LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 713-17-0044
Parish: East Baton Rouge
Routes:
Description: WOODLAKE DRIVE OVER JONES CREEK
Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST PRESTRESSED CONCRETE GIRDER SPANS BRIDGE, AND RELATED WORK
Estimated Construction Cost: $1,929,994.60


RankLicenseBidderConstruction Bid
1 39462 Jb James Construction Llc $1,541,971.70
2 07740 Cajun Constructors, Inc. $1,635,874.35
3 34567 James Construction Group LLC $1,816,182.79
4 12312 Gilchrist Construction Co. LLC $1,816,326.60
5 36827 Shavers-Whittle Construction LLC $1,878,555.95
6 01012 Cecil D. Gassiott, LLC $1,978,288.25
7 00481 Coastal Bridge Co., L.L.C. $2,059,949.99


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Jb James Construction Llc
- 2 -
Cajun Constructors, Inc.
- 3 -
James Construction Group LLC
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 25,000.00 25,000.00 15,000.00 15,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 2,500.00 2,500.00 6,150.00 6,150.00 35,000.00 35,000.00 1,000.00 1,000.00
0003 202-02-04000 Removal of Bridge (STA. 16+05 - 33' X208.9' CONC SLAB SPN) 1      EACH 68,000.00 68,000.00 41,000.00 41,000.00 60,000.00 60,000.00 125,000.00 125,000.00
0004 202-02-06080 Removal of Concrete Combination Curb and Gutter 571      LNFT 5.00 2,855.00 8.00 4,568.00 3.00 1,713.00 6.00 3,426.00
0005 202-02-32500 Removal of Portland Cement Concrete Pavement 1,327      SQYD 7.00 9,289.00 5.00 6,635.00 16.00 21,232.00 9.00 11,943.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 1,502.4    SQYD 6.00 9,014.40 5.00 7,512.00 5.00 7,512.00 9.00 13,521.60
0007 203-05-00100 Excavation and Embankment 1      LUMP 100,000.00 100,000.00 69,000.00 69,000.00 120,000.00 120,000.00 100,000.00 100,000.00
0008 204-02-00100 Temporary Hay or Straw Bales 32      EACH 15.00 480.00 17.00 544.00 19.00 608.00 20.00 640.00
0009 204-03-00100 Temporary Slope Drains 93      LNFT 11.00 1,023.00 17.00 1,581.00 17.00 1,581.00 20.00 1,860.00
0010 204-05-00100 Temporary Sediment Check Dams (Hay) 2      EACH 120.00 240.00 150.00 300.00 220.00 440.00 250.00 500.00
0011 204-06-00100 Temporary Silt Fencing 2,170      LNFT 2.00 4,340.00 1.75 3,797.50 2.30 4,991.00 1.80 3,906.00
0012 302-01-00100 Class II Base Course 684.5    CUYD 16.00 10,952.00 68.00 46,546.00 75.00 51,337.50 160.00 109,520.00
0013 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 16.9    CUYD 100.00 1,690.00 65.00 1,098.50 120.00 2,028.00 150.00 2,535.00
0014 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 75.00 7,500.00 65.00 6,500.00 73.00 7,300.00 80.00 8,000.00
0015 502-01-00100 Superpave Asphaltic Concrete 840      TON 120.00 100,800.00 165.00 138,600.00 120.00 100,800.00 100.00 84,000.00
0016 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 15.6    TON 150.00 2,340.00 165.00 2,574.00 150.00 2,340.00 265.00 4,134.00
0017 702-04-00100 Adjusting Manholes 1      EACH 1,500.00 1,500.00 1,000.00 1,000.00 3,700.00 3,700.00 1,000.00 1,000.00
0018 705-01-00100 Barbed Wire Fence 295      LNFT 13.00 3,835.00 15.00 4,425.00 8.30 2,448.50 6.60 1,947.00
0019 705-05-00100 Double Swinging Driveway Gates 1      DBGT 2,200.00 2,200.00 2,500.00 2,500.00 2,300.00 2,300.00 850.00 850.00
0020 706-01-00100 Concrete Walk (4" Thick) 53.3    SQYD 54.00 2,878.20 55.00 2,931.50 60.00 3,198.00 90.00 4,797.00
0021 706-02-00200 Concrete Drive (6" Thick) 23.3    SQYD 75.00 1,747.50 45.00 1,048.50 140.00 3,262.00 140.00 3,262.00
0022 711-01-02000 Riprap (10 lb, 10" Thick) Used as Energy Dissipator at Temporary slope Drain Outlets (See Standard EC-01) 1      SQYD 1,500.00 1,500.00 100.00 100.00 580.00 580.00 200.00 200.00
0023 711-01-04000 Riprap (55 lb, 18" Thick) 1,174      SQYD 50.00 58,700.00 50.00 58,700.00 50.00 58,700.00 50.00 58,700.00
0024 711-04-00100 Geotextile Fabric 1,174      SQYD 3.00 3,522.00 2.50 2,935.00 4.20 4,930.80 2.00 2,348.00
0025 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 26      SQYD 75.00 1,950.00 85.00 2,210.00 130.00 3,380.00 175.00 4,550.00
0026 713-01-00100 Temporary Signs and Barricades 1      LUMP 9,000.00 9,000.00 6,500.00 6,500.00 15,000.00 15,000.00 20,000.00 20,000.00
0027 716-01-00100 Mulch (Vegetative) 1.2    TON 985.00 1,182.00 1,000.00 1,200.00 600.00 720.00 680.00 816.00
0028 717-01-00100 Seeding 27      LB 12.00 324.00 12.00 324.00 10.00 270.00 11.50 310.50
0029 718-01-00100 Fertilizer 610      LB 1.00 610.00 0.85 518.50 1.00 610.00 1.15 701.50
0030 719-04-00100 Landscaping 1      LUMP 12,600.00 12,600.00 12,500.00 12,500.00 30,000.00 30,000.00 14,000.00 14,000.00
0031 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,124      SQYD 1.25 2,655.00 1.25 2,655.00 1.24 2,633.76 1.50 3,186.00
0032 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00 102,000.00 102,000.00 180,000.00 180,000.00 175,000.00 175,000.00
0033 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 75.00 300.00 75.00 300.00 50.00 200.00 55.00 220.00
0034 731-02-00100 Reflectorized Raised Pavement Markers 67      EACH 20.00 1,340.00 20.00 1,340.00 20.00 1,340.00 21.00 1,407.00
0035 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 0.997  MILE 1,700.00 1,694.90 2,000.00 1,994.00 1,675.00 1,669.98 2,000.00 1,994.00
0036 740-01-00100 Construction Layout 1      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 15,000.00 15,000.00 35,000.00 35,000.00
0037 804-01-00400 Precast Concrete Piles (18") 992      LNFT 65.00 64,480.00 105.00 104,160.00 70.00 69,440.00 70.00 69,440.00
0038 804-01-00600 Precast Concrete Piles (24") 1,240      LNFT 102.00 126,480.00 145.00 179,800.00 130.00 161,200.00 95.00 117,800.00
0039 804-12-00100 Loading Permanent Piles 2      EACH 100.00 200.00 1,200.00 2,400.00 10,000.00 20,000.00 2,500.00 5,000.00
0040 805-01-00700 Class A Concrete (Bents) 129.32   CUYD 1,000.00 129,320.00 725.00 93,757.00 800.00 103,456.00 1,100.00 142,252.00
0041 805-03-00100 Class AA Concrete 295.2    CUYD 825.00 243,540.00 1,025.00 302,580.00 920.00 271,584.00 950.00 280,440.00
0042 805-08-00800 Precast-Prestressed Concrete Girder (Type Quad Beam) 1,896      LNFT 62.00 117,552.00 70.00 132,720.00 88.00 166,848.00 58.00 109,968.00
0043 806-01-00100 Deformed Reinforcing Steel 95,359      LB 1.00 95,359.00 0.95 90,591.05 0.95 90,591.05 0.80 76,287.20
0044 807-08-00100 Structural Metalwork (4234 LBS.) 1      LUMP 30,000.00 30,000.00 24,000.00 24,000.00 35,000.00 35,000.00 30,000.00 30,000.00
0045 810-04-00100 Steel and Concrete Railing 480      LNFT 151.00 72,480.00 165.00 79,200.00 128.00 61,440.00 215.00 103,200.00
0046 813-01-00100 Concrete Approach Slabs 186.66   SQYD 195.00 36,398.70 180.00 33,598.80 270.00 50,398.20 280.00 52,264.80
0047 NS-804-00001 Vibration Monitoring 36      EACH 350.00 12,600.00 180.00 6,480.00 400.00 14,400.00 400.00 14,400.00
                         
    CONTRACTOR TOTAL       1,541,971.70   1,635,874.35   1,816,182.79   1,816,326.60



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Shavers-Whittle Construction LLC
- 6 -
Cecil D. Gassiott, LLC
- 7 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 25,000.00 25,000.00 15,000.00 15,000.00 200,000.00 200,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 25,000.00 25,000.00 10,000.00 10,000.00 18,000.00 18,000.00
0003 202-02-04000 Removal of Bridge (STA. 16+05 - 33' X208.9' CONC SLAB SPN) 1      EACH 60,000.00 60,000.00 75,000.00 75,000.00 58,500.00 58,500.00
0004 202-02-06080 Removal of Concrete Combination Curb and Gutter 571      LNFT 18.00 10,278.00 7.00 3,997.00 8.50 4,853.50
0005 202-02-32500 Removal of Portland Cement Concrete Pavement 1,327      SQYD 15.00 19,905.00 10.00 13,270.00 18.00 23,886.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 1,502.4    SQYD 8.00 12,019.20 4.00 6,009.60 12.00 18,028.80
0007 203-05-00100 Excavation and Embankment 1      LUMP 65,000.00 65,000.00 70,000.00 70,000.00 120,000.00 120,000.00
0008 204-02-00100 Temporary Hay or Straw Bales 32      EACH 20.00 640.00 14.00 448.00 17.00 544.00
0009 204-03-00100 Temporary Slope Drains 93      LNFT 23.20 2,157.60 32.00 2,976.00 20.00 1,860.00
0010 204-05-00100 Temporary Sediment Check Dams (Hay) 2      EACH 130.00 260.00 125.00 250.00 135.00 270.00
0011 204-06-00100 Temporary Silt Fencing 2,170      LNFT 2.50 5,425.00 2.00 4,340.00 1.70 3,689.00
0012 302-01-00100 Class II Base Course 684.5    CUYD 80.00 54,760.00 100.00 68,450.00 89.00 60,920.50
0013 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 16.9    CUYD 100.00 1,690.00 100.00 1,690.00 97.00 1,639.30
0014 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 75.00 7,500.00 100.00 10,000.00 115.00 11,500.00
0015 502-01-00100 Superpave Asphaltic Concrete 840      TON 125.00 105,000.00 170.00 142,800.00 124.00 104,160.00
0016 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 15.6    TON 150.00 2,340.00 250.00 3,900.00 150.00 2,340.00
0017 702-04-00100 Adjusting Manholes 1      EACH 750.00 750.00 1,000.00 1,000.00 3,000.00 3,000.00
0018 705-01-00100 Barbed Wire Fence 295      LNFT 13.50 3,982.50 15.00 4,425.00 14.00 4,130.00
0019 705-05-00100 Double Swinging Driveway Gates 1      DBGT 2,500.00 2,500.00 1,100.00 1,100.00 2,400.00 2,400.00
0020 706-01-00100 Concrete Walk (4" Thick) 53.3    SQYD 95.00 5,063.50 55.00 2,931.50 90.00 4,797.00
0021 706-02-00200 Concrete Drive (6" Thick) 23.3    SQYD 105.00 2,446.50 95.00 2,213.50 95.00 2,213.50
0022 711-01-02000 Riprap (10 lb, 10" Thick) Used as Energy Dissipator at Temporary slope Drain Outlets (See Standard EC-01) 1      SQYD 60.00 60.00 500.00 500.00 400.00 400.00
0023 711-01-04000 Riprap (55 lb, 18" Thick) 1,174      SQYD 60.00 70,440.00 52.00 61,048.00 67.00 78,658.00
0024 711-04-00100 Geotextile Fabric 1,174      SQYD 3.00 3,522.00 3.25 3,815.50 4.00 4,696.00
0025 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 26      SQYD 115.00 2,990.00 170.00 4,420.00 112.00 2,912.00
0026 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 25,000.00 25,000.00 17,000.00 17,000.00
0027 716-01-00100 Mulch (Vegetative) 1.2    TON 1,200.00 1,440.00 1,000.00 1,200.00 1,125.00 1,350.00
0028 717-01-00100 Seeding 27      LB 15.00 405.00 12.00 324.00 11.25 303.75
0029 718-01-00100 Fertilizer 610      LB 0.75 457.50 0.65 396.50 0.70 427.00
0030 719-04-00100 Landscaping 1      LUMP 14,000.00 14,000.00 13,500.00 13,500.00 14,000.00 14,000.00
0031 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,124      SQYD 1.35 2,867.40 1.25 2,655.00 1.36 2,888.64
0032 727-01-00100 Mobilization 1      LUMP 175,000.00 175,000.00 230,000.00 230,000.00 200,000.00 200,000.00
0033 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 170.00 680.00 100.00 400.00 100.00 400.00
0034 731-02-00100 Reflectorized Raised Pavement Markers 67      EACH 23.00 1,541.00 20.00 1,340.00 6.00 402.00
0035 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 0.997  MILE 1,750.00 1,744.75 2,500.00 2,492.50 30,000.00 29,910.00
0036 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00 15,000.00 15,000.00 35,000.00 35,000.00
0037 804-01-00400 Precast Concrete Piles (18") 992      LNFT 84.00 83,328.00 55.00 54,560.00 75.00 74,400.00
0038 804-01-00600 Precast Concrete Piles (24") 1,240      LNFT 145.00 179,800.00 120.00 148,800.00 95.00 117,800.00
0039 804-12-00100 Loading Permanent Piles 2      EACH 1,500.00 3,000.00 4,000.00 8,000.00 100.00 200.00
0040 805-01-00700 Class A Concrete (Bents) 129.32   CUYD 1,200.00 155,184.00 1,300.00 168,116.00 1,000.00 129,320.00
0041 805-03-00100 Class AA Concrete 295.2    CUYD 915.00 270,108.00 1,300.00 383,760.00 950.00 280,440.00
0042 805-08-00800 Precast-Prestressed Concrete Girder (Type Quad Beam) 1,896      LNFT 70.00 132,720.00 65.00 123,240.00 70.00 132,720.00
0043 806-01-00100 Deformed Reinforcing Steel 95,359      LB 1.00 95,359.00 0.85 81,055.15 1.00 95,359.00
0044 807-08-00100 Structural Metalwork (4234 LBS.) 1      LUMP 35,000.00 35,000.00 47,000.00 47,000.00 41,500.00 41,500.00
0045 810-04-00100 Steel and Concrete Railing 480      LNFT 205.00 98,400.00 195.00 93,600.00 200.00 96,000.00
0046 813-01-00100 Concrete Approach Slabs 186.66   SQYD 200.00 37,332.00 250.00 46,665.00 200.00 37,332.00
0047 NS-804-00001 Vibration Monitoring 36      EACH 735.00 26,460.00 600.00 21,600.00 550.00 19,800.00
                     
    CONTRACTOR TOTAL       1,878,555.95   1,978,288.25   2,059,949.99