Bid Tabulations
Letting of
10/27/2010
LA DOTD Headquarters
| Lead Project: 713-53-0121 | |
| Parish: Tangipahoa | |
| Routes: | |
| Description: MCELVEEN ROAD BRIDGE OVER HOPE BRANCH | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS AND RELATED WORK. | |
| Estimated Construction Cost: $467,236.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 25088 | RCS Contractors, Inc. | $381,909.50 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $399,914.11 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $413,432.30 |
| 4 | 09090 | Guinn Brothers, LLC. | $449,813.00 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $492,893.50 |
| 6 | 38610 | Three C's Properties Inc | $558,893.15 |
| 7 | 38325 | Great Southern Dredging Inc | $574,909.50 |
| 8 | 48896 | Command Construction Industries LLC | $747,874.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - RCS Contractors, Inc. |
- 2 - Richard Price Contracting Co, Llc |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Guinn Brothers, LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 26,960.00 | 26,960.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 7,500.00 | 7,500.00 | 5,500.00 | 5,500.00 | 4,000.00 | 4,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement (CORINGS INDICATED NO STABILIZED BASE IN THE EXISTING PAVEMENT SECTION) | 58 | SQYD | 10.00 | 580.00 | 25.00 | 1,450.00 | 9.50 | 551.00 | 10.00 | 580.00 |
| 0004 | 202-02-04000 | Removal of Bridge (STA 115+20; 19.8'X39.0' TIMBER BRIDGE) (W/ TIMBER RAILS) | 1 | EACH | 3,000.00 | 3,000.00 | 5,500.00 | 5,500.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (STA 215+19; 24.1'X39.0' TIMBER BRIDGE) (W/ TIMBER RAILS) | 1 | EACH | 3,000.00 | 3,000.00 | 5,500.00 | 5,500.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 |
| 0006 | 202-02-12000 | Removal of Fence | 180 | LNFT | 3.00 | 540.00 | 7.00 | 1,260.00 | 6.00 | 1,080.00 | 5.00 | 900.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 66 | SQYD | 5.00 | 330.00 | 25.00 | 1,650.00 | 9.50 | 627.00 | 10.00 | 660.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 26,500.00 | 26,500.00 | 14,000.00 | 14,000.00 | 1.00 | 1.00 | 30,000.00 | 30,000.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 7 | EACH | 20.00 | 140.00 | 75.00 | 525.00 | 25.00 | 175.00 | 10.00 | 70.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 200.00 | 1,200.00 | 220.00 | 1,320.00 | 225.00 | 1,350.00 | 100.00 | 600.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 800 | LNFT | 2.00 | 1,600.00 | 2.50 | 2,000.00 | 2.50 | 2,000.00 | 3.00 | 2,400.00 |
| 0012 | 302-01-00700 | Class II Base Course (Stone) | 66.1 | CUYD | 135.00 | 8,923.50 | 124.28 | 8,214.91 | 110.00 | 7,271.00 | 100.00 | 6,610.00 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 95.00 | 9,500.00 | 85.00 | 8,500.00 | 0.00 | 0.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 84.8 | TON | 250.00 | 21,200.00 | 370.00 | 31,376.00 | 192.50 | 16,324.00 | 330.00 | 27,984.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 3.8 | TON | 425.00 | 1,615.00 | 370.00 | 1,406.00 | 192.50 | 731.50 | 500.00 | 1,900.00 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 374 | SQYD | 0.50 | 187.00 | 26.00 | 9,724.00 | 33.00 | 12,342.00 | 38.00 | 14,212.00 |
| 0017 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 85 | LNFT | 50.00 | 4,250.00 | 64.75 | 5,503.75 | 55.00 | 4,675.00 | 90.00 | 7,650.00 |
| 0018 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 58 | LNFT | 70.00 | 4,060.00 | 104.00 | 6,032.00 | 85.00 | 4,930.00 | 175.00 | 10,150.00 |
| 0019 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,700.00 | 2,700.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 |
| 0020 | 705-01-00100 | Barbed Wire Fence | 150 | LNFT | 6.00 | 900.00 | 35.50 | 5,325.00 | 10.00 | 1,500.00 | 15.00 | 2,250.00 |
| 0021 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 387 | SQYD | 61.00 | 23,607.00 | 70.00 | 27,090.00 | 110.00 | 42,570.00 | 75.00 | 29,025.00 |
| 0022 | 711-04-00100 | Geotextile Fabric | 387 | SQYD | 1.00 | 387.00 | 2.50 | 967.50 | 1.50 | 580.50 | 5.00 | 1,935.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 111 | SQYD | 47.00 | 5,217.00 | 55.00 | 6,105.00 | 155.00 | 17,205.00 | 80.00 | 8,880.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 9,000.00 | 9,000.00 | 12,500.00 | 12,500.00 | 14,000.00 | 14,000.00 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 0.6 | TON | 4,400.00 | 2,640.00 | 2,400.00 | 1,440.00 | 2,200.00 | 1,320.00 | 2,000.00 | 1,200.00 |
| 0026 | 717-01-00100 | Seeding | 9 | LB | 33.00 | 297.00 | 35.75 | 321.75 | 33.00 | 297.00 | 15.00 | 135.00 |
| 0027 | 718-01-00100 | Fertilizer | 280 | LB | 5.00 | 1,400.00 | 2.40 | 672.00 | 2.25 | 630.00 | 1.00 | 280.00 |
| 0028 | 726-01-00100 | Bedding Material | 190 | CUYD | 40.00 | 7,600.00 | 61.00 | 11,590.00 | 45.00 | 8,550.00 | 85.00 | 16,150.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 17,560.00 | 17,560.00 | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 |
| 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 100.00 | 800.00 | 172.00 | 1,376.00 | 140.00 | 1,120.00 | 100.00 | 800.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 13,000.00 | 13,000.00 | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 |
| 0032 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 41.88 | CUYD | 1,250.00 | 52,350.00 | 700.00 | 29,316.00 | 1,380.00 | 57,794.40 | 1,250.00 | 52,350.00 |
| 0033 | 805-12-21000 | Reinforced Concrete Box Culverts (5' x 5') (Precast) | 152 | LNFT | 399.00 | 60,648.00 | 460.00 | 69,920.00 | 485.00 | 73,720.00 | 400.00 | 60,800.00 |
| 0034 | 805-12-21040 | Reinforced Concrete Box Culverts (7' x 5') (Precast) | 152 | LNFT | 541.00 | 82,232.00 | 457.00 | 69,464.00 | 550.00 | 83,600.00 | 600.00 | 91,200.00 |
| 0035 | 806-01-00100 | Deformed Reinforcing Steel | 3,346 | LB | 1.00 | 3,346.00 | 1.20 | 4,015.20 | 1.15 | 3,847.90 | 2.00 | 6,692.00 |
| 0036 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 140 | INLF | 1.00 | 140.00 | 2.50 | 350.00 | 1.00 | 140.00 | 10.00 | 1,400.00 |
| CONTRACTOR TOTAL | 381,909.50 | 399,914.11 | 413,432.30 | 449,813.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Boh Bros. Construction Co., LLC. |
- 6 - Three C's Properties Inc |
- 7 - Great Southern Dredging Inc |
- 8 - Command Construction Industries LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,000.00 | 7,000.00 | 10,680.00 | 10,680.00 | 7,500.00 | 7,500.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 |
| 0003 | 202-02-02020 | Removal of Asphalt Pavement (CORINGS INDICATED NO STABILIZED BASE IN THE EXISTING PAVEMENT SECTION) | 58 | SQYD | 9.00 | 522.00 | 68.50 | 3,973.00 | 60.00 | 3,480.00 | 25.00 | 1,450.00 |
| 0004 | 202-02-04000 | Removal of Bridge (STA 115+20; 19.8'X39.0' TIMBER BRIDGE) (W/ TIMBER RAILS) | 1 | EACH | 8,000.00 | 8,000.00 | 27,000.00 | 27,000.00 | 13,000.00 | 13,000.00 | 5,000.00 | 5,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge (STA 215+19; 24.1'X39.0' TIMBER BRIDGE) (W/ TIMBER RAILS) | 1 | EACH | 11,000.00 | 11,000.00 | 26,600.00 | 26,600.00 | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 |
| 0006 | 202-02-12000 | Removal of Fence | 180 | LNFT | 1.50 | 270.00 | 4.00 | 720.00 | 5.00 | 900.00 | 3.00 | 540.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 66 | SQYD | 8.00 | 528.00 | 35.75 | 2,359.50 | 70.00 | 4,620.00 | 25.00 | 1,650.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 17,000.00 | 17,000.00 | 46,000.00 | 46,000.00 | 25,000.00 | 25,000.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 7 | EACH | 28.00 | 196.00 | 50.00 | 350.00 | 50.00 | 350.00 | 30.00 | 210.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 280.00 | 1,680.00 | 171.00 | 1,026.00 | 75.00 | 450.00 | 250.00 | 1,500.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 800 | LNFT | 4.75 | 3,800.00 | 2.75 | 2,200.00 | 5.00 | 4,000.00 | 3.00 | 2,400.00 |
| 0012 | 302-01-00700 | Class II Base Course (Stone) | 66.1 | CUYD | 160.00 | 10,576.00 | 104.00 | 6,874.40 | 350.00 | 23,135.00 | 100.00 | 6,610.00 |
| 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 130.00 | 13,000.00 | 79.00 | 7,900.00 | 40.00 | 4,000.00 | 30.00 | 3,000.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 84.8 | TON | 300.00 | 25,440.00 | 195.00 | 16,536.00 | 350.00 | 29,680.00 | 300.00 | 25,440.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 3.8 | TON | 150.00 | 570.00 | 195.00 | 741.00 | 350.00 | 1,330.00 | 300.00 | 1,140.00 |
| 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 374 | SQYD | 15.00 | 5,610.00 | 10.75 | 4,020.50 | 30.00 | 11,220.00 | 15.00 | 5,610.00 |
| 0017 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 85 | LNFT | 55.00 | 4,675.00 | 77.00 | 6,545.00 | 185.00 | 15,725.00 | 90.00 | 7,650.00 |
| 0018 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 58 | LNFT | 65.00 | 3,770.00 | 119.70 | 6,942.60 | 315.00 | 18,270.00 | 125.00 | 7,250.00 |
| 0019 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,000.00 | 3,000.00 | 3,775.00 | 3,775.00 | 7,500.00 | 7,500.00 | 4,000.00 | 4,000.00 |
| 0020 | 705-01-00100 | Barbed Wire Fence | 150 | LNFT | 16.00 | 2,400.00 | 16.25 | 2,437.50 | 14.50 | 2,175.00 | 10.00 | 1,500.00 |
| 0021 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 387 | SQYD | 133.00 | 51,471.00 | 92.25 | 35,700.75 | 60.00 | 23,220.00 | 125.00 | 48,375.00 |
| 0022 | 711-04-00100 | Geotextile Fabric | 387 | SQYD | 1.50 | 580.50 | 3.00 | 1,161.00 | 15.00 | 5,805.00 | 1.00 | 387.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 111 | SQYD | 91.00 | 10,101.00 | 78.00 | 8,658.00 | 130.00 | 14,430.00 | 125.00 | 13,875.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 11,000.00 | 11,000.00 | 14,600.00 | 14,600.00 | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 |
| 0025 | 716-01-00100 | Mulch (Vegetative) | 0.6 | TON | 1,300.00 | 780.00 | 1,450.00 | 870.00 | 4,000.00 | 2,400.00 | 2,000.00 | 1,200.00 |
| 0026 | 717-01-00100 | Seeding | 9 | LB | 28.00 | 252.00 | 27.60 | 248.40 | 100.00 | 900.00 | 35.00 | 315.00 |
| 0027 | 718-01-00100 | Fertilizer | 280 | LB | 3.25 | 910.00 | 1.15 | 322.00 | 5.00 | 1,400.00 | 2.00 | 560.00 |
| 0028 | 726-01-00100 | Bedding Material | 190 | CUYD | 110.00 | 20,900.00 | 86.50 | 16,435.00 | 225.00 | 42,750.00 | 125.00 | 23,750.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 49,000.00 | 49,000.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 |
| 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 | 250.00 | 2,000.00 | 125.00 | 1,000.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,100.00 | 6,100.00 | 35,000.00 | 35,000.00 | 1,000.00 | 1,000.00 |
| 0032 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 41.88 | CUYD | 1,450.00 | 60,726.00 | 2,870.00 | 120,195.60 | 650.00 | 27,222.00 | 1,750.00 | 73,290.00 |
| 0033 | 805-12-21000 | Reinforced Concrete Box Culverts (5' x 5') (Precast) | 152 | LNFT | 380.00 | 57,760.00 | 425.00 | 64,600.00 | 500.00 | 76,000.00 | 1,300.00 | 197,600.00 |
| 0034 | 805-12-21040 | Reinforced Concrete Box Culverts (7' x 5') (Precast) | 152 | LNFT | 440.00 | 66,880.00 | 545.00 | 82,840.00 | 600.00 | 91,200.00 | 1,300.00 | 197,600.00 |
| 0035 | 806-01-00100 | Deformed Reinforcing Steel | 3,346 | LB | 1.00 | 3,346.00 | 1.65 | 5,520.90 | 3.75 | 12,547.50 | 2.00 | 6,692.00 |
| 0036 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 140 | INLF | 2.50 | 350.00 | 1.15 | 161.00 | 5.00 | 700.00 | 2.00 | 280.00 |
| CONTRACTOR TOTAL | 492,893.50 | 558,893.15 | 574,909.50 | 747,874.00 | ||||||||