.00 | 1,000.00 | 940.00 | 940.00 |
| 0083 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,400.00 | 2,800.00 | 1,400.00 | 2,800.00 | 1,400.00 | 2,800.00 | 1,300.00 | 2,600.00 |
| 0084 | 736-06-00100 | Signal Service | 1 | EACH | 1,025.00 | 1,025.00 | 1,050.00 | 1,050.00 | 1,700.00 | 1,700.00 | 1,000.00 | 1,000.00 |
| 0085 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 13,200.00 | 13,200.00 | 23,000.00 | 23,000.00 | 15,000.00 | 15,000.00 |
| 0086 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 62 | TON | 120.00 | 7,440.00 | 88.00 | 5,456.00 | 100.00 | 6,200.00 | 130.00 | 8,060.00 |
| 0087 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,993 | INLF | 1.40 | 5,590.20 | 2.20 | 8,784.60 | 1.25 | 4,991.25 | 1.20 | 4,791.60 |
| 0088 | NS-MSC-00120 | Drainage Structure (MH-12.5 x 9 Manhole with maximum dimension of 12'-6" x 9'-0" and maximum depth of 10') | 1 | EACH | 22,000.00 | 22,000.00 | 7,150.00 | 7,150.00 | 6,900.00 | 6,900.00 | 7,500.00 | 7,500.00 |
| 0089 | NS-MSC-00120 | Drainage Structure (MH-16.3 x 14 Manhole with maximum dimension of 16'-4" x 14'-0" and maximum depth of 9') | 1 | EACH | 25,200.00 | 25,200.00 | 7,425.00 | 7,425.00 | 7,200.00 | 7,200.00 | 7,500.00 | 7,500.00 |
| CONTRACTOR TOTAL | 4,413,290.54 | 4,668,774.49 | 4,698,103.58 | 4,872,516.81 | ||||||||