LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 713-59-0221
Parish: Washington
Routes:
Description: NOBLE CEMETERY ROAD BRIDGE OVER THOMAS CREEK
Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK
Estimated Construction Cost: $1,342,283.50


RankLicenseBidderConstruction Bid
1 55519 Key, LLC Of Mississippi $1,199,108.60
2 39462 Jb James Construction Llc $1,212,132.00
3 34567 James Construction Group LLC $1,271,537.10
4 00481 Coastal Bridge Co., L.L.C. $1,329,792.90
5 00044 Guinn Construction, LLC $1,436,298.20
6 36827 Shavers-Whittle Construction LLC $1,533,054.40
7 02179 Boh Bros. Construction Co., LLC. $1,923,051.20


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Key, LLC Of Mississippi
- 2 -
Jb James Construction Llc
- 3 -
James Construction Group LLC
- 4 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 12,500.00 12,500.00 50,000.00 50,000.00 20,000.00 20,000.00 20,000.00 20,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 6,500.00 6,500.00
0003 202-02-04000 Removal of Bridge (STA 105+42.43;25' X 90' TIMBER BRIDGE) 1      EACH 5,000.00 5,000.00 15,000.00 15,000.00 7,500.00 7,500.00 25,000.00 25,000.00
0004 202-02-04000 Removal of Bridge (STA 105+41.04;25' X 80' TIMBER BRIDGE) (W/ SIDEWALK) 1      EACH 5,000.00 5,000.00 13,000.00 13,000.00 10,000.00 10,000.00 25,000.00 25,000.00
0005 202-02-06080 Removal of Concrete Combination Curb and Gutter 253.2    LNFT 11.00 2,785.20 4.00 1,012.80 6.00 1,519.20 4.00 1,012.80
0006 203-05-00100 Excavation and Embankment 1      LUMP 70,000.00 70,000.00 55,000.00 55,000.00 40,000.00 40,000.00 60,000.00 60,000.00
0007 204-02-00100 Temporary Hay or Straw Bales 50      EACH 13.00 650.00 12.00 600.00 20.00 1,000.00 15.00 750.00
0008 204-03-00100 Temporary Slope Drains 316      LNFT 13.50 4,266.00 10.00 3,160.00 20.00 6,320.00 7.50 2,370.00
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 8      EACH 100.00 800.00 100.00 800.00 125.00 1,000.00 115.00 920.00
0010 204-06-00100 Temporary Silt Fencing 2,200      LNFT 3.75 8,250.00 2.30 5,060.00 2.10 4,620.00 2.00 4,400.00
0011 302-01-00100 Class II Base Course 454.5    CUYD 95.00 43,177.50 90.00 40,905.00 80.00 36,360.00 115.00 52,267.50
0012 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 170.9    CUYD 105.00 17,944.50 90.00 15,381.00 85.00 14,526.50 120.00 20,508.00
0013 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 30      CUYD 105.00 3,150.00 100.00 3,000.00 90.00 2,700.00 115.00 3,450.00
0014 502-01-00100 Superpave Asphaltic Concrete 491.4    TON 136.00 66,830.40 140.00 68,796.00 136.00 66,830.40 155.00 76,167.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 4.6    TON 300.00 1,380.00 300.00 1,380.00 300.00 1,380.00 345.00 1,587.00
0016 701-03-01000 Storm Drain Pipe (15" RCP/PP) 147      LNFT 41.00 6,027.00 56.00 8,232.00 60.00 8,820.00 45.00 6,615.00
0017 701-03-01040 Storm Drain Pipe (24" RCP/PP) 96      LNFT 56.00 5,376.00 60.00 5,760.00 78.00 7,488.00 55.00 5,280.00
0018 701-03-01080 Storm Drain Pipe (36" RCP/PP) 113      LNFT 93.00 10,509.00 85.00 9,605.00 120.00 13,560.00 85.00 9,605.00
0019 701-03-02060 Storm Drain Pipe (Outfall) (30" PP or 36" CMP) 76      LNFT 77.00 5,852.00 74.00 5,624.00 105.00 7,980.00 70.00 5,320.00
0020 701-03-02080 Storm Drain Pipe (Outfall) (36" PP or 42" CMP) 62      LNFT 97.00 6,014.00 82.00 5,084.00 150.00 9,300.00 82.00 5,084.00
0021 702-02-00200 Manholes (R-CB-11) 4      EACH 4,000.00 16,000.00 3,500.00 14,000.00 6,500.00 26,000.00 4,500.00 18,000.00
0022 702-03-00500 Catch Basins (CB-06) 7      EACH 3,500.00 24,500.00 3,600.00 25,200.00 4,000.00 28,000.00 4,700.00 32,900.00
0023 702-04-00200 Adjusting Catch Basins 2      EACH 1,500.00 3,000.00 1,200.00 2,400.00 1,500.00 3,000.00 3,000.00 6,000.00
0024 704-03-00100 Blocked Out Guard Rail 50      LNFT 18.00 900.00 18.00 900.00 18.00 900.00 20.00 1,000.00
0025 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 65.00 6,500.00 65.00 6,500.00 60.00 6,000.00 75.00 7,500.00
0026 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 1,900.00 7,600.00 2,000.00 8,000.00 2,100.00 8,400.00 2,200.00 8,800.00
0027 706-01-00100 Concrete Walk (4" Thick) 58.1    SQYD 95.00 5,519.50 52.00 3,021.20 80.00 4,648.00 100.00 5,810.00
0028 707-03-00100 Combination Concrete Curb and Gutter 642.9    LNFT 35.00 22,501.50 30.00 19,287.00 30.00 19,287.00 23.00 14,786.70
0029 711-01-03000 Riprap (30 lb, 14" Thick) 647      SQYD 60.00 38,820.00 58.00 37,526.00 80.00 51,760.00 56.00 36,232.00
0030 711-04-00100 Geotextile Fabric 647      SQYD 4.00 2,588.00 2.00 1,294.00 2.00 1,294.00 2.00 1,294.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 20,000.00 20,000.00 20,000.00 20,000.00 10,000.00 10,000.00 25,000.00 25,000.00
0032 716-01-00100 Mulch (Vegetative) 2.2    TON 990.00 2,178.00 1,000.00 2,200.00 990.00 2,178.00 1,150.00 2,530.00
0033 717-01-00100 Seeding 50      LB 15.00 750.00 15.00 750.00 15.00 750.00 17.25 862.50
0034 718-01-00100 Fertilizer 1,110      LB 0.80 888.00 1.00 1,110.00 0.80 888.00 0.90 999.00
0035 726-01-00100 Bedding Material 67.2    CUYD 75.00 5,040.00 80.00 5,376.00 75.00 5,040.00 165.00 11,088.00
0036 727-01-00100 Mobilization 1      LUMP 84,000.00 84,000.00 120,000.00 120,000.00 125,000.00 125,000.00 125,000.00 125,000.00
0037 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 65.00 520.00 70.00 560.00 80.00 640.00 75.00 600.00
0038 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 0.276  MILE 7,000.00 1,932.00 8,000.00 2,208.00 8,000.00 2,208.00 9,400.00 2,594.40
0039 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00 20,000.00 20,000.00 10,000.00 10,000.00 30,000.00 30,000.00
0040 804-01-00200 Precast Concrete Piles (14") 2,688      LNFT 60.00 161,280.00 55.50 149,184.00 64.00 172,032.00 54.00 145,152.00
0041 804-12-00100 Loading Permanent Piles 2      EACH 7,500.00 15,000.00 100.00 200.00 4,000.00 8,000.00 100.00 200.00
0042 805-10-00100 Bridge Superstructure and Substructure (32' RDWY, 90 DEG CROSSING) (CURVED, CAST-IN-PLACE) 5      SPAN 35,000.00 175,000.00 39,000.00 195,000.00 43,000.00 215,000.00 45,000.00 225,000.00
0043 805-10-00100 Bridge Superstructure and Substructure (28' RDWY, 90 DEG CROSSING) (SIDEWALK, CAST-IN-PLACE) 5      SPAN 37,000.00 185,000.00 45,000.00 225,000.00 50,000.00 250,000.00 50,000.00 250,000.00
0044 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 608      INLF 10.00 6,080.00 2.00 1,216.00 1.00 608.00 1.00 608.00
0045 NS-800-00040 Concrete Approach Slabs (32' RDWY, 90 DEG CROSSING) (CURVED, WITHOUT ASPHALT) 2      EACH 15,500.00 31,000.00 8,000.00 16,000.00 10,000.00 20,000.00 10,000.00 20,000.00
0046 NS-800-00040 Concrete Approach Slabs (28' RDWY, 90 DEG CROSSING) (TAPERED BARRIER RAIL, WITHOUT ASPHALT) 2      EACH 17,000.00 34,000.00 9,000.00 18,000.00 11,000.00 22,000.00 10,000.00 20,000.00
0047 NS-804-00001 Vibration Monitoring 24      EACH 750.00 18,000.00 200.00 4,800.00 500.00 12,000.00 250.00 6,000.00
                         
    CONTRACTOR TOTAL       1,199,108.60   1,212,132.00   1,271,537.10   1,329,792.90



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Guinn Construction, LLC
- 6 -
Shavers-Whittle Construction LLC
- 7 -
Boh Bros. Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 28,500.00 28,500.00 45,000.00 45,000.00 25,000.00 25,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 6,000.00 6,000.00 1,500.00 1,500.00 7,500.00 7,500.00
0003 202-02-04000 Removal of Bridge (STA 105+42.43;25' X 90' TIMBER BRIDGE) 1      EACH 12,000.00 12,000.00 20,000.00 20,000.00 33,000.00 33,000.00
0004 202-02-04000 Removal of Bridge (STA 105+41.04;25' X 80' TIMBER BRIDGE) (W/ SIDEWALK) 1      EACH 13,500.00 13,500.00 25,000.00 25,000.00 33,000.00 33,000.00
0005 202-02-06080 Removal of Concrete Combination Curb and Gutter 253.2    LNFT 16.00 4,051.20 12.00 3,038.40 14.00 3,544.80
0006 203-05-00100 Excavation and Embankment 1      LUMP 130,000.00 130,000.00 100,000.00 100,000.00 130,000.00 130,000.00
0007 204-02-00100 Temporary Hay or Straw Bales 50      EACH 10.00 500.00 14.00 700.00 12.00 600.00
0008 204-03-00100 Temporary Slope Drains 316      LNFT 0.00 0.00 45.00 14,220.00 45.00 14,220.00
0009 204-05-00100 Temporary Sediment Check Dams (Hay) 8      EACH 100.00 800.00 200.00 1,600.00 190.00 1,520.00
0010 204-06-00100 Temporary Silt Fencing 2,200      LNFT 2.00 4,400.00 2.00 4,400.00 2.25 4,950.00
0011 302-01-00100 Class II Base Course 454.5    CUYD 85.00 38,632.50 95.00 43,177.50 100.00 45,450.00
0012 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 170.9    CUYD 85.00 14,526.50 95.00 16,235.50 100.00 17,090.00
0013 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 30      CUYD 100.00 3,000.00 45.00 1,350.00 45.00 1,350.00
0014 502-01-00100 Superpave Asphaltic Concrete 491.4    TON 225.00 110,565.00 136.00 66,830.40 175.00 85,995.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 4.6    TON 375.00 1,725.00 300.00 1,380.00 175.00 805.00
0016 701-03-01000 Storm Drain Pipe (15" RCP/PP) 147      LNFT 30.00 4,410.00 80.00 11,760.00 66.00 9,702.00
0017 701-03-01040 Storm Drain Pipe (24" RCP/PP) 96      LNFT 85.00 8,160.00 100.00 9,600.00 85.00 8,160.00
0018 701-03-01080 Storm Drain Pipe (36" RCP/PP) 113      LNFT 140.00 15,820.00 145.00 16,385.00 120.00 13,560.00
0019 701-03-02060 Storm Drain Pipe (Outfall) (30" PP or 36" CMP) 76      LNFT 100.00 7,600.00 138.00 10,488.00 115.00 8,740.00
0020 701-03-02080 Storm Drain Pipe (Outfall) (36" PP or 42" CMP) 62      LNFT 140.00 8,680.00 200.00 12,400.00 164.00 10,168.00
0021 702-02-00200 Manholes (R-CB-11) 4      EACH 4,000.00 16,000.00 8,500.00 34,000.00 7,000.00 28,000.00
0022 702-03-00500 Catch Basins (CB-06) 7      EACH 3,500.00 24,500.00 5,200.00 36,400.00 4,500.00 31,500.00
0023 702-04-00200 Adjusting Catch Basins 2      EACH 2,000.00 4,000.00 1,900.00 3,800.00 1,650.00 3,300.00
0024 704-03-00100 Blocked Out Guard Rail 50      LNFT 25.00 1,250.00 28.00 1,400.00 55.00 2,750.00
0025 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 75.00 7,500.00 80.00 8,000.00 110.00 11,000.00
0026 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,500.00 10,000.00 3,200.00 12,800.00 2,300.00 9,200.00
0027 706-01-00100 Concrete Walk (4" Thick) 58.1    SQYD 100.00 5,810.00 100.00 5,810.00 105.00 6,100.50
0028 707-03-00100 Combination Concrete Curb and Gutter 642.9    LNFT 40.00 25,716.00 19.00 12,215.10 45.00 28,930.50
0029 711-01-03000 Riprap (30 lb, 14" Thick) 647      SQYD 75.00 48,525.00 70.00 45,290.00 85.00 54,995.00
0030 711-04-00100 Geotextile Fabric 647      SQYD 5.00 3,235.00 3.50 2,264.50 5.00 3,235.00
0031 713-01-00100 Temporary Signs and Barricades 1      LUMP 22,000.00 22,000.00 15,000.00 15,000.00 45,000.00 45,000.00
0032 716-01-00100 Mulch (Vegetative) 2.2    TON 1,500.00 3,300.00 1,000.00 2,200.00 1,000.00 2,200.00
0033 717-01-00100 Seeding 50      LB 20.00 1,000.00 18.00 900.00 18.00 900.00
0034 718-01-00100 Fertilizer 1,110      LB 1.00 1,110.00 1.00 1,110.00 0.90 999.00
0035 726-01-00100 Bedding Material 67.2    CUYD 100.00 6,720.00 80.00 5,376.00 82.00 5,510.40
0036 727-01-00100 Mobilization 1      LUMP 125,000.00 125,000.00 120,000.00 120,000.00 190,000.00 190,000.00
0037 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 100.00 800.00 90.00 720.00 85.00 680.00
0038 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 0.276  MILE 10,000.00 2,760.00 8,000.00 2,208.00 11,000.00 3,036.00
0039 740-01-00100 Construction Layout 1      LUMP 20,000.00 20,000.00 25,000.00 25,000.00 25,000.00 25,000.00
0040 804-01-00200 Precast Concrete Piles (14") 2,688      LNFT 60.00 161,280.00 60.00 161,280.00 67.50 181,440.00
0041 804-12-00100 Loading Permanent Piles 2      EACH 1.00 2.00 12,000.00 24,000.00 500.00 1,000.00
0042 805-10-00100 Bridge Superstructure and Substructure (32' RDWY, 90 DEG CROSSING) (CURVED, CAST-IN-PLACE) 5      SPAN 42,000.00 210,000.00 50,000.00 250,000.00 70,000.00 350,000.00
0043 805-10-00100 Bridge Superstructure and Substructure (28' RDWY, 90 DEG CROSSING) (SIDEWALK, CAST-IN-PLACE) 5      SPAN 50,000.00 250,000.00 60,000.00 300,000.00 80,000.00 400,000.00
0044 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 608      INLF 2.50 1,520.00 2.00 1,216.00 2.50 1,520.00
0045 NS-800-00040 Concrete Approach Slabs (32' RDWY, 90 DEG CROSSING) (CURVED, WITHOUT ASPHALT) 2      EACH 13,000.00 26,000.00 8,500.00 17,000.00 18,000.00 36,000.00
0046 NS-800-00040 Concrete Approach Slabs (28' RDWY, 90 DEG CROSSING) (TAPERED BARRIER RAIL, WITHOUT ASPHALT) 2      EACH 15,500.00 31,000.00 11,000.00 22,000.00 19,000.00 38,000.00
0047 NS-804-00001 Vibration Monitoring 24      EACH 600.00 14,400.00 750.00 18,000.00 350.00 8,400.00
                     
    CONTRACTOR TOTAL       1,436,298.20   1,533,054.40   1,923,051.20
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.