LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 454-01-0083
Parish: East Baton Rouge
Routes: I-12
Description: DRUSILLA TO MILLERVILLE
Type Const: PCC PATCHING AND RELATED WORK.
Estimated Construction Cost: $2,772,559.13


RankLicenseBidderConstruction Bid
1 49954 Plus Concrete Inc. $2,374,242.10
2 46547 Interstate Improvement, Inc. $2,623,139.05
3 36961 Cycle Construction Co. L.L.C. $2,922,554.79
4 38936 Southern Industrial Contractors Llc $3,088,671.30
5 29595 Boone Services Inc. $4,047,806.60
6 12312 Gilchrist Construction Co. LLC $4,250,528.07
7 24901 Hard Rock Construction LLC $4,280,442.75
8 21982 Forby Contracting, Inc. $4,340,859.36


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Plus Concrete Inc.
- 2 -
Interstate Improvement, Inc.
- 3 -
Cycle Construction Co. L.L.C.
- 4 -
Southern Industrial Contractors Llc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 204-02-00100 Temporary Hay or Straw Bales 50      EACH 12.00 600.00 12.00 600.00 14.00 700.00 25.00 1,250.00
0002 204-06-00100 Temporary Silt Fencing 2,000      LNFT 1.55 3,100.00 1.55 3,100.00 2.00 4,000.00 2.00 4,000.00
0003 602-02-00200 Cleaning and Resealing Existing Longitudinal Pavement Joints 180,711.6    LNFT 1.35 243,960.66 1.00 180,711.60 1.30 234,925.08 1.50 271,067.40
0004 602-02-00300 Cleaning and Resealing Existing Transverse Pavements Joints 82,091.4    LNFT 1.35 110,823.39 1.00 82,091.40 1.40 114,927.96 1.50 123,137.10
0005 602-03-00100 Cleaning and Sealing Random cracks 5,000      LNFT 3.00 15,000.00 2.75 13,750.00 1.75 8,750.00 3.50 17,500.00
0006 602-05-01360 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (14" Thick) 4,114.6    SQYD 240.00 987,504.00 323.00 1,329,015.80 298.00 1,226,150.80 235.00 966,931.00
0007 602-05-02360 Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (14" Thick) 1,729.2    SQYD 210.00 363,132.00 323.00 558,531.60 294.00 508,384.80 235.00 406,362.00
0008 602-05-03360 Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (14" Thick) 56.2    SQYD 180.00 10,116.00 323.00 18,152.60 290.00 16,298.00 350.00 19,670.00
0009 713-01-00100 Temporary Signs and Barricades 1      LUMP 150,000.00 150,000.00 113,680.00 113,680.00 138,000.00 138,000.00 485,000.00 485,000.00
0010 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1      MILE 475.00 475.00 475.00 475.00 550.50 550.50 415.00 415.00
0011 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1      MILE 550.00 550.00 550.00 550.00 637.50 637.50 600.00 600.00
0012 727-01-00100 Mobilization 1      LUMP 300,000.00 300,000.00 152,500.00 152,500.00 480,000.00 480,000.00 235,200.00 235,200.00
0013 731-02-00100 Reflectorized Raised Pavement Markers 4,235      EACH 5.25 22,233.75 5.25 22,233.75 6.00 25,410.00 4.50 19,057.50
0014 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 9,398      LNFT 1.35 12,687.30 1.35 12,687.30 1.50 14,097.00 1.10 10,337.80
0015 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 9,015      LNFT 4.50 40,567.50 4.50 40,567.50 5.25 47,328.75 5.00 45,075.00
0016 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 19.165  MILE 2,750.00 52,703.75 2,750.00 52,703.75 3,188.00 61,098.02 2,950.00 56,536.75
0017 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 18.575  MILE 850.00 15,788.75 850.00 15,788.75 985.00 18,296.38 890.00 16,531.75
0018 740-01-00100 Construction Layout 1      LUMP 36,000.00 36,000.00 5,000.00 5,000.00 12,000.00 12,000.00 400,000.00 400,000.00
0019 NS-713-00001 Dynamic Message Sign Unit 2      EACH 4,500.00 9,000.00 10,500.00 21,000.00 5,500.00 11,000.00 5,000.00 10,000.00
                         
    CONTRACTOR TOTAL       2,374,242.10   2,623,139.05   2,922,554.79   3,088,671.30



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Boone Services Inc.
- 6 -
Gilchrist Construction Co. LLC
- 7 -
Hard Rock Construction LLC
- 8 -
Forby Contracting, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 204-02-00100 Temporary Hay or Straw Bales 50      EACH 26.89 1,344.50 20.00 1,000.00 12.00 600.00 15.00 750.00
0002 204-06-00100 Temporary Silt Fencing 2,000      LNFT 2.35 4,700.00 2.00 4,000.00 1.75 3,500.00 2.00 4,000.00
0003 602-02-00200 Cleaning and Resealing Existing Longitudinal Pavement Joints 180,711.6    LNFT 1.62 292,752.79 2.00 361,423.20 1.75 316,245.30 2.25 406,601.10
0004 602-02-00300 Cleaning and Resealing Existing Transverse Pavements Joints 82,091.4    LNFT 1.70 139,555.38 2.05 168,287.37 1.00 82,091.40 2.65 217,542.21
0005 602-03-00100 Cleaning and Sealing Random cracks 5,000      LNFT 3.78 18,900.00 4.00 20,000.00 1.00 5,000.00 3.50 17,500.00
0006 602-05-01360 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (14" Thick) 4,114.6    SQYD 496.76 2,043,968.70 425.00 1,748,705.00 600.00 2,468,760.00 495.00 2,036,727.00
0007 602-05-02360 Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (14" Thick) 1,729.2    SQYD 402.96 696,798.43 400.00 691,680.00 600.00 1,037,520.00 470.00 812,724.00
0008 602-05-03360 Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (14" Thick) 56.2    SQYD 1,244.66 69,949.89 395.00 22,199.00 600.00 33,720.00 445.00 25,009.00
0009 713-01-00100 Temporary Signs and Barricades 1      LUMP 152,266.00 152,266.00 600,000.00 600,000.00 25,000.00 25,000.00 250,000.00 250,000.00
0010 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1      MILE 599.00 599.00 620.00 620.00 475.00 475.00 475.00 475.00
0011 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1      MILE 759.00 759.00 700.00 700.00 550.00 550.00 550.00 550.00
0012 727-01-00100 Mobilization 1      LUMP 418,673.00 418,673.00 400,000.00 400,000.00 140,000.00 140,000.00 395,000.00 395,000.00
0013 731-02-00100 Reflectorized Raised Pavement Markers 4,235      EACH 6.62 28,035.70 6.50 27,527.50 5.25 22,233.75 5.25 22,233.75
0014 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 9,398      LNFT 1.70 15,976.60 1.75 16,446.50 1.35 12,687.30 1.35 12,687.30
0015 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 9,015      LNFT 5.67 51,115.05 5.80 52,287.00 4.50 40,567.50 4.50 40,567.50
0016 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 19.165  MILE 3,465.00 66,406.73 3,500.00 67,077.50 2,750.00 52,703.75 2,750.00 52,703.75
0017 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 18.575  MILE 1,071.00 19,893.83 1,000.00 18,575.00 850.00 15,788.75 850.00 15,788.75
0018 740-01-00100 Construction Layout 1      LUMP 3,780.00 3,780.00 10,000.00 10,000.00 3,000.00 3,000.00 10,000.00 10,000.00
0019 NS-713-00001 Dynamic Message Sign Unit 2      EACH 11,166.00 22,332.00 20,000.00 40,000.00 10,000.00 20,000.00 10,000.00 20,000.00
                         
    CONTRACTOR TOTAL       4,047,806.60   4,250,528.07   4,280,442.75   4,340,859.36
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.