LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 713-01-0122
Parish: Acadia
Routes:
Description: FAULK ROAD BRIDGE OVER LYONS POINT GULLY
Type Const: GRADING, DRAINAGE STRUCTURES, AGGREGATE SURFACING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERT, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost: $1,187,544.00


RankLicenseBidderConstruction Bid
1 08815 W. E. Mcdonald & Son, LLC. $847,979.60
2 09090 Guinn Brothers, LLC. $881,179.50
3 48925 David V. Temple $1,053,230.51
4 01012 Cecil D. Gassiott, LLC $1,060,533.88
5 12312 Gilchrist Construction Co. LLC $1,122,979.05
6 39462 Jb James Construction Llc $1,241,794.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
W. E. Mcdonald & Son, LLC.
- 2 -
Guinn Brothers, LLC.
- 3 -
David V. Temple
- 4 -
Cecil D. Gassiott, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 15,000.00 15,000.00 6,000.00 6,000.00 15,150.00 15,150.00 4,000.00 4,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 2,000.00 2,000.00 2,000.00 2,000.00 10,000.00 10,000.00 2,000.00 2,000.00
0003 202-02-04000 Removal of Bridge (STA 400+00;21.3' X 63.1.' TIMBER BR) 1      EACH 2,000.00 2,000.00 4,000.00 4,000.00 5,000.00 5,000.00 20,000.00 20,000.00
0004 202-02-04000 Removal of Bridge (STA 500+00; 18.4'X22.6' TIMBER BRIDGE) 1      EACH 6,000.00 6,000.00 3,500.00 3,500.00 5,000.00 5,000.00 4,196.88 4,196.88
0005 203-05-00100 Excavation and Embankment 1      LUMP 47,000.00 47,000.00 36,000.00 36,000.00 65,817.00 65,817.00 55,000.00 55,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 75      EACH 3.00 225.00 10.00 750.00 10.50 787.50 9.00 675.00
0007 204-03-00100 Temporary Slope Drains 290      LNFT 1.00 290.00 0.00 0.00 10.00 2,900.00 18.00 5,220.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 8      EACH 200.00 1,600.00 100.00 800.00 100.00 800.00 150.00 1,200.00
0009 204-06-00100 Temporary Silt Fencing 2,195      LNFT 2.00 4,390.00 1.50 3,292.50 1.60 3,512.00 2.20 4,829.00
0010 302-01-00700 Class II Base Course (Stone) 390.2    CUYD 83.00 32,386.60 80.00 31,216.00 98.70 38,512.74 88.00 34,337.60
0011 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 63      CUYD 52.00 3,276.00 85.00 5,355.00 63.49 3,999.87 67.00 4,221.00
0012 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 66.3    CUYD 78.00 5,171.40 85.00 5,635.50 90.50 6,000.15 67.00 4,442.10
0013 502-01-00100 Superpave Asphaltic Concrete 316.6    TON 191.00 60,470.60 170.00 53,822.00 177.00 56,038.20 200.00 63,320.00
0014 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 461      LNFT 50.00 23,050.00 42.00 19,362.00 76.87 35,437.07 95.00 43,795.00
0015 701-05-01140 Side Drain Pipe (48" RCP/PP/CMP) 176      LNFT 105.00 18,480.00 150.00 26,400.00 138.00 24,288.00 175.00 30,800.00
0016 701-05-01180 Side Drain Pipe (60" RCP/CMP) 122      LNFT 159.00 19,398.00 255.00 31,110.00 200.00 24,400.00 200.00 24,400.00
0017 701-05-02060 Side Drain Pipe (Erosion) (24" PP/CMP) 96      LNFT 50.00 4,800.00 42.00 4,032.00 74.38 7,140.48 105.00 10,080.00
0018 701-05-02140 Side Drain Pipe (Erosion) (48" PP/CMP) 180      LNFT 105.00 18,900.00 150.00 27,000.00 139.60 25,128.00 163.00 29,340.00
0019 701-05-02180 Side Drain Pipe (Erosion) (60" CMP) 123      LNFT 159.00 19,557.00 255.00 31,365.00 196.60 24,181.80 200.00 24,600.00
0020 702-03-00100 Catch Basins (CB-01) 2      EACH 2,500.00 5,000.00 4,000.00 8,000.00 3,200.00 6,400.00 3,250.00 6,500.00
0021 702-03-00200 Catch Basins (CB-02) 3      EACH 3,800.00 11,400.00 4,200.00 12,600.00 4,200.00 12,600.00 4,200.00 12,600.00
0022 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 24.00 900.00 28.00 1,050.00 20.00 750.00 27.00 1,012.50
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 75      LNFT 57.00 4,275.00 60.00 4,500.00 65.00 4,875.00 65.00 4,875.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 3      EACH 2,200.00 6,600.00 2,500.00 7,500.00 2,200.00 6,600.00 2,500.00 7,500.00
0025 705-01-00100 Barbed Wire Fence 100      LNFT 30.00 3,000.00 15.00 1,500.00 19.50 1,950.00 22.00 2,200.00
0026 711-01-04000 Riprap (55 lb, 18" Thick) 1,316      SQYD 65.00 85,540.00 60.00 78,960.00 55.00 72,380.00 59.00 77,644.00
0027 711-04-00100 Geotextile Fabric 1,316      SQYD 3.00 3,948.00 5.00 6,580.00 2.60 3,421.60 3.20 4,211.20
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 15,000.00 15,000.00 10,000.00 10,000.00 14,000.00 14,000.00
0029 716-01-00100 Mulch (Vegetative) 1.5    TON 650.00 975.00 1,000.00 1,500.00 1,000.00 1,500.00 1,100.00 1,650.00
0030 717-01-00100 Seeding 36      LB 8.00 288.00 20.00 720.00 12.00 432.00 13.00 468.00
0031 718-01-00100 Fertilizer 785      LB 0.60 471.00 1.00 785.00 1.00 785.00 1.00 785.00
0032 726-01-00100 Bedding Material 322.2    CUYD 75.00 24,165.00 80.00 25,776.00 88.00 28,353.60 78.00 25,131.60
0033 727-01-00100 Mobilization 1      LUMP 50,000.00 50,000.00 35,000.00 35,000.00 85,000.00 85,000.00 140,000.00 140,000.00
0034 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 70.00 280.00 100.00 400.00 65.00 260.00 75.00 300.00
0035 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 75.00 300.00 100.00 400.00 80.00 320.00 80.00 320.00
0036 740-01-00100 Construction Layout 1      LUMP 5,100.00 5,100.00 8,000.00 8,000.00 12,500.00 12,500.00 8,400.00 8,400.00
0037 804-01-00200 Precast Concrete Piles (14") 1,708      LNFT 49.00 83,692.00 50.00 85,400.00 65.00 111,020.00 65.00 111,020.00
0038 804-12-00100 Loading Permanent Piles 1      EACH 1.00 1.00 1.00 1.00 1,000.00 1,000.00 1,500.00 1,500.00
0039 805-01-00300 Class A Concrete (Box Culvert Headwalls) 26.45   CUYD 820.00 21,689.00 1,000.00 26,450.00 1,050.00 27,772.50 1,250.00 33,062.50
0040 805-10-02100 Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) 6      SPAN 25,000.00 150,000.00 30,000.00 180,000.00 34,500.00 207,000.00 23,500.00 141,000.00
0041 805-12-12000 Reinforced Concrete Box Culverts (6' x 6') (Cast-In-Place) 132      LNFT 478.00 63,096.00 485.00 64,020.00 625.00 82,500.00 625.00 82,500.00
0042 806-01-00100 Deformed Reinforcing Steel (BOX CULVERT HEADWALLS) 2,265      LB 1.00 2,265.00 1.50 3,397.50 1.20 2,718.00 1.50 3,397.50
0043 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 60 DEG CROSSING) (W/O ASPHALT) 1      EACH 8,000.00 8,000.00 10,000.00 10,000.00 9,500.00 9,500.00 7,000.00 7,000.00
0044 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 60 DEG CROSSING) (TAPERED BARRIER RAILING W/O ASPHALT) 1      EACH 8,000.00 8,000.00 12,000.00 12,000.00 9,500.00 9,500.00 7,000.00 7,000.00
                         
    CONTRACTOR TOTAL       847,979.60   881,179.50   1,053,230.51   1,060,533.88



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Gilchrist Construction Co. LLC
- 6 -
Jb James Construction Llc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 25,000.00 25,000.00 80,000.00 80,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 8,000.00 8,000.00 3,000.00 3,000.00
0003 202-02-04000 Removal of Bridge (STA 400+00;21.3' X 63.1.' TIMBER BR) 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00
0004 202-02-04000 Removal of Bridge (STA 500+00; 18.4'X22.6' TIMBER BRIDGE) 1      EACH 5,000.00 5,000.00 15,000.00 15,000.00
0005 203-05-00100 Excavation and Embankment 1      LUMP 115,000.00 115,000.00 125,000.00 125,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 75      EACH 20.00 1,500.00 11.00 825.00
0007 204-03-00100 Temporary Slope Drains 290      LNFT 12.00 3,480.00 15.00 4,350.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 8      EACH 200.00 1,600.00 100.00 800.00
0009 204-06-00100 Temporary Silt Fencing 2,195      LNFT 1.40 3,073.00 2.00 4,390.00
0010 302-01-00700 Class II Base Course (Stone) 390.2    CUYD 100.00 39,020.00 100.00 39,020.00
0011 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 63      CUYD 120.00 7,560.00 100.00 6,300.00
0012 403-01-00100 Aggregate Roadway Surfacing (Vehicular Measurement) 66.3    CUYD 90.00 5,967.00 100.00 6,630.00
0013 502-01-00100 Superpave Asphaltic Concrete 316.6    TON 165.00 52,239.00 180.00 56,988.00
0014 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 461      LNFT 63.00 29,043.00 45.00 20,745.00
0015 701-05-01140 Side Drain Pipe (48" RCP/PP/CMP) 176      LNFT 125.00 22,000.00 120.00 21,120.00
0016 701-05-01180 Side Drain Pipe (60" RCP/CMP) 122      LNFT 200.00 24,400.00 160.00 19,520.00
0017 701-05-02060 Side Drain Pipe (Erosion) (24" PP/CMP) 96      LNFT 63.00 6,048.00 45.00 4,320.00
0018 701-05-02140 Side Drain Pipe (Erosion) (48" PP/CMP) 180      LNFT 125.00 22,500.00 120.00 21,600.00
0019 701-05-02180 Side Drain Pipe (Erosion) (60" CMP) 123      LNFT 200.00 24,600.00 160.00 19,680.00
0020 702-03-00100 Catch Basins (CB-01) 2      EACH 5,000.00 10,000.00 3,000.00 6,000.00
0021 702-03-00200 Catch Basins (CB-02) 3      EACH 5,500.00 16,500.00 3,400.00 10,200.00
0022 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 25.00 937.50 20.00 750.00
0023 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 75      LNFT 63.00 4,725.00 65.00 4,875.00
0024 704-11-00100 Guard Rail End Treatment (Flared) 3      EACH 2,400.00 7,200.00 2,300.00 6,900.00
0025 705-01-00100 Barbed Wire Fence 100      LNFT 22.00 2,200.00 10.00 1,000.00
0026 711-01-04000 Riprap (55 lb, 18" Thick) 1,316      SQYD 55.00 72,380.00 56.00 73,696.00
0027 711-04-00100 Geotextile Fabric 1,316      SQYD 3.30 4,342.80 2.50 3,290.00
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 20,000.00 20,000.00
0029 716-01-00100 Mulch (Vegetative) 1.5    TON 1,200.00 1,800.00 1,000.00 1,500.00
0030 717-01-00100 Seeding 36      LB 13.50 486.00 12.00 432.00
0031 718-01-00100 Fertilizer 785      LB 1.15 902.75 1.00 785.00
0032 726-01-00100 Bedding Material 322.2    CUYD 90.00 28,998.00 80.00 25,776.00
0033 727-01-00100 Mobilization 1      LUMP 107,000.00 107,000.00 120,000.00 120,000.00
0034 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 75.00 300.00 50.00 200.00
0035 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 84.00 336.00 75.00 300.00
0036 740-01-00100 Construction Layout 1      LUMP 25,000.00 25,000.00 20,000.00 20,000.00
0037 804-01-00200 Precast Concrete Piles (14") 1,708      LNFT 47.00 80,276.00 64.00 109,312.00
0038 804-12-00100 Loading Permanent Piles 1      EACH 6,000.00 6,000.00 100.00 100.00
0039 805-01-00300 Class A Concrete (Box Culvert Headwalls) 26.45   CUYD 1,200.00 31,740.00 1,200.00 31,740.00
0040 805-10-02100 Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) 6      SPAN 32,000.00 192,000.00 38,000.00 228,000.00
0041 805-12-12000 Reinforced Concrete Box Culverts (6' x 6') (Cast-In-Place) 132      LNFT 580.00 76,560.00 660.00 87,120.00
0042 806-01-00100 Deformed Reinforcing Steel (BOX CULVERT HEADWALLS) 2,265      LB 1.00 2,265.00 2.00 4,530.00
0043 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 60 DEG CROSSING) (W/O ASPHALT) 1      EACH 10,000.00 10,000.00 8,000.00 8,000.00
0044 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 60 DEG CROSSING) (TAPERED BARRIER RAILING W/O ASPHALT) 1      EACH 10,000.00 10,000.00 8,000.00 8,000.00
                 
    CONTRACTOR TOTAL       1,122,979.05   1,241,794.00