Bid Tabulations
Letting of
04/28/2010
LA DOTD Headquarters
| Lead Project: 713-57-0126 | |
| Parish: Vermilion | |
| Routes: | |
| Description: DENNIS ROAD BRIDGE | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AGGREGATE SURFACING AND RELATED WORK. | |
| Estimated Construction Cost: $549,770.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 25088 | RCS Contractors, Inc. | $411,494.16 |
| 2 | 09090 | Guinn Brothers, LLC. | $454,060.00 |
| 3 | 51821 | Elliott Construction, LLC | $456,953.35 |
| 4 | 01012 | Cecil D. Gassiott, LLC | $470,256.00 |
| 5 | 43371 | RMD Holdings Ltd | $479,929.05 |
| 6 | 40312 | Gray Construction Corp. | $481,164.25 |
| 7 | 12198 | Byron E. Talbot Contractor, Inc. | $516,680.36 |
| 8 | 52306 | Cecil Perry Improvements Llc | $519,140.00 |
| 9 | 13086 | M. Matt Durand, LLC | $599,802.08 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - RCS Contractors, Inc. |
- 2 - Guinn Brothers, LLC. |
- 3 - Elliott Construction, LLC |
- 4 - Cecil D. Gassiott, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,000.00 | 2,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X22.37' TIMBER BRIDGE) | 1 | EACH | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 8,000.00 | 8,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X20.51' TIMBER BRIDGE) | 1 | EACH | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 5,500.00 | 5,500.00 | 6,500.00 | 6,500.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 13,000.00 | 13,000.00 | 24,000.00 | 24,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 48 | EACH | 16.50 | 792.00 | 10.00 | 480.00 | 50.00 | 2,400.00 | 20.00 | 960.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 165.00 | 1,320.00 | 100.00 | 800.00 | 140.00 | 1,120.00 | 300.00 | 2,400.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 980 | LNFT | 2.25 | 2,205.00 | 3.00 | 2,940.00 | 2.00 | 1,960.00 | 3.00 | 2,940.00 |
| 0008 | 302-01-00100 | Class II Base Course | 46.6 | CUYD | 119.50 | 5,568.70 | 100.00 | 4,660.00 | 159.00 | 7,409.40 | 130.00 | 6,058.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9.2 | CUYD | 119.50 | 1,099.40 | 150.00 | 1,380.00 | 182.00 | 1,674.40 | 135.00 | 1,242.00 |
| 0010 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 106.2 | CUYD | 54.50 | 5,787.90 | 100.00 | 10,620.00 | 110.00 | 11,682.00 | 100.00 | 10,620.00 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 37.8 | TON | 200.00 | 7,560.00 | 250.00 | 9,450.00 | 275.00 | 10,395.00 | 500.00 | 18,900.00 |
| 0012 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 400 | LNFT | 25.00 | 10,000.00 | 36.00 | 14,400.00 | 48.00 | 19,200.00 | 65.00 | 26,000.00 |
| 0013 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 36.00 | 2,880.00 | 75.00 | 6,000.00 | 59.00 | 4,720.00 | 85.00 | 6,800.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,500.00 | 6,500.00 | 12,000.00 | 12,000.00 | 22,250.00 | 22,250.00 | 7,500.00 | 7,500.00 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 1,980.00 | 2,376.00 | 1,250.00 | 1,500.00 | 550.00 | 660.00 | 2,000.00 | 2,400.00 |
| 0016 | 717-01-00100 | Seeding | 27 | LB | 11.00 | 297.00 | 15.00 | 405.00 | 8.00 | 216.00 | 25.00 | 675.00 |
| 0017 | 718-01-00100 | Fertilizer | 600 | LB | 2.20 | 1,320.00 | 1.00 | 600.00 | 1.00 | 600.00 | 2.00 | 1,200.00 |
| 0018 | 726-01-00100 | Bedding Material | 135 | CUYD | 80.00 | 10,800.00 | 100.00 | 13,500.00 | 132.00 | 17,820.00 | 95.00 | 12,825.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 19,000.00 | 19,000.00 | 28,000.00 | 28,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 |
| 0020 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 75.00 | 600.00 | 100.00 | 800.00 | 145.00 | 1,160.00 | 95.00 | 760.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,500.00 | 5,500.00 | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 |
| 0022 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 68.09 | CUYD | 1,450.00 | 98,730.50 | 1,250.00 | 85,112.50 | 820.00 | 55,833.80 | 1,400.00 | 95,326.00 |
| 0023 | 805-12-02060 | Reinforced Concrete Box Culverts (8' x 5') | 138 | LNFT | 687.53 | 94,879.14 | 750.00 | 103,500.00 | 770.00 | 106,260.00 | 650.00 | 89,700.00 |
| 0024 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 126 | LNFT | 878.52 | 110,693.52 | 825.00 | 103,950.00 | 795.00 | 100,170.00 | 780.00 | 98,280.00 |
| 0025 | 806-01-00100 | Deformed Reinforcing Steel | 5,585 | LB | 1.00 | 5,585.00 | 2.50 | 13,962.50 | 1.15 | 6,422.75 | 2.00 | 11,170.00 |
| CONTRACTOR TOTAL | 411,494.16 | 454,060.00 | 456,953.35 | 470,256.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - RMD Holdings Ltd |
- 6 - Gray Construction Corp. |
- 7 - Byron E. Talbot Contractor, Inc. |
- 8 - Cecil Perry Improvements Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,516.20 | 4,516.20 | 7,100.00 | 7,100.00 | 5,000.00 | 5,000.00 | 12,050.00 | 12,050.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X22.37' TIMBER BRIDGE) | 1 | EACH | 7,148.70 | 7,148.70 | 5,100.00 | 5,100.00 | 3,800.00 | 3,800.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X20.51' TIMBER BRIDGE) | 1 | EACH | 7,148.70 | 7,148.70 | 5,100.00 | 5,100.00 | 3,800.00 | 3,800.00 | 5,690.00 | 5,690.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 37,124.10 | 37,124.10 | 56,000.00 | 56,000.00 | 40,000.00 | 40,000.00 | 51,300.00 | 51,300.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 48 | EACH | 15.30 | 734.57 | 15.00 | 720.00 | 8.75 | 420.00 | 25.00 | 1,200.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 107.15 | 857.19 | 150.00 | 1,200.00 | 185.00 | 1,480.00 | 71.00 | 568.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 980 | LNFT | 2.57 | 2,522.52 | 2.10 | 2,058.00 | 3.50 | 3,430.00 | 1.65 | 1,617.00 |
| 0008 | 302-01-00100 | Class II Base Course | 46.6 | CUYD | 103.00 | 4,799.57 | 150.00 | 6,990.00 | 95.00 | 4,427.00 | 170.00 | 7,922.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9.2 | CUYD | 113.85 | 1,047.44 | 158.00 | 1,453.60 | 74.65 | 686.78 | 112.00 | 1,030.40 |
| 0010 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 106.2 | CUYD | 103.00 | 10,938.08 | 129.00 | 13,699.80 | 74.65 | 7,927.83 | 84.00 | 8,920.80 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 37.8 | TON | 510.12 | 19,282.54 | 260.00 | 9,828.00 | 200.00 | 7,560.00 | 265.00 | 10,017.00 |
| 0012 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 400 | LNFT | 57.92 | 23,166.00 | 69.40 | 27,760.00 | 40.00 | 16,000.00 | 87.64 | 35,056.00 |
| 0013 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 83.08 | 6,646.54 | 72.98 | 5,838.40 | 53.00 | 4,240.00 | 91.50 | 7,320.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,764.00 | 10,764.00 | 10,300.00 | 10,300.00 | 21,000.00 | 21,000.00 | 28,112.00 | 28,112.00 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 2,925.00 | 3,510.00 | 1,800.00 | 2,160.00 | 2,650.00 | 3,180.00 | 2,264.50 | 2,717.40 |
| 0016 | 717-01-00100 | Seeding | 27 | LB | 29.25 | 789.75 | 10.00 | 270.00 | 75.00 | 2,025.00 | 13.00 | 351.00 |
| 0017 | 718-01-00100 | Fertilizer | 600 | LB | 1.17 | 702.00 | 2.00 | 1,200.00 | 2.10 | 1,260.00 | 2.52 | 1,512.00 |
| 0018 | 726-01-00100 | Bedding Material | 135 | CUYD | 100.60 | 13,580.54 | 132.00 | 17,820.00 | 100.00 | 13,500.00 | 241.00 | 32,535.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 64,736.10 | 64,736.10 | 50,600.00 | 50,600.00 | 25,000.00 | 25,000.00 | 5,400.00 | 5,400.00 |
| 0020 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 115.65 | 925.24 | 126.00 | 1,008.00 | 100.00 | 800.00 | 116.00 | 928.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,316.00 | 17,316.00 | 4,700.00 | 4,700.00 | 6,000.00 | 6,000.00 | 6,752.15 | 6,752.15 |
| 0022 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 68.09 | CUYD | 745.65 | 50,771.49 | 880.00 | 59,919.20 | 1,225.00 | 83,410.25 | 1,400.00 | 95,326.00 |
| 0023 | 805-12-02060 | Reinforced Concrete Box Culverts (8' x 5') | 138 | LNFT | 648.33 | 89,469.83 | 785.00 | 108,330.00 | 1,090.00 | 150,420.00 | 629.00 | 86,802.00 |
| 0024 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 126 | LNFT | 722.56 | 91,042.17 | 560.00 | 70,560.00 | 830.25 | 104,611.50 | 737.00 | 92,862.00 |
| 0025 | 806-01-00100 | Deformed Reinforcing Steel | 5,585 | LB | 1.86 | 10,389.78 | 2.05 | 11,449.25 | 1.20 | 6,702.00 | 3.25 | 18,151.25 |
| CONTRACTOR TOTAL | 479,929.05 | 481,164.25 | 516,680.36 | 519,140.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - M. Matt Durand, LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 8,675.00 | 8,675.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X22.37' TIMBER BRIDGE) | 1 | EACH | 5,005.00 | 5,005.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA100+00; 20'X20.51' TIMBER BRIDGE) | 1 | EACH | 5,005.00 | 5,005.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,400.00 | 20,400.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 48 | EACH | 18.00 | 864.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 180.00 | 1,440.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 980 | LNFT | 2.50 | 2,450.00 |
| 0008 | 302-01-00100 | Class II Base Course | 46.6 | CUYD | 128.00 | 5,964.80 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 9.2 | CUYD | 171.00 | 1,573.20 |
| 0010 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 106.2 | CUYD | 91.00 | 9,664.20 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 37.8 | TON | 267.00 | 10,092.60 |
| 0012 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 400 | LNFT | 57.00 | 22,800.00 |
| 0013 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 78.00 | 6,240.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,500.00 | 15,500.00 |
| 0015 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 2,200.00 | 2,640.00 |
| 0016 | 717-01-00100 | Seeding | 27 | LB | 12.00 | 324.00 |
| 0017 | 718-01-00100 | Fertilizer | 600 | LB | 2.50 | 1,500.00 |
| 0018 | 726-01-00100 | Bedding Material | 135 | CUYD | 131.00 | 17,685.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 47,000.00 | 47,000.00 |
| 0020 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 92.00 | 736.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,300.00 | 8,300.00 |
| 0022 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 68.09 | CUYD | 992.00 | 67,545.28 |
| 0023 | 805-12-02060 | Reinforced Concrete Box Culverts (8' x 5') | 138 | LNFT | 1,145.00 | 158,010.00 |
| 0024 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 126 | LNFT | 1,343.00 | 169,218.00 |
| 0025 | 806-01-00100 | Deformed Reinforcing Steel | 5,585 | LB | 2.00 | 11,170.00 |
| CONTRACTOR TOTAL | 599,802.08 | |||||