LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 713-35-0118
Parish: Natchitoches
Routes:
Description: QUICK ROAD BRIDGE OVER DEMERY CREEK
Type Const: GRADING, PAVING, AND RELATED WORK
Estimated Construction Cost: $155,321.00


RankLicenseBidderConstruction Bid
1 40439 Ronald G. Carlson Inc. $86,837.90
2 51413 Iverstine & Campbell LLC $97,135.69
3 39580 Gerace Construction Llc $106,460.00
4 35849 T.L. Construction LLC $107,277.60
5 41947 M & M Enterprises of Bastrop, LLC $111,054.00
6 40615 Specialty Trackhoe & Dozer Serv.Inc $111,964.00
7 49239 W L Bass Construction Inc. $117,732.00
8 44289 Jeff Mercer LLC $124,385.00
9 45004 Bondco LLC $134,850.00
10 32044 Quality Design & Construction, LLC $144,148.00
11 36384 John Bailey, Inc. $149,768.00
12 12312 Gilchrist Construction Co. LLC $152,253.62
13 12135 Blount Bros. Construction, Inc. $153,592.00
14 18546 C W & W Contractors, Inc. $158,055.00
15 09090 Guinn Brothers, LLC. $158,437.00
16 39001 Jd's Rebar & Construction Inc. $159,019.20
17 32563 The Mabry Company, Inc. $162,013.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Ronald G. Carlson Inc.
- 2 -
Iverstine & Campbell LLC
- 3 -
Gerace Construction Llc
- 4 -
T.L. Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 1,000.00 1,000.00 3,139.50 3,139.50 5,000.00 5,000.00 5,000.00 5,000.00
0002 202-02-04000 Removal of Bridge (STA 100+00; 18.4'X 39.0' TIMBER BRIDGE) (WITH WINGWALLS) 1      EACH 2,000.00 2,000.00 2,866.50 2,866.50 3,500.00 3,500.00 3,500.00 3,500.00
0003 203-05-00100 Excavation and Embankment 1      LUMP 10,000.00 10,000.00 6,961.50 6,961.50 8,000.00 8,000.00 14,000.00 14,000.00
0004 204-02-00100 Temporary Hay or Straw Bales 10      EACH 10.00 100.00 16.38 163.80 20.00 200.00 20.00 200.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 4      EACH 100.00 400.00 61.43 245.72 50.00 200.00 150.00 600.00
0006 204-06-00100 Temporary Silt Fencing 125      LNFT 2.50 312.50 3.41 426.25 2.00 250.00 4.00 500.00
0007 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 47.2    CUYD 65.00 3,068.00 90.09 4,252.25 100.00 4,720.00 143.00 6,749.60
0008 701-01-01140 Cross Drain Pipe (72" RCP) 144      LNFT 325.00 46,800.00 322.14 46,388.16 300.00 43,200.00 275.00 39,600.00
0009 705-01-00100 Barbed Wire Fence 60      LNFT 5.00 300.00 5.46 327.60 10.00 600.00 20.00 1,200.00
0010 712-02-00100 Sacked Concrete Revetment 125      SQYD 70.00 8,750.00 66.89 8,361.25 100.00 12,500.00 75.00 9,375.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 2,000.00 2,000.00 7,371.00 7,371.00 2,500.00 2,500.00 5,000.00 5,000.00
0012 716-01-00100 Mulch (Vegetative) 0.3    TON 1,500.00 450.00 887.25 266.18 4,000.00 1,200.00 2,300.00 690.00
0013 717-01-00100 Seeding 6      LB 70.00 420.00 13.65 81.90 50.00 300.00 30.00 180.00
0014 718-01-00100 Fertilizer 142      LB 1.50 213.00 4.10 582.20 5.00 710.00 1.50 213.00
0015 726-01-00100 Bedding Material 107.6    CUYD 69.00 7,424.40 72.35 7,784.86 100.00 10,760.00 75.00 8,070.00
0016 727-01-00100 Mobilization 1      LUMP 2,000.00 2,000.00 3,412.50 3,412.50 9,500.00 9,500.00 10,000.00 10,000.00
0017 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 150.00 600.00 102.38 409.52 80.00 320.00 100.00 400.00
0018 740-01-00100 Construction Layout 1      LUMP 1,000.00 1,000.00 4,095.00 4,095.00 3,000.00 3,000.00 2,000.00 2,000.00
                         
    CONTRACTOR TOTAL       86,837.90   97,135.69   106,460.00   107,277.60



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
M & M Enterprises of Bastrop, LLC
- 6 -
Specialty Trackhoe & Dozer Serv.Inc
- 7 -
W L Bass Construction Inc.
- 8 -
Jeff Mercer LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,500.00 5,500.00 3,000.00 3,000.00 10,000.00 10,000.00 2,500.00 2,500.00
0002 202-02-04000 Removal of Bridge (STA 100+00; 18.4'X 39.0' TIMBER BRIDGE) (WITH WINGWALLS) 1      EACH 2,500.00 2,500.00 3,500.00 3,500.00 8,500.00 8,500.00 5,000.00 5,000.00
0003 203-05-00100 Excavation and Embankment 1      LUMP 10,000.00 10,000.00 4,000.00 4,000.00 10,000.00 10,000.00 10,000.00 10,000.00
0004 204-02-00100 Temporary Hay or Straw Bales 10      EACH 1.00 10.00 30.00 300.00 1.00 10.00 5.00 50.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 4      EACH 85.00 340.00 145.00 580.00 1.00 4.00 25.00 100.00
0006 204-06-00100 Temporary Silt Fencing 125      LNFT 2.00 250.00 2.00 250.00 1.00 125.00 1.00 125.00
0007 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 47.2    CUYD 95.00 4,484.00 130.00 6,136.00 100.00 4,720.00 65.00 3,068.00
0008 701-01-01140 Cross Drain Pipe (72" RCP) 144      LNFT 310.00 44,640.00 356.00 51,264.00 300.00 43,200.00 370.00 53,280.00
0009 705-01-00100 Barbed Wire Fence 60      LNFT 6.00 360.00 12.00 720.00 5.00 300.00 5.00 300.00
0010 712-02-00100 Sacked Concrete Revetment 125      SQYD 100.00 12,500.00 116.00 14,500.00 85.00 10,625.00 175.00 21,875.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 4,000.00 4,000.00 3,500.00 3,500.00 3,500.00 3,500.00 5,000.00 5,000.00
0012 716-01-00100 Mulch (Vegetative) 0.3    TON 2,700.00 810.00 3,000.00 900.00 2,000.00 600.00 1,050.00 315.00
0013 717-01-00100 Seeding 6      LB 25.00 150.00 10.00 60.00 10.00 60.00 5.00 30.00
0014 718-01-00100 Fertilizer 142      LB 3.00 426.00 1.00 142.00 1.00 142.00 10.00 1,420.00
0015 726-01-00100 Bedding Material 107.6    CUYD 90.00 9,684.00 120.00 12,912.00 85.00 9,146.00 95.00 10,222.00
0016 727-01-00100 Mobilization 1      LUMP 12,000.00 12,000.00 8,000.00 8,000.00 15,000.00 15,000.00 8,000.00 8,000.00
0017 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 100.00 400.00 100.00 400.00 75.00 300.00 150.00 600.00
0018 740-01-00100 Construction Layout 1      LUMP 3,000.00 3,000.00 1,800.00 1,800.00 1,500.00 1,500.00 2,500.00 2,500.00
                         
    CONTRACTOR TOTAL       111,054.00   111,964.00   117,732.00   124,385.00



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 9 -
Bondco LLC
- 10 -
Quality Design & Construction, LLC
- 11 -
John Bailey, Inc.
- 12 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 1,500.00 1,500.00 5,100.00 5,100.00 2,500.00 2,500.00 6,000.00 6,000.00
0002 202-02-04000 Removal of Bridge (STA 100+00; 18.4'X 39.0' TIMBER BRIDGE) (WITH WINGWALLS) 1      EACH 5,000.00 5,000.00 7,200.00 7,200.00 10,000.00 10,000.00 10,000.00 10,000.00
0003 203-05-00100 Excavation and Embankment 1      LUMP 5,600.00 5,600.00 15,500.00 15,500.00 7,500.00 7,500.00 16,000.00 16,000.00
0004 204-02-00100 Temporary Hay or Straw Bales 10      EACH 10.00 100.00 13.60 136.00 25.00 250.00 40.00 400.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 4      EACH 150.00 600.00 181.00 724.00 250.00 1,000.00 300.00 1,200.00
0006 204-06-00100 Temporary Silt Fencing 125      LNFT 3.00 375.00 2.00 250.00 4.00 500.00 4.50 562.50
0007 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 47.2    CUYD 105.00 4,956.00 120.00 5,664.00 125.00 5,900.00 110.00 5,192.00
0008 701-01-01140 Cross Drain Pipe (72" RCP) 144      LNFT 480.00 69,120.00 360.00 51,840.00 500.00 72,000.00 389.83 56,135.52
0009 705-01-00100 Barbed Wire Fence 60      LNFT 10.00 600.00 1.80 108.00 15.00 900.00 7.00 420.00
0010 712-02-00100 Sacked Concrete Revetment 125      SQYD 95.00 11,875.00 108.00 13,500.00 125.00 15,625.00 80.00 10,000.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 3,203.00 3,203.00 11,500.00 11,500.00 2,500.00 2,500.00 10,000.00 10,000.00
0012 716-01-00100 Mulch (Vegetative) 0.3    TON 3,300.00 990.00 4,000.00 1,200.00 700.00 210.00 3,500.00 1,050.00
0013 717-01-00100 Seeding 6      LB 20.00 120.00 6.30 37.80 20.00 120.00 55.00 330.00
0014 718-01-00100 Fertilizer 142      LB 5.00 710.00 2.10 298.20 1.50 213.00 5.80 823.60
0015 726-01-00100 Bedding Material 107.6    CUYD 85.50 9,199.80 130.00 13,988.00 125.00 13,450.00 100.00 10,760.00
0016 727-01-00100 Mobilization 1      LUMP 15,553.20 15,553.20 10,900.00 10,900.00 15,000.00 15,000.00 13,000.00 13,000.00
0017 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 85.00 340.00 83.00 332.00 150.00 600.00 95.00 380.00
0018 740-01-00100 Construction Layout 1      LUMP 5,008.00 5,008.00 5,870.00 5,870.00 1,500.00 1,500.00 10,000.00 10,000.00
                         
    CONTRACTOR TOTAL       134,850.00   144,148.00   149,768.00   152,253.62



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 13 -
Blount Bros. Construction, Inc.
- 14 -
C W & W Contractors, Inc.
- 15 -
Guinn Brothers, LLC.
- 16 -
Jd's Rebar & Construction Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 8,000.00 8,000.00 5,800.00 5,800.00
0002 202-02-04000 Removal of Bridge (STA 100+00; 18.4'X 39.0' TIMBER BRIDGE) (WITH WINGWALLS) 1      EACH 20,000.00 20,000.00 5,000.00 5,000.00 6,000.00 6,000.00 9,300.00 9,300.00
0003 203-05-00100 Excavation and Embankment 1      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 12,500.00 12,500.00 17,500.00 17,500.00
0004 204-02-00100 Temporary Hay or Straw Bales 10      EACH 10.00 100.00 10.00 100.00 10.00 100.00 30.00 300.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 4      EACH 300.00 1,200.00 125.00 500.00 100.00 400.00 230.00 920.00
0006 204-06-00100 Temporary Silt Fencing 125      LNFT 4.00 500.00 3.00 375.00 3.00 375.00 9.00 1,125.00
0007 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 47.2    CUYD 85.00 4,012.00 100.00 4,720.00 100.00 4,720.00 205.00 9,676.00
0008 701-01-01140 Cross Drain Pipe (72" RCP) 144      LNFT 350.00 50,400.00 500.00 72,000.00 460.00 66,240.00 245.00 35,280.00
0009 705-01-00100 Barbed Wire Fence 60      LNFT 10.00 600.00 20.00 1,200.00 15.00 900.00 38.00 2,280.00
0010 712-02-00100 Sacked Concrete Revetment 125      SQYD 150.00 18,750.00 100.00 12,500.00 100.00 12,500.00 95.00 11,875.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 6,000.00 6,000.00 5,100.00 5,100.00
0012 716-01-00100 Mulch (Vegetative) 0.3    TON 2,000.00 600.00 5,000.00 1,500.00 2,500.00 750.00 3,800.00 1,140.00
0013 717-01-00100 Seeding 6      LB 20.00 120.00 100.00 600.00 25.00 150.00 80.00 480.00
0014 718-01-00100 Fertilizer 142      LB 20.00 2,840.00 5.00 710.00 1.00 142.00 7.60 1,079.20
0015 726-01-00100 Bedding Material 107.6    CUYD 75.00 8,070.00 125.00 13,450.00 100.00 10,760.00 190.00 20,444.00
0016 727-01-00100 Mobilization 1      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 25,000.00 25,000.00 30,000.00 30,000.00
0017 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 100.00 400.00 100.00 400.00 100.00 400.00 430.00 1,720.00
0018 740-01-00100 Construction Layout 1      LUMP 6,000.00 6,000.00 5,000.00 5,000.00 3,500.00 3,500.00 5,000.00 5,000.00
                         
    CONTRACTOR TOTAL       153,592.00   158,055.00   158,437.00   159,019.20



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 17 -
The Mabry Company, Inc.
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 2,000.00 2,000.00
0002 202-02-04000 Removal of Bridge (STA 100+00; 18.4'X 39.0' TIMBER BRIDGE) (WITH WINGWALLS) 1      EACH 2,500.00 2,500.00
0003 203-05-00100 Excavation and Embankment 1      LUMP 6,500.00 6,500.00
0004 204-02-00100 Temporary Hay or Straw Bales 10      EACH 15.00 150.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 4      EACH 200.00 800.00
0006 204-06-00100 Temporary Silt Fencing 125      LNFT 3.00 375.00
0007 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 47.2    CUYD 65.00 3,068.00
0008 701-01-01140 Cross Drain Pipe (72" RCP) 144      LNFT 625.00 90,000.00
0009 705-01-00100 Barbed Wire Fence 60      LNFT 30.00 1,800.00
0010 712-02-00100 Sacked Concrete Revetment 125      SQYD 100.00 12,500.00
0011 713-01-00100 Temporary Signs and Barricades 1      LUMP 2,500.00 2,500.00
0012 716-01-00100 Mulch (Vegetative) 0.3    TON 1,000.00 300.00
0013 717-01-00100 Seeding 6      LB 25.00 150.00
0014 718-01-00100 Fertilizer 142      LB 5.00 710.00
0015 726-01-00100 Bedding Material 107.6    CUYD 100.00 10,760.00
0016 727-01-00100 Mobilization 1      LUMP 24,500.00 24,500.00
0017 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 100.00 400.00
0018 740-01-00100 Construction Layout 1      LUMP 3,000.00 3,000.00
             
    CONTRACTOR TOTAL       162,013.00