LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 455-09-0003
Parish: Caddo
Routes: I-49
Description: I-49 NORTH (LA 1 TO LA 173)
Type Const: GRADING; DRAINAGE STRUCTURES; CLASS II BASE COURSE; SLAB SPAN AND PRESTRESSED GIRDER BRIDGES; ALTERNATE AA1, PORTLAND CEMENT CONCRETE PAVEMENT; ALTERNATE AA2, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT; AND RELATED WORK.
Estimated Construction Cost: $58,612,874.48
Maximum Number of Days Allowed for Construction: 9999
Calculated Daily User Cost: $3,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 34567 James Construction Group LLC $60,723,371.65 879 $1,503,300.00 $64,863,671.65
2 47577 T.J. Lambrecht Construction, Inc. $63,391,928.91 790 $1,503,300.00 $67,265,228.91
3 39462 JB James Construction LLC $63,746,259.08 800 $1,503,300.00 $67,649,559.08
4 42076 Austin Bridge & Road, Lp $64,122,200.00 850 $1,503,300.00 $68,175,500.00
5 36374 Best-Yet Builders, LLC $67,774,156.77 815 $1,503,300.00 $71,722,456.77
6 12312 Gilchrist Construction Co. LLC $67,981,696.81 800 $1,503,300.00 $71,884,996.81
  12370 Hill Brothers Construction Co., Inc IRREGULAR IRREGULAR IRREGULAR IRREGULAR


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
James Construction Group LLC
- 2 -
T.J. Lambrecht Construction, Inc.
- 3 -
JB James Construction LLC
- 4 -
Austin Bridge & Road, Lp
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 1,000,000.00 1,000,000.00 3,173,000.00 3,173,000.00 1,500,000.00 1,500,000.00 4,570,000.00 4,570,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 127,000.00 127,000.00 164,996.20 164,996.20 100,000.00 100,000.00 50,000.00 50,000.00
0003 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Lt. Sta. 121+40) 1      EACH 0.01 0.01 784.77 784.77 1.00 1.00 1,100.00 1,100.00
0004 202-02-00010 Removal of Brick Veneer House on Slab (Lt. Sta. 121+00, 2816 Sq. Ft.) 1      EACH 250.00 250.00 4,001.79 4,001.79 1.00 1.00 7,000.00 7,000.00
0005 202-02-00010 Removal of Metal Pump House on Pier (Lt. Sta. 122+00, 36 Sq. Ft.) 1      EACH 250.00 250.00 130.81 130.81 1.00 1.00 800.00 800.00
0006 202-02-00010 Removal of Metal Storage Shed on Dirt (Lt. Sta. 174+00, 208 Sq. Ft.) 1      EACH 0.01 0.01 261.60 261.60 1.00 1.00 800.00 800.00
0007 202-02-00010 Removal of Wood Frame Garage on Dirt (Rt. Sta. 122+05, 500 Sq. Ft.) 1      EACH 0.01 0.01 523.17 523.17 1.00 1.00 1,200.00 1,200.00
0008 202-02-00010 Removal of Brick Veneer House on Slab (Lt. Sta. 121+60, 1300 Sq. Ft.) 1      EACH 250.00 250.00 4,001.79 4,001.79 1.00 1.00 5,200.00 5,200.00
0009 202-02-00010 Removal of Metal Pump House on Dirt (Rt. Sta. 122+00, 22 Sq. Ft.) 1      EACH 0.01 0.01 130.81 130.81 1.00 1.00 900.00 900.00
0010 202-02-00010 Removal of Metal Storage Building on Pier (Lt. Sta. 122+00, 30 Sq. Ft.) 1      EACH 0.01 0.01 130.81 130.81 1.00 1.00 800.00 800.00
0011 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Rt. Sta. 121+00, 18 x 32 x 4) 1      EACH 0.01 0.01 784.77 784.77 1.00 1.00 1,300.00 1,300.00
0012 202-02-00010 Removal of Wood Frame Garage on Slab (Rt. Sta. 122+00, 720 Sq. Ft.) 1      EACH 0.01 0.01 784.77 784.77 1.00 1.00 1,300.00 1,300.00
0013 202-02-00010 Removal of Wood Frame Shop Building on Slab (Lt. Sta. 108+50, 2743 Sq. Ft.) 1      EACH 2,200.00 2,200.00 4,001.79 4,001.79 1.00 1.00 5,000.00 5,000.00
0014 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Lt. Sta. 109+15, 20 x 32) 1      EACH 0.01 0.01 784.77 784.77 1.00 1.00 1,100.00 1,100.00
0015 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 120+65, 2000 Sq. Ft.) 1      EACH 500.00 500.00 4,001.79 4,001.79 1.00 1.00 6,500.00 6,500.00
0016 202-02-00010 Removal of Wood Frame Shed on Slab (Rt. Sta. 100+50, 16 Sq. Ft.) 1      EACH 0.01 0.01 130.81 130.81 1.00 1.00 800.00 800.00
0017 202-02-00010 Removal of Masonry Storage Building on Slab (Rt. Sta. 31+50, 49 Sq. Ft.) 1      EACH 0.01 0.01 130.81 130.81 1.00 1.00 1,000.00 1,000.00
0018 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 31+40, 1461 Sq. Ft.) 1      EACH 4,000.00 4,000.00 4,001.79 4,001.79 1.00 1.00 5,500.00 5,500.00
0019 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 100+50, 1634 Sq. Ft.) 1      EACH 0.01 0.01 4,001.79 4,001.79 1.00 1.00 6,000.00 6,000.00
0020 202-02-00010 Removal of Wood Frame Storage Building on Dirt (Lt. Sta. 110+50, 200 Sq. Ft.) 1      EACH 0.01 0.01 261.60 261.60 1.00 1.00 1,500.00 1,500.00
0021 202-02-38500 Removal of Surfacing and Stablized Base 21,895.8    SQYD 4.00 87,583.20 3.21 70,285.52 3.65 79,919.67 2.50 54,739.50
0022 202-07-00100 Plugging Existing Water Wells 3      EACH 2,500.00 7,500.00 1,650.04 4,950.12 3,000.00 9,000.00 1,500.00 4,500.00
0023 203-01-00100 General Excavation 886,436      CUYD 1.75 1,551,263.00 2.30 2,038,802.80 1.80 1,595,584.80 2.00 1,772,872.00
0024 203-02-00100 Drainage Excavation 17,972      CUYD 11.50 206,678.00 6.46 116,099.12 5.00 89,860.00 6.00 107,832.00
0025 203-03-00100 Embankment 2,422,899      CUYD 4.30 10,418,465.70 4.88 11,823,747.12 5.50 13,325,944.50 4.55 11,024,190.45
0026 203-04-00300 Nonplastic Embankment (Stone) 241      CUYD 375.00 90,375.00 135.52 32,660.32 110.00 26,510.00 190.00 45,790.00
0027 204-02-00100 Temporary Hay or Straw Bales 91      EACH 20.00 1,820.00 10.00 910.00 10.00 910.00 15.00 1,365.00
0028 204-05-00100 Temporary Sediment Check Dams (Hay) 159      EACH 115.00 18,285.00 95.00 15,105.00 100.00 15,900.00 100.00 15,900.00
0029 204-05-00200 Temporary Sediment Check Dams (Stone) 111      EACH 325.00 36,075.00 516.58 57,340.38 700.00 77,700.00 550.00 61,050.00
0030 204-06-00100 Temporary Silt Fencing 74,365      LNFT 3.00 223,095.00 1.39 103,367.35 1.60 118,984.00 1.50 111,547.50
0031 204-07-00100 Temporary Stone Construction Entrance 3      EACH 5,000.00 15,000.00 2,655.86 7,967.58 3,000.00 9,000.00 1,000.00 3,000.00
0032 302-01-00200 Class II Base Course (Soil Cement) 2,412.4    CUYD 45.00 108,558.00 40.50 97,702.20 40.00 96,496.00 115.00 277,426.00
0033 302-02-01040 Class II Base Course (4" Thick) (Stone) 38,948.7    SQYD 11.00 428,435.70 7.95 309,642.17 8.50 331,063.95 9.00 350,538.30
0034 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 181,140.2    SQYD 11.00 1,992,542.20 9.69 1,755,248.54 10.00 1,811,402.00 5.75 1,041,556.15
0035 302-02-01560 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) 917.8    SQYD 14.00 12,849.20 15.15 13,904.67 14.00 12,849.20 11.00 10,095.80
0036 302-02-02020 Class II Base Course (6" Thick) (Soil Cement) 295,399.5    SQYD 6.00 1,772,397.00 5.26 1,553,801.37 6.00 1,772,397.00 5.00 1,476,997.50
0037 302-02-02560 Class II Base Course (7" Thick) (Stone or Recycled Portland Cement Concrete) 76,013.6    SQYD 15.00 1,140,204.00 13.37 1,016,301.83 9.00 684,122.40 12.50 950,170.00
0038 302-02-04500 Class II Base Course (9" Thick) (Stone or Recycled Portland Cement Concrete) 557.2    SQYD 20.00 11,144.00 22.09 12,308.55 23.00 12,815.60 20.00 11,144.00
0039 305-01-04000 Subgrade Layer (12" Thick) 260,016      SQYD 6.00 1,560,096.00 8.47 2,202,335.52 7.00 1,820,112.00 9.00 2,340,144.00
0040 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 140.5    CUYD 100.00 14,050.00 68.26 9,590.53 100.00 14,050.00 110.00 15,455.00
0041 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 200      CUYD 30.00 6,000.00 48.32 9,664.00 90.00 18,000.00 75.00 15,000.00
0042 502-01-00100 Superpave Asphaltic Concrete 64.2    TON 200.00 12,840.00 200.00 12,840.00 200.00 12,840.00 250.00 16,050.00
0043 701-01-01000 Cross Drain Pipe (24" RCP/PP) (Type 3 Joints) 326      LNFT 70.00 22,820.00 111.78 36,440.28 68.00 22,168.00 120.00 39,120.00
0044 701-01-01020 Cross Drain Pipe (30" RCP/PP) (Type 3 Joints) 598      LNFT 80.00 47,840.00 122.94 73,518.12 78.00 46,644.00 132.00 78,936.00
0045 701-03-01020 Storm Drain Pipe (18" RCP/PP) 200      LNFT 45.00 9,000.00 49.38 9,876.00 60.00 12,000.00 54.00 10,800.00
0046 701-03-01040 Storm Drain Pipe (24" RCP/PP) 830      LNFT 60.00 49,800.00 59.52 49,401.60 63.00 52,290.00 65.00 53,950.00
0047 701-03-01060 Storm Drain Pipe (30" RCP/PP) 148      LNFT 75.00 11,100.00 71.88 10,638.24 82.00 12,136.00 78.00 11,544.00
0048 701-03-01080 Storm Drain Pipe (36" RCP/PP) 459      LNFT 110.00 50,490.00 84.76 38,904.84 95.00 43,605.00 92.00 42,228.00
0049 701-03-01120 Storm Drain Pipe (54" RCP) 595      LNFT 200.00 119,000.00 170.36 101,364.20 170.00 101,150.00 185.00 110,075.00
0050 701-03-01140 Storm Drain Pipe (60" RCP) 427      LNFT 235.00 100,345.00 192.31 82,116.37 200.00 85,400.00 210.00 89,670.00
0051 701-03-01200 Storm Drain Pipe (96" RCP) 402      LNFT 465.00 186,930.00 380.00 152,760.00 420.00 168,840.00 410.00 164,820.00
0052 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) (Type 1 Joints) 578      LNFT 46.00 26,588.00 51.54 29,790.12 54.00 31,212.00 56.00 32,368.00
0053 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) (Type 1 Joints) 270      LNFT 55.00 14,850.00 59.51 16,067.70 68.00 18,360.00 65.00 17,550.00
0054 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 68      LNFT 75.00 5,100.00 71.88 4,887.84 70.00 4,760.00 80.00 5,440.00
0055 701-05-01100 Side Drain Pipe (36" RCP/PP/CMP) 126      LNFT 110.00 13,860.00 86.76 10,931.76 80.00 10,080.00 95.00 11,970.00
0056 702-02-00100 Manholes (MH-06) 1      EACH 4,550.00 4,550.00 5,658.00 5,658.00 7,000.00 7,000.00 7,000.00 7,000.00
0057 702-03-00100 Catch Basins (CB-01) 9      EACH 3,515.00 31,635.00 4,248.00 38,232.00 2,500.00 22,500.00 5,000.00 45,000.00
0058 702-03-00200 Catch Basins (CB-02) 3      EACH 5,390.00 16,170.00 4,650.00 13,950.00 5,500.00 16,500.00 5,500.00 16,500.00
0059 703-01-00100 Shoulder Underdrain Systems 7,673      LNFT 10.00 76,730.00 9.41 72,202.93 8.50 65,220.50 12.50 95,912.50
0060 704-03-00100 Blocked Out Guard Rail 2,437.5    LNFT 16.50 40,218.75 16.50 40,218.75 17.00 41,437.50 17.00 41,437.50
0061 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 660      LNFT 54.00 35,640.00 54.00 35,640.00 54.00 35,640.00 55.00 36,300.00
0062 704-11-00100 Guard Rail End Treatment (Flared) 22      EACH 1,950.00 42,900.00 1,950.00 42,900.00 2,000.00 44,000.00 2,000.00 44,000.00
0063 704-11-00300 Guard Rail End Treatment (Bi-Directional) 2      EACH 4,500.00 9,000.00 4,500.00 9,000.00 4,500.00 9,000.00 5,000.00 10,000.00
0064 705-01-00100 Barbed Wire Fence 848      LNFT 5.00 4,240.00 2.50 2,120.00 3.00 2,544.00 5.10 4,324.80
0065 705-02-00100 Combination Mesh & Barbed Wire Fence 57,733      LNFT 5.50 317,531.50 3.35 193,405.55 3.50 202,065.50 5.25 303,098.25
0066 705-04-00100 Single Swinging Driveway Gates 2      EACH 575.00 1,150.00 500.00 1,000.00 500.00 1,000.00 600.00 1,200.00
0067 705-05-00100 Double Swinging Driveway Gates 2      DBGT 750.00 1,500.00 850.00 1,700.00 900.00 1,800.00 800.00 1,600.00
0068 705-06-00200 Chain Link Fence (5-Foot Height) 291      LNFT 22.50 6,547.50 10.00 2,910.00 22.00 6,402.00 25.00 7,275.00
0069 706-02-00200 Concrete Drive (6" Thick) 482.3    SQYD 45.00 21,703.50 39.00 18,809.70 48.00 23,150.40 36.00 17,362.80
0070 706-03-00100 Incidental Concrete Paving (4" Thick) 6,469.8    SQYD 30.00 194,094.00 27.00 174,684.60 43.00 278,201.40 28.50 184,389.30
0071 706-03-00300 Incidental Concrete Paving (6" Thick) 1,496.4    SQYD 40.00 59,856.00 35.23 52,718.17 52.00 77,812.80 36.00 53,870.40
0072 708-01-00100 Right-of-Way Monument 111      EACH 150.00 16,650.00 140.00 15,540.00 100.00 11,100.00 150.00 16,650.00
0073 708-02-00100 Right-of-Way Monument Witness Post 111      EACH 125.00 13,875.00 50.00 5,550.00 100.00 11,100.00 50.00 5,550.00
0074 709-01-00100 Steel Cattle Guard 2      EACH 15,000.00 30,000.00 13,500.00 27,000.00 12,000.00 24,000.00 3,500.00 7,000.00
0075 711-01-02020 Riprap (10 lb, 12" Thick) 75      SQYD 37.00 2,775.00 73.14 5,485.50 75.00 5,625.00 120.00 9,000.00
0076 711-01-03020 Riprap (30 lb, 18" Thick) 2,000      SQYD 56.00 112,000.00 60.27 120,540.00 55.00 110,000.00 85.00 170,000.00
0077 711-04-00100 Geotextile Fabric 3,210      SQYD 2.00 6,420.00 3.73 11,973.30 2.50 8,025.00 2.15 6,901.50
0078 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 3,290      SQYD 40.00 131,600.00 62.00 203,980.00 58.00 190,820.00 43.00 141,470.00
0079 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) (Paved Ditch) 955      SQYD 76.00 72,580.00 96.27 91,937.85 46.00 43,930.00 45.00 42,975.00
0080 712-04-00100 Flexible Revetment 1,050      SQYD 74.00 77,700.00 53.00 55,650.00 50.00 52,500.00 83.00 87,150.00
0081 713-01-00100 Temporary Signs and Barricades 1      LUMP 75,000.00 75,000.00 135,120.37 135,120.37 190,000.00 190,000.00 100,000.00 100,000.00
0082 713-04-01020 Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 6.216  MILE 5,500.00 34,188.00 5,689.23 35,364.25 5,500.00 34,188.00 7,600.00 47,241.60
0083 716-01-00100 Mulch (Vegetative) 867.8    TON 425.00 368,815.00 425.00 368,815.00 430.00 373,154.00 440.00 381,832.00
0084 717-01-00100 Seeding 12,993      LB 8.00 103,944.00 7.90 102,644.70 8.00 103,944.00 8.00 103,944.00
0085 718-01-00100 Fertilizer 435,890      LB 0.40 174,356.00 0.40 174,356.00 0.40 174,356.00 0.45 196,150.50
0086 718-02-00100 Agricultural Lime 16.6    TON 200.00 3,320.00 200.00 3,320.00 200.00 3,320.00 210.00 3,486.00
0087 720-01-01020 Erosion Control System (Slope Protection) (Type B) 36,445      SQYD 1.10 40,089.50 1.10 40,089.50 1.10 40,089.50 1.15 41,911.75
0088 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 555      SQYD 1.60 888.00 1.60 888.00 1.60 888.00 1.65 915.75
0089 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 4,561      SQYD 1.60 7,297.60 1.60 7,297.60 1.60 7,297.60 1.70 7,753.70
0090 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 30,000.00 30,000.00 23,650.59 23,650.59 48,000.00 48,000.00 75,000.00 75,000.00
0091 725-01-00100 Temporary Detour Roads 4,054.7    SQYD 57.00 231,117.90 40.22 163,080.03 50.00 202,735.00 60.00 243,282.00
0092 726-01-00100 Bedding Material 649.4    CUYD 57.00 37,015.80 68.48 44,470.91 100.00 64,940.00 90.00 58,446.00
0093 727-01-00100 Mobilization 1      LUMP 4,050,000.00 4,050,000.00 5,004,000.00 5,004,000.00 6,000,000.00 6,000,000.00 4,500,000.00 4,500,000.00
0094 729-01-00100 Sign (Type A) 576.3    SQFT 19.00 10,949.70 19.17 11,047.67 20.00 11,526.00 20.00 11,526.00
0095 729-04-00100 Sign (Type D) 1,197.5    SQFT 24.00 28,740.00 24.22 29,003.45 24.00 28,740.00 25.00 29,937.50
0096 729-05-00100 Sign (Type E) 100      SQFT 30.00 3,000.00 30.27 3,027.00 30.00 3,000.00 31.00 3,100.00
0097 729-06-00100 Sign (Overhead Mounted) 136.5    SQFT 27.00 3,685.50 27.24 3,718.26 27.00 3,685.50 30.00 4,095.00
0098 729-08-00100 Mounting (2 1/2" Size Post) 18      EACH 765.00 13,770.00 771.92 13,894.56 770.00 13,860.00 775.00 13,950.00
0099 729-08-00200 Mounting (3 1/2" Size Post) 20      EACH 900.00 18,000.00 908.15 18,163.00 900.00 18,000.00 925.00 18,500.00
0100 729-08-00600 Mounting (W6 x 12 Size Post) 14      EACH 950.00 13,300.00 958.60 13,420.40 950.00 13,300.00 970.00 13,580.00
0101 729-08-00700 Mounting (W8 x 18 Size Post) 4      EACH 1,450.00 5,800.00 1,463.12 5,852.48 1,450.00 5,800.00 1,500.00 6,000.00
0102 729-08-00800 Mounting (W8 x 24 Size Post) 3      EACH 1,775.00 5,325.00 1,791.07 5,373.21 1,800.00 5,400.00 2,000.00 6,000.00
0103 729-08-00900 Mounting (W10 x 33 Size Post) 4      EACH 2,400.00 9,600.00 2,421.72 9,686.88 2,400.00 9,600.00 2,700.00 10,800.00
0104 729-13-00100 Mounting (Bridge Fascia Mounted) 2      EACH 6,000.00 12,000.00 6,054.31 12,108.62 6,000.00 12,000.00 6,500.00 13,000.00
0105 729-16-00200 Object Marker Assembly (Type 2) 32      EACH 62.00 1,984.00 62.00 1,984.00 65.00 2,080.00 65.00 2,080.00
0106 729-16-00300 Object Marker Assembly (Type 3) 24      EACH 70.00 1,680.00 70.00 1,680.00 70.00 1,680.00 75.00 1,800.00
0107 729-17-00100 Milepost Assembly (Ground Mounted) 12      EACH 320.00 3,840.00 322.90 3,874.80 320.00 3,840.00 340.00 4,080.00
0108 729-19-00100 Dead End Road Installations (Type A) 2      EACH 1,200.00 2,400.00 1,210.86 2,421.72 1,200.00 2,400.00 1,300.00 2,600.00
0109 731-01-00100 Nonreflectorized Raised Pavement Markers 1,256      EACH 10.00 12,560.00 10.34 12,987.04 10.00 12,560.00 10.00 12,560.00
0110 731-02-00100 Reflectorized Raised Pavement Markers 2,809      EACH 5.00 14,045.00 5.17 14,522.53 5.00 14,045.00 5.25 14,747.25
0111 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 2,118      LNFT 3.00 6,354.00 3.10 6,565.80 3.00 6,354.00 4.50 9,531.00
0112 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.179  MILE 2,400.00 74,829.60 2,480.98 77,354.48 2,400.00 74,829.60 2,500.00 77,947.50
0113 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.526  MILE 4,250.00 2,235.50 4,445.08 2,338.11 4,400.00 2,314.40 6,500.00 3,419.00
0114 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4      EACH 180.00 720.00 186.07 744.28 180.00 720.00 215.00 860.00
0115 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 2      EACH 190.00 380.00 196.41 392.82 200.00 400.00 225.00 450.00
0116 735-01-00100 Mailboxes 15      EACH 10.00 150.00 13.12 196.80 1.00 15.00 135.00 2,025.00
0117 735-02-00100 Mailbox Supports (Single) 15      EACH 125.00 1,875.00 133.19 1,997.85 150.00 2,250.00 150.00 2,250.00
0118 740-01-00100 Construction Layout 1      LUMP 500,000.00 500,000.00 375,389.37 375,389.37 400,000.00 400,000.00 700,000.00 700,000.00
0119 805-01-00300 Class A Concrete (Box Culvert Headwalls) 131.72   CUYD 875.00 115,255.00 947.10 124,752.01 700.00 92,204.00 1,100.00 144,892.00
0120 805-01-00700 Class A Concrete (Bents) 3,349.13   CUYD 525.00 1,758,293.25 570.00 1,909,004.10 550.00 1,842,021.50 550.00 1,842,021.50
0121 805-03-00100 Class AA Concrete 972.75   CUYD 425.00 413,418.75 570.00 554,467.50 550.00 535,012.50 450.00 437,737.50
0122 805-04-00100 Class AA(M) Concrete 6,563.76   CUYD 500.00 3,281,880.00 250.00 1,640,940.00 300.00 1,969,128.00 485.00 3,183,423.60
0123 805-08-00400 Precast-Prestressed Concrete Girder (Type IV) 22,322.6    LNFT 100.00 2,232,260.00 110.00 2,455,486.00 110.00 2,455,486.00 100.00 2,232,260.00
0124 805-08-00700 Precast-Prestressed Concrete Girder (Type BT-72) 2,490.3    LNFT 150.00 373,545.00 170.00 423,351.00 160.00 398,448.00 145.00 361,093.50
0125 805-11-00100 Strip Seal Joints 1,113.68   LNFT 120.00 133,641.60 165.00 183,757.20 160.00 178,188.80 160.00 178,188.80
0127 806-01-00100 Deformed Reinforcing Steel 1,127,906      LB 0.80 902,324.80 0.78 879,766.68 0.78 879,766.68 0.65 733,138.90
0128 806-02-00100 Deformed Reinforcing Steel (Epoxy Coated) 2,130,723      LB 0.90 1,917,650.70 0.86 1,832,421.78 0.86 1,832,421.78 0.80 1,704,578.40
0129 807-08-00100 Structural Metalwork 1      LUMP 1,625,000.00 1,625,000.00 2,200,000.00 2,200,000.00 1,400,000.00 1,400,000.00 1,350,000.00 1,350,000.00
0130 810-01-00100 Concrete Railing (Standard Barrier) 8,446.66   LNFT 38.00 320,973.08 60.00 506,799.60 55.00 464,566.30 42.00 354,759.72
0131 810-01-00200 Concrete Railing (Slotted Barrier) 3,565      LNFT 45.00 160,425.00 62.00 221,030.00 57.00 203,205.00 45.00 160,425.00
0132 813-01-00100 Concrete Approach Slabs 3,339.3    SQYD 170.00 567,681.00 200.00 667,860.00 200.00 667,860.00 135.00 450,805.50
0133 814-01-00200 Drilled Shaft (24" Diameter) 680      LNFT 215.00 146,200.00 200.00 136,000.00 200.00 136,000.00 220.00 149,600.00
0134 814-01-00650 Drilled Shaft (54" Diameter) 195      LNFT 360.00 70,200.00 370.00 72,150.00 360.00 70,200.00 350.00 68,250.00
0135 814-01-00700 Drilled Shaft (60" Diameter) 375      LNFT 380.00 142,500.00 390.00 146,250.00 380.00 142,500.00 360.00 135,000.00
0136 814-01-00800 Drilled Shaft (66" Diameter) 10,440      LNFT 410.00 4,280,400.00 390.00 4,071,600.00 380.00 3,967,200.00 375.00 3,915,000.00
0137 814-02-00800 Trial Shaft (66" Diameter) 95      LNFT 430.00 40,850.00 360.00 34,200.00 360.00 34,200.00 400.00 38,000.00
0138 814-03-00800 Permanent Casing (66" Diameter) 100      LNFT 200.00 20,000.00 350.00 35,000.00 350.00 35,000.00 220.00 22,000.00
0139 814-04-00650 Crosshole Sonic Logging (54" Diameter) 6      EACH 3,200.00 19,200.00 1,500.00 9,000.00 1,500.00 9,000.00 1,050.00 6,300.00
0140 814-04-00700 Crosshole Sonic Logging (60" Diameter) 9      EACH 3,200.00 28,800.00 1,500.00 13,500.00 1,500.00 13,500.00 1,050.00 9,450.00
0141 814-04-00800 Crosshole Sonic Logging (66" Diameter) 170      EACH 3,200.00 544,000.00 1,500.00 255,000.00 1,500.00 255,000.00 1,050.00 178,500.00
0142 NS-800-00060 Deck Drainage System 1      LUMP 38,000.00 38,000.00 40,000.00 40,000.00 40,000.00 40,000.00 33,000.00 33,000.00
0143 NS-800-00100 Load Testing a Drilled Shaft 4      EACH 90,000.00 360,000.00 100,000.00 400,000.00 100,000.00 400,000.00 26,000.00 104,000.00
0144 NS-800-00120 Pier Protection System (Vehicle) 4      EACH 50,000.00 200,000.00 40,000.00 160,000.00 40,000.00 160,000.00 63,000.00 252,000.00
0145 NS-800-00140 Test Drilled Shaft 66" Diameter 4      EACH 55,000.00 220,000.00 50,000.00 200,000.00 50,000.00 200,000.00 28,000.00 112,000.00
0165 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 565.2    CUYD 80.00 45,216.00 70.02 39,575.30 80.00 45,216.00 80.00 45,216.00
0166 711-01-05000 Riprap (130 lb, 24" Thick) 1,135      SQYD 77.00 87,395.00 82.70 93,864.50 90.00 102,150.00 115.00 130,525.00
0167 805-12-26000 Reinforced Concrete Box Culverts (10' x 10') (Precast) 1,932      LNFT 540.00 1,043,280.00 680.00 1,313,760.00 750.00 1,449,000.00 750.00 1,449,000.00
0168 NS-MSC-00120 Drainage Structure (MANHOLE) (MH-12.5' x 9') 1      EACH 8,550.00 8,550.00 10,578.50 10,578.50 12,000.00 12,000.00 12,657.37 12,657.37
0169 703-02-00100 Shoulder Outlet Underdrains 32      EACH 650.00 20,800.00 465.52 14,896.64 400.00 12,800.00 250.00 8,000.00
    SUBTOTAL GENERAL       49,855,490   53,866,777   53,328,884   52,926,226
                         
  Alternate AA1                      
                         
0146 502-01-00100 Superpave Asphaltic Concrete 7,371.2    TON 115.00 847,688.00 115.00 847,688.00 120.00 884,544.00 120.00 884,544.00
0147 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 830.8    TON 200.00 166,160.00 200.00 166,160.00 200.00 166,160.00 210.00 174,468.00
0148 601-01-00700 Portland Cement Concrete Pavement (11" Thick) 180,217.8    SQYD 45.00 8,109,801.00 36.00 6,487,840.80 40.00 7,208,712.00 43.95 7,920,572.31
0149 601-04-00100 Portland Cement Concrete Pavement Coring 284      EACH 80.00 22,720.00 80.00 22,720.00 80.00 22,720.00 115.00 32,660.00
0150 707-01-00300 Concrete Curb (Mountable) 1,169.7    LNFT 20.00 23,394.00 7.00 8,187.90 16.00 18,715.20 4.00 4,678.80
0151 707-03-00100 Combination Concrete Curb and Gutter 5,639.9    LNFT 18.00 101,518.20 14.75 83,188.53 23.00 129,717.70 12.50 70,498.75
0152 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.776  MILE 800.00 620.80 827.00 641.75 800.00 620.80 850.00 659.60
0153 732-03-03000 Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) 11.72   MILE 3,000.00 35,160.00 3,049.53 35,740.49 3,000.00 35,160.00 400.00 4,688.00
0154 NS-DEV-60302 NS Roller Compacted Concrete (RCC) Pavement (8" Thick) 78,041      SQYD 20.00 1,560,820.00 24.00 1,872,984.00 25.00 1,951,025.00 26.95 2,103,204.95
    SUBTOTAL ALT AA1       10,867,882   9,525,151   10,417,375   11,195,974
                         
  Alternate AA2                      
                         
0155 502-01-00100 Superpave Asphaltic Concrete 148,821.8    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0156 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 2,516.1    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0157 707-03-00100 Combination Concrete Curb and Gutter 6,809.6    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0158 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 12.496  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0159 NS-724-00002 Rumble Strips (Shoulder Ground-In) 20.8    MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
    SUBTOTAL ALT AA2       0.00   0.00   0.00   0.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       60,723,371.65   63,391,928.91   63,746,259.08   64,122,200.00
    NUMBER OF DAYS BID AT $3000 PER DAY.       2,637,000.00   2,370,000.00   2,400,000.00   2,550,000.00
    LIFE CYCLE COST       1,503,300.00   1,503,300.00   1,503,300.00   1,503,300.00
    TOTAL BID       64,863,671.65   67,265,228.91   67,649,559.08   68,175,500.00



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Best-Yet Builders, LLC
- 6 -
Gilchrist Construction Co. LLC
 
Hill Brothers Construction Co., Inc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 508,000.00 508,000.00 1,300,000.00 1,300,000.00 3,000,000.00 3,000,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 225,000.00 225,000.00 95,000.00 95,000.00 300,000.00 300,000.00
0003 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Lt. Sta. 121+40) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0004 202-02-00010 Removal of Brick Veneer House on Slab (Lt. Sta. 121+00, 2816 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1,200.00 1,200.00
0005 202-02-00010 Removal of Metal Pump House on Pier (Lt. Sta. 122+00, 36 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0006 202-02-00010 Removal of Metal Storage Shed on Dirt (Lt. Sta. 174+00, 208 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1,200.00 1,200.00
0007 202-02-00010 Removal of Wood Frame Garage on Dirt (Rt. Sta. 122+05, 500 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0008 202-02-00010 Removal of Brick Veneer House on Slab (Lt. Sta. 121+60, 1300 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 600.00 600.00
0009 202-02-00010 Removal of Metal Pump House on Dirt (Rt. Sta. 122+00, 22 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0010 202-02-00010 Removal of Metal Storage Building on Pier (Lt. Sta. 122+00, 30 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0011 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Rt. Sta. 121+00, 18 x 32 x 4) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0012 202-02-00010 Removal of Wood Frame Garage on Slab (Rt. Sta. 122+00, 720 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 600.00 600.00
0013 202-02-00010 Removal of Wood Frame Shop Building on Slab (Lt. Sta. 108+50, 2743 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1,200.00 1,200.00
0014 202-02-00010 Removal of Above Ground Swimming Pool w/Deck (Lt. Sta. 109+15, 20 x 32) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0015 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 120+65, 2000 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1,200.00 1,200.00
0016 202-02-00010 Removal of Wood Frame Shed on Slab (Rt. Sta. 100+50, 16 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00
0017 202-02-00010 Removal of Masonry Storage Building on Slab (Rt. Sta. 31+50, 49 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 300.00 300.00
0018 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 31+40, 1461 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 3,000.00 3,000.00
0019 202-02-00010 Removal of Brick Veneer House on Slab (Rt. Sta. 100+50, 1634 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 3,000.00 3,000.00
0020 202-02-00010 Removal of Wood Frame Storage Building on Dirt (Lt. Sta. 110+50, 200 Sq. Ft.) 1      EACH 1.00 1.00 100.00 100.00 1,200.00 1,200.00
0021 202-02-38500 Removal of Surfacing and Stablized Base 21,895.8    SQYD 3.00 65,687.40 4.00 87,583.20 5.50 120,426.90
0022 202-07-00100 Plugging Existing Water Wells 3      EACH 2,000.00 6,000.00 7,000.00 21,000.00 3,000.00 9,000.00
0023 203-01-00100 General Excavation 886,436      CUYD 2.50 2,216,090.00 2.00 1,772,872.00 3.00 2,659,308.00
0024 203-02-00100 Drainage Excavation 17,972      CUYD 6.50 116,818.00 8.00 143,776.00 8.00 143,776.00
0025 203-03-00100 Embankment 2,422,899      CUYD 5.00 12,114,495.00 6.30 15,264,263.70 5.50 13,325,944.50
0026 203-04-00300 Nonplastic Embankment (Stone) 241      CUYD 50.00 12,050.00 300.00 72,300.00 80.00 19,280.00
0027 204-02-00100 Temporary Hay or Straw Bales 91      EACH 10.00 910.00 25.00 2,275.00 15.00 1,365.00
0028 204-05-00100 Temporary Sediment Check Dams (Hay) 159      EACH 100.00 15,900.00 200.00 31,800.00 100.00 15,900.00
0029 204-05-00200 Temporary Sediment Check Dams (Stone) 111      EACH 250.00 27,750.00 500.00 55,500.00 850.00 94,350.00
0030 204-06-00100 Temporary Silt Fencing 74,365      LNFT 1.20 89,238.00 1.50 111,547.50 3.00 223,095.00
0031 204-07-00100 Temporary Stone Construction Entrance 3      EACH 1,000.00 3,000.00 5,000.00 15,000.00 5,500.00 16,500.00
0032 302-01-00200 Class II Base Course (Soil Cement) 2,412.4    CUYD 20.00 48,248.00 41.00 98,908.40 35.00 84,434.00
0033 302-02-01040 Class II Base Course (4" Thick) (Stone) 38,948.7    SQYD 8.50 331,063.95 9.50 370,012.65 10.00 389,487.00
0034 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 181,140.2    SQYD 8.50 1,539,691.70 8.80 1,594,033.76 10.00 1,811,402.00
0035 302-02-01560 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete) 917.8    SQYD 12.00 11,013.60 18.00 16,520.40 13.00 11,931.40
0036 302-02-02020 Class II Base Course (6" Thick) (Soil Cement) 295,399.5    SQYD 4.30 1,270,217.85 7.00 2,067,796.50 8.00 2,363,196.00
0037 302-02-02560 Class II Base Course (7" Thick) (Stone or Recycled Portland Cement Concrete) 76,013.6    SQYD 15.65 1,189,612.84 15.00 1,140,204.00 17.50 1,330,238.00
0038 302-02-04500 Class II Base Course (9" Thick) (Stone or Recycled Portland Cement Concrete) 557.2    SQYD 21.50 11,979.80 30.00 16,716.00 22.50 12,537.00
0039 305-01-04000 Subgrade Layer (12" Thick) 260,016      SQYD 6.50 1,690,104.00 8.30 2,158,132.80 7.35 1,911,117.60
0040 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 140.5    CUYD 75.00 10,537.50 80.00 11,240.00 100.00 14,050.00
0041 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 200      CUYD 25.00 5,000.00 80.00 16,000.00 100.00 20,000.00
0042 502-01-00100 Superpave Asphaltic Concrete 64.2    TON 200.00 12,840.00 230.00 14,766.00 210.00 13,482.00
0043 701-01-01000 Cross Drain Pipe (24" RCP/PP) (Type 3 Joints) 326      LNFT 53.34 17,388.84 78.00 25,428.00 75.00 24,450.00
0044 701-01-01020 Cross Drain Pipe (30" RCP/PP) (Type 3 Joints) 598      LNFT 75.45 45,119.10 78.00 46,644.00 95.00 56,810.00
0045 701-03-01020 Storm Drain Pipe (18" RCP/PP) 200      LNFT 31.65 6,330.00 60.76 12,152.00 60.00 12,000.00
0046 701-03-01040 Storm Drain Pipe (24" RCP/PP) 830      LNFT 53.34 44,272.20 62.00 51,460.00 75.00 62,250.00
0047 701-03-01060 Storm Drain Pipe (30" RCP/PP) 148      LNFT 75.45 11,166.60 72.00 10,656.00 95.00 14,060.00
0048 701-03-01080 Storm Drain Pipe (36" RCP/PP) 459      LNFT 103.80 47,644.20 100.00 45,900.00 120.00 55,080.00
0049 701-03-01120 Storm Drain Pipe (54" RCP) 595      LNFT 245.37 145,995.15 185.00 110,075.00 215.00 127,925.00
0050 701-03-01140 Storm Drain Pipe (60" RCP) 427      LNFT 292.35 124,833.45 230.00 98,210.00 255.00 108,885.00
0051 701-03-01200 Storm Drain Pipe (96" RCP) 402      LNFT 672.72 270,433.44 375.00 150,750.00 500.00 201,000.00
0052 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) (Type 1 Joints) 578      LNFT 31.65 18,293.70 45.00 26,010.00 60.00 34,680.00
0053 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) (Type 1 Joints) 270      LNFT 53.34 14,401.80 48.00 12,960.00 75.00 20,250.00
0054 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 68      LNFT 75.45 5,130.60 65.00 4,420.00 95.00 6,460.00
0055 701-05-01100 Side Drain Pipe (36" RCP/PP/CMP) 126      LNFT 103.80 13,078.80 75.00 9,450.00 120.00 15,120.00
0056 702-02-00100 Manholes (MH-06) 1      EACH 7,500.00 7,500.00 10,000.00 10,000.00 11,500.00 11,500.00
0057 702-03-00100 Catch Basins (CB-01) 9      EACH 1,500.00 13,500.00 2,000.00 18,000.00 4,250.00 38,250.00
0058 702-03-00200 Catch Basins (CB-02) 3      EACH 2,000.00 6,000.00 3,700.00 11,100.00 4,500.00 13,500.00
0059 703-01-00100 Shoulder Underdrain Systems 7,673      LNFT 20.00 153,460.00 12.00 92,076.00 18.00 138,114.00
0060 704-03-00100 Blocked Out Guard Rail 2,437.5    LNFT 20.00 48,750.00 20.00 48,750.00 17.00 41,437.50
0061 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 660      LNFT 65.00 42,900.00 62.00 40,920.00 56.00 36,960.00
0062 704-11-00100 Guard Rail End Treatment (Flared) 22      EACH 2,200.00 48,400.00 2,200.00 48,400.00 2,050.00 45,100.00
0063 704-11-00300 Guard Rail End Treatment (Bi-Directional) 2      EACH 5,400.00 10,800.00 5,100.00 10,200.00 4,725.00 9,450.00
0064 705-01-00100 Barbed Wire Fence 848      LNFT 5.00 4,240.00 2.80 2,374.40 5.25 4,452.00
0065 705-02-00100 Combination Mesh & Barbed Wire Fence 57,733      LNFT 6.25 360,831.25 3.80 219,385.40 5.35 308,871.55
0066 705-04-00100 Single Swinging Driveway Gates 2      EACH 600.00 1,200.00 575.00 1,150.00 600.00 1,200.00
0067 705-05-00100 Double Swinging Driveway Gates 2      DBGT 800.00 1,600.00 980.00 1,960.00 785.00 1,570.00
0068 705-06-00200 Chain Link Fence (5-Foot Height) 291      LNFT 15.00 4,365.00 11.50 3,346.50 23.50 6,838.50
0069 706-02-00200 Concrete Drive (6" Thick) 482.3    SQYD 50.00 24,115.00 39.00 18,809.70 41.00 19,774.30
0070 706-03-00100 Incidental Concrete Paving (4" Thick) 6,469.8    SQYD 45.00 291,141.00 30.00 194,094.00 28.50 184,389.30
0071 706-03-00300 Incidental Concrete Paving (6" Thick) 1,496.4    SQYD 55.00 82,302.00 38.00 56,863.20 35.00 52,374.00
0072 708-01-00100 Right-of-Way Monument 111      EACH 187.50 20,812.50 345.00 38,295.00 120.00 13,320.00
0073 708-02-00100 Right-of-Way Monument Witness Post 111      EACH 187.50 20,812.50 345.00 38,295.00 60.00 6,660.00
0074 709-01-00100 Steel Cattle Guard 2      EACH 5,000.00 10,000.00 18,000.00 36,000.00 5,500.00 11,000.00
0075 711-01-02020 Riprap (10 lb, 12" Thick) 75      SQYD 50.00 3,750.00 50.00 3,750.00 40.00 3,000.00
0076 711-01-03020 Riprap (30 lb, 18" Thick) 2,000      SQYD 50.00 100,000.00 50.00 100,000.00 39.00 78,000.00
0077 711-04-00100 Geotextile Fabric 3,210      SQYD 2.25 7,222.50 2.25 7,222.50 2.90 9,309.00
0078 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 3,290      SQYD 75.00 246,750.00 45.50 149,695.00 71.00 233,590.00
0079 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) (Paved Ditch) 955      SQYD 65.00 62,075.00 48.00 45,840.00 62.00 59,210.00
0080 712-04-00100 Flexible Revetment 1,050      SQYD 63.00 66,150.00 50.00 52,500.00 64.00 67,200.00
0081 713-01-00100 Temporary Signs and Barricades 1      LUMP 240,000.00 240,000.00 300,000.00 300,000.00 65,000.00 65,000.00
0082 713-04-01020 Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 6.216  MILE 7,500.00 46,620.00 6,500.00 40,404.00 7,850.00 48,795.60
0083 716-01-00100 Mulch (Vegetative) 867.8    TON 500.00 433,900.00 440.00 381,832.00 450.00 390,510.00
0084 717-01-00100 Seeding 12,993      LB 6.25 81,206.25 7.00 90,951.00 8.30 107,841.90
0085 718-01-00100 Fertilizer 435,890      LB 0.35 152,561.50 0.40 174,356.00 0.42 183,073.80
0086 718-02-00100 Agricultural Lime 16.6    TON 120.00 1,992.00 200.00 3,320.00 210.00 3,486.00
0087 720-01-01020 Erosion Control System (Slope Protection) (Type B) 36,445      SQYD 1.20 43,734.00 1.14 41,547.30 1.15 41,911.75
0088 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 555      SQYD 1.20 666.00 1.75 971.25 1.65 915.75
0089 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 4,561      SQYD 1.20 5,473.20 1.75 7,981.75 1.65 7,525.65
0090 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 15,000.00 15,000.00 60,000.00 60,000.00 30,000.00 30,000.00
0091 725-01-00100 Temporary Detour Roads 4,054.7    SQYD 40.00 162,188.00 85.00 344,649.50 45.00 182,461.50
0092 726-01-00100 Bedding Material 649.4    CUYD 60.00 38,964.00 95.00 61,693.00 100.00 64,940.00
0093 727-01-00100 Mobilization 1      LUMP 5,750,000.00 5,750,000.00 5,000,000.00 5,000,000.00 4,000,000.00 4,000,000.00
0094 729-01-00100 Sign (Type A) 576.3    SQFT 28.00 16,136.40 20.00 11,526.00 20.00 11,526.00
0095 729-04-00100 Sign (Type D) 1,197.5    SQFT 31.00 37,122.50 25.00 29,937.50 25.00 29,937.50
0096 729-05-00100 Sign (Type E) 100      SQFT 30.00 3,000.00 34.00 3,400.00 31.00 3,100.00
0097 729-06-00100 Sign (Overhead Mounted) 136.5    SQFT 30.00 4,095.00 30.00 4,095.00 28.00 3,822.00
0098 729-08-00100 Mounting (2 1/2" Size Post) 18      EACH 950.00 17,100.00 880.00 15,840.00 800.00 14,400.00
0099 729-08-00200 Mounting (3 1/2" Size Post) 20      EACH 1,100.00 22,000.00 1,000.00 20,000.00 945.00 18,900.00
0100 729-08-00600 Mounting (W6 x 12 Size Post) 14      EACH 1,500.00 21,000.00 1,000.00 14,000.00 1,000.00 14,000.00
0101 729-08-00700 Mounting (W8 x 18 Size Post) 4      EACH 1,800.00 7,200.00 1,600.00 6,400.00 1,525.00 6,100.00
0102 729-08-00800 Mounting (W8 x 24 Size Post) 3      EACH 2,200.00 6,600.00 2,000.00 6,000.00 1,865.00 5,595.00
0103 729-08-00900 Mounting (W10 x 33 Size Post) 4      EACH 2,800.00 11,200.00 2,700.00 10,800.00 2,600.00 10,400.00
0104 729-13-00100 Mounting (Bridge Fascia Mounted) 2      EACH 9,500.00 19,000.00 6,900.00 13,800.00 6,300.00 12,600.00
0105 729-16-00200 Object Marker Assembly (Type 2) 32      EACH 65.00 2,080.00 70.00 2,240.00 65.00 2,080.00
0106 729-16-00300 Object Marker Assembly (Type 3) 24      EACH 100.00 2,400.00 80.00 1,920.00 73.00 1,752.00
0107 729-17-00100 Milepost Assembly (Ground Mounted) 12      EACH 400.00 4,800.00 360.00 4,320.00 335.00 4,020.00
0108 729-19-00100 Dead End Road Installations (Type A) 2      EACH 2,000.00 4,000.00 1,300.00 2,600.00 1,250.00 2,500.00
0109 731-01-00100 Nonreflectorized Raised Pavement Markers 1,256      EACH 10.00 12,560.00 11.00 13,816.00 10.50 13,188.00
0110 731-02-00100 Reflectorized Raised Pavement Markers 2,809      EACH 5.25 14,747.25 5.75 16,151.75 5.50 15,449.50
0111 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 2,118      LNFT 4.50 9,531.00 3.40 7,201.20 4.75 10,060.50
0112 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.179  MILE 2,500.00 77,947.50 2,600.00 81,065.40 2,625.00 81,844.88
0113 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.526  MILE 6,500.00 3,419.00 5,000.00 2,630.00 6,825.00 3,589.95
0114 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4      EACH 215.00 860.00 200.00 800.00 225.00 900.00
0115 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 2      EACH 225.00 450.00 250.00 500.00 235.00 470.00
0116 735-01-00100 Mailboxes 15      EACH 50.00 750.00 15.00 225.00 14.00 210.00
0117 735-02-00100 Mailbox Supports (Single) 15      EACH 75.00 1,125.00 150.00 2,250.00 140.00 2,100.00
0118 740-01-00100 Construction Layout 1      LUMP 1,000,000.00 1,000,000.00 300,000.00 300,000.00 800,000.00 800,000.00
0119 805-01-00300 Class A Concrete (Box Culvert Headwalls) 131.72   CUYD 800.00 105,376.00 1,500.00 197,580.00 1,500.00 197,580.00
0120 805-01-00700 Class A Concrete (Bents) 3,349.13   CUYD 800.00 2,679,304.00 735.00 2,461,610.55 600.00 2,009,478.00
0121 805-03-00100 Class AA Concrete 972.75   CUYD 600.00 583,650.00 740.00 719,835.00 600.00 583,650.00
0122 805-04-00100 Class AA(M) Concrete 6,563.76   CUYD 650.00 4,266,444.00 620.00 4,069,531.20 550.00 3,610,068.00
0123 805-08-00400 Precast-Prestressed Concrete Girder (Type IV) 22,322.6    LNFT 120.00 2,678,712.00 100.00 2,232,260.00 115.00 2,567,099.00
0124 805-08-00700 Precast-Prestressed Concrete Girder (Type BT-72) 2,490.3    LNFT 165.00 410,899.50 155.00 385,996.50 160.00 398,448.00
0125 805-11-00100 Strip Seal Joints 1,113.68   LNFT 275.00 306,262.00 135.00 150,346.80 275.00 306,262.00
0127 806-01-00100 Deformed Reinforcing Steel 1,127,906      LB 0.80 902,324.80 0.70 789,534.20 0.80 902,324.80
0128 806-02-00100 Deformed Reinforcing Steel (Epoxy Coated) 2,130,723      LB 0.90 1,917,650.70 0.80 1,704,578.40 0.90 1,917,650.70
0129 807-08-00100 Structural Metalwork 1      LUMP 2,000,000.00 2,000,000.00 1,300,000.00 1,300,000.00 1,750,000.00 1,750,000.00
0130 810-01-00100 Concrete Railing (Standard Barrier) 8,446.66   LNFT 55.00 464,566.30 60.00 506,799.60 47.00 396,993.02
0131 810-01-00200 Concrete Railing (Slotted Barrier) 3,565      LNFT 55.00 196,075.00 60.00 213,900.00 49.00 174,685.00
0132 813-01-00100 Concrete Approach Slabs 3,339.3    SQYD 200.00 667,860.00 210.00 701,253.00 205.00 684,556.50
0133 814-01-00200 Drilled Shaft (24" Diameter) 680      LNFT 225.00 153,000.00 220.00 149,600.00 220.00 149,600.00
0134 814-01-00650 Drilled Shaft (54" Diameter) 195      LNFT 375.00 73,125.00 400.00 78,000.00 350.00 68,250.00
0135 814-01-00700 Drilled Shaft (60" Diameter) 375      LNFT 400.00 150,000.00 450.00 168,750.00 395.00 148,125.00
0136 814-01-00800 Drilled Shaft (66" Diameter) 10,440      LNFT 650.00 6,786,000.00 410.00 4,280,400.00 465.00 4,854,600.00
0137 814-02-00800 Trial Shaft (66" Diameter) 95      LNFT 500.00 47,500.00 335.00 31,825.00 475.00 45,125.00
0138 814-03-00800 Permanent Casing (66" Diameter) 100      LNFT 225.00 22,500.00 220.00 22,000.00 205.00 20,500.00
0139 814-04-00650 Crosshole Sonic Logging (54" Diameter) 6      EACH 900.00 5,400.00 900.00 5,400.00 850.00 5,100.00
0140 814-04-00700 Crosshole Sonic Logging (60" Diameter) 9      EACH 900.00 8,100.00 900.00 8,100.00 850.00 7,650.00
0141 814-04-00800 Crosshole Sonic Logging (66" Diameter) 170      EACH 1,500.00 255,000.00 900.00 153,000.00 850.00 144,500.00
0142 NS-800-00060 Deck Drainage System 1      LUMP 35,000.00 35,000.00 13,000.00 13,000.00 35,000.00 35,000.00
0143 NS-800-00100 Load Testing a Drilled Shaft 4      EACH 150,000.00 600,000.00 100,000.00 400,000.00 100,000.00 400,000.00
0144 NS-800-00120 Pier Protection System (Vehicle) 4      EACH 36,000.00 144,000.00 26,000.00 104,000.00 36,000.00 144,000.00
0145 NS-800-00140 Test Drilled Shaft 66" Diameter 4      EACH 100,000.00 400,000.00 45,000.00 180,000.00 42,000.00 168,000.00
0165 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 565.2    CUYD 20.00 11,304.00 85.00 48,042.00 25.00 14,130.00
0166 711-01-05000 Riprap (130 lb, 24" Thick) 1,135      SQYD 300.00 340,500.00 63.00 71,505.00 52.00 59,020.00
0167 805-12-26000 Reinforced Concrete Box Culverts (10' x 10') (Precast) 1,932      LNFT 825.00 1,593,900.00 600.00 1,159,200.00 725.00 1,400,700.00
0168 NS-MSC-00120 Drainage Structure (MANHOLE) (MH-12.5' x 9') 1      EACH 10,000.00 10,000.00 22,000.00 22,000.00 35,000.00 35,000.00
0169 703-02-00100 Shoulder Outlet Underdrains 32      EACH 200.00 6,400.00 425.00 13,600.00 450.00 14,400.00
    SUBTOTAL GENERAL       60,016,312   57,753,061   59,445,871
                     
  Alternate AA1                  
                     
0146 502-01-00100 Superpave Asphaltic Concrete 7,371.2    TON 110.00 810,832.00 120.00 884,544.00 115.00 847,688.00
0147 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 830.8    TON 110.00 91,388.00 215.00 178,622.00 115.00 95,542.00
0148 601-01-00700 Portland Cement Concrete Pavement (11" Thick) 180,217.8    SQYD 30.00 5,406,534.00 39.00 7,028,494.20 37.00 6,668,058.60
0149 601-04-00100 Portland Cement Concrete Pavement Coring 284      EACH 100.00 28,400.00 200.00 56,800.00 105.00 29,820.00
0150 707-01-00300 Concrete Curb (Mountable) 1,169.7    LNFT 10.00 11,697.00 12.00 14,036.40 10.50 12,281.85
0151 707-03-00100 Combination Concrete Curb and Gutter 5,639.9    LNFT 20.00 112,798.00 13.00 73,318.70 15.50 87,418.45
0152 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.776  MILE 850.00 659.60 1,000.00 776.00 890.00 690.64
0153 732-03-03000 Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) 11.72   MILE 4,000.00 46,880.00 3,500.00 41,020.00 4,200.00 49,224.00
0154 NS-DEV-60302 NS Roller Compacted Concrete (RCC) Pavement (8" Thick) 78,041      SQYD 16.00 1,248,656.00 25.00 1,951,025.00 22.50 1,755,922.50
    SUBTOTAL ALT AA1       7,757,845   10,228,636   9,546,646
                     
  Alternate AA2                  
                     
0155 502-01-00100 Superpave Asphaltic Concrete 148,821.8    TON 0.00 0.00 0.00 0.00 0.00 0.00
0156 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 2,516.1    TON 0.00 0.00 0.00 0.00 0.00 0.00
0157 707-03-00100 Combination Concrete Curb and Gutter 6,809.6    LNFT 0.00 0.00 0.00 0.00 0.00 0.00
0158 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 12.496  MILE 0.00 0.00 0.00 0.00 0.00 0.00
0159 NS-724-00002 Rumble Strips (Shoulder Ground-In) 20.8    MILE 0.00 0.00 0.00 0.00 0.00 0.00
    SUBTOTAL ALT AA2       0.00   0.00   0.00
                     
    ITEM TOTAL (CONSTRUCTION BID)       67,774,156.77   67,981,696.81   59,445,870.85
    NUMBER OF DAYS BID AT $3000 PER DAY.       2,445,000.00   2,400,000.00   2,691,000.00
    LIFE CYCLE COST       1,503,300.00   1,503,300.00  
    TOTAL BID       71,722,456.77   71,884,996.81  