LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 452-90-0152
Parish: Tangipahoa
Routes: I-55
Description: JCT. LA 1049 - MISSISSIPPI STATE LINE
Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, RUBERLIZING PORTLAND CEMENT CONCRETE PAVEMENT, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK
Estimated Construction Cost: $19,093,850.00
Maximum Number of Days Allowed for Construction: 300
Calculated Daily User Cost: $3,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 06276 Barriere Construction Co., LLC. $15,780,166.47 210 $16,410,166.47
2 12487 Diamond B Construction Co., L.L.C. $16,706,951.65 290 $17,576,951.65


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Barriere Construction Co., LLC.
- 2 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 130,000.00 130,000.00 500,000.00 500,000.00
0002 202-01-00100 Removal of Structures and Obstructions Removal of Item in Right hand travel lane of N.B. Roadway @ approximate log mile 48.245 1      LUMP 10,000.00 10,000.00 1,000.00 1,000.00
0003 202-02-00010 Removal Existing Pier Protection 2      EACH 12,000.00 24,000.00 10,500.00 21,000.00
0004 202-02-14500 Removal of Guard Rail 6,176      LNFT 6.00 37,056.00 11.00 67,936.00
0005 202-02-38300 Removal of Sign and U-Channel Post 58      EACH 42.00 2,436.00 10.00 580.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 68,742      SQYD 2.00 137,484.00 3.00 206,226.00
0007 202-03-00010 Relocation Relocation of light pole's @ LA 38 Interchange 3      EACH 4,000.00 12,000.00 3,000.00 9,000.00
0008 202-03-38000 Relocation of Sign relocation of signs which may be in the way or needing height adjustment 50      EACH 900.00 45,000.00 275.00 13,750.00
0009 203-05-00100 Excavation and Embankment 102,000 cu.yds Embankment est. and 7,500 cu. yds. Excavation est. 1      LUMP 935,000.00 935,000.00 1,000,000.00 1,000,000.00
0010 204-02-00100 Temporary Hay or Straw Bales 2,500      EACH 5.00 12,500.00 17.00 42,500.00
0011 204-06-00100 Temporary Silt Fencing 57,000      LNFT 1.00 57,000.00 2.25 128,250.00
0012 302-02-02100 Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) 1,511.1    SQYD 17.00 25,688.70 17.00 25,688.70
0013 302-02-05120 Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) 5,000      SQYD 20.00 100,000.00 1.00 5,000.00
0014 302-02-06080 Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) 2,953.8    SQYD 22.00 64,983.60 27.50 81,229.50
0015 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 700      CUYD 28.00 19,600.00 50.00 35,000.00
0016 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 500      CUYD 20.00 10,000.00 1.00 500.00
0017 502-01-00100 Superpave Asphaltic Concrete 166,509.1    TON 58.00 9,657,527.80 63.20 10,523,375.12
0018 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 650      TON 100.00 65,000.00 125.00 81,250.00
0019 509-01-00100 Cold Planing Asphaltic Pavement 29,372      SQYD 1.75 51,401.00 2.15 63,149.80
0020 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -1,223      CUYD 1.00 -1,223.00 0.10 -122.30
0021 510-01-00100 Pavement Patching (6" Minimum Thickness) 5,000      SQYD 10.00 50,000.00 1.00 5,000.00
0022 510-01-00200 Pavement Patching (12" Minimum Thickness) 10,000      SQYD 20.00 200,000.00 1.00 10,000.00
0023 601-01-01100 Portland Cement Concrete Pavement (13" Thick) 1,333.3    SQYD 105.00 139,996.50 91.00 121,330.30
0024 602-02-00200 Cleaning and Resealing Existing Longitudinal Pavement Joints 6,822      LNFT 1.80 12,279.60 1.80 12,279.60
0025 602-02-00300 Cleaning and Resealing Existing Transverse Pavements Joints 4,592      LNFT 2.10 9,643.20 1.80 8,265.60
0026 602-03-00100 Cleaning and Sealing Random cracks 2,000      LNFT 3.60 7,200.00 3.00 6,000.00
0027 602-05-01160 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) 100      SQYD 100.00 10,000.00 150.00 15,000.00
0028 602-05-01200 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) 1,200      SQYD 100.00 120,000.00 160.00 192,000.00
0029 602-05-02160 Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) 700      SQYD 100.00 70,000.00 160.00 112,000.00
0030 602-11-00100 Removal of Existing Shoulder Underdrain Systems 56,200      LNFT 2.00 112,400.00 2.60 146,120.00
0031 701-15-00100 Concrete Collar 13      EACH 2,400.00 31,200.00 1,000.00 13,000.00
0032 702-04-00200 Adjusting Catch Basins 21      EACH 3,000.00 63,000.00 1.00 21.00
0033 703-01-00100 Shoulder Underdrain Systems 56,200      LNFT 3.30 185,460.00 4.60 258,520.00
0034 703-02-00100 Shoulder Outlet Underdrains 100      EACH 500.00 50,000.00 575.00 57,500.00
0035 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) includes removal of aluminum hand rail 2,926.8    LNFT 30.00 87,804.00 23.00 67,316.40
0036 704-01-02000 Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) 1,247.8    LNFT 52.00 64,885.60 48.00 59,894.40
0037 704-03-00100 Blocked Out Guard Rail 4,888.5    LNFT 20.00 97,770.00 18.00 87,993.00
0038 704-06-00200 Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) 12.5    LNFT 87.00 1,087.50 64.00 800.00
0039 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 475      LNFT 62.00 29,450.00 90.00 42,750.00
0040 704-11-00100 Guard Rail End Treatment (Flared) 28      EACH 2,200.00 61,600.00 1,250.00 35,000.00
0041 704-11-00200 Guard Rail End Treatment (Tangent) 2      EACH 2,600.00 5,200.00 1,300.00 2,600.00
0042 704-11-00300 Guard Rail End Treatment (Bi-Directional) 2      EACH 4,800.00 9,600.00 3,600.00 7,200.00
0043 707-01-00200 Concrete Curb (Barrier) 800      LNFT 21.00 16,800.00 10.00 8,000.00
0044 707-04-00100 Asphaltic Curb 180      LNFT 50.00 9,000.00 28.00 5,040.00
0045 710-01-00100 Flowable Fill 100      CUYD 70.00 7,000.00 165.00 16,500.00
0046 712-01-00100 Concrete Cast-in-Place Revetment (4" Thick) 500      SQYD 76.00 38,000.00 75.00 37,500.00
0047 713-01-00100 Temporary Signs and Barricades 1      LUMP 460,000.00 460,000.00 350,000.00 350,000.00
0048 713-02-00300 Temporary Pavement Markings (8" Width) 10,000      LNFT 0.10 1,000.00 0.20 2,000.00
0049 713-02-00500 Temporary Pavement Markings (24" Width) 100      LNFT 0.84 84.00 1.00 100.00
0050 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 43.72   MILE 192.00 8,394.24 145.00 6,339.40
0051 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 100      MILE 100.00 10,000.00 300.00 30,000.00
0052 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 193.388  MILE 100.00 19,338.80 540.00 104,429.52
0053 713-04-01020 Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) 5.252  MILE 5,500.00 28,886.00 6,700.00 35,188.40
0054 713-08-00100 Temporary Precast Concrete Barrier (Department Furnished) 30      EACH 300.00 9,000.00 180.00 5,400.00
0055 717-01-00100 Seeding 2,280      LB 8.00 18,240.00 8.25 18,810.00
0056 718-01-00100 Fertilizer 76,000      LB 0.40 30,400.00 0.38 28,880.00
0057 720-01-01000 Erosion Control System (Slope Protection) (Type A) 150,000      SQYD 0.80 120,000.00 1.05 157,500.00
0058 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 250      SQYD 3.00 750.00 2.65 662.50
0059 721-01-00100 Mowing 1,928      ACRE 40.00 77,120.00 64.00 123,392.00
0060 722-01-00100 Project Site Laboratory 1      EACH 16,000.00 16,000.00 24,000.00 24,000.00
0061 727-01-00100 Mobilization 1      LUMP 1,040,000.00 1,040,000.00 744,800.00 744,800.00
0062 729-16-00200 Object Marker Assembly (Type 2) 50      EACH 50.00 2,500.00 48.00 2,400.00
0063 729-16-00300 Object Marker Assembly (Type 3) 40      EACH 90.00 3,600.00 66.00 2,640.00
0064 729-17-00100 Milepost Assembly (Ground Mounted) this is for mile markers which are missing 5      EACH 100.00 500.00 425.00 2,125.00
0065 731-01-00100 Nonreflectorized Raised Pavement Markers 169      EACH 11.00 1,859.00 10.00 1,690.00
0066 731-02-00100 Reflectorized Raised Pavement Markers 2,000      EACH 5.25 10,500.00 5.00 10,000.00
0067 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 32.207  MILE 2,400.00 77,296.80 2,500.00 80,517.50
0068 732-02-02020 Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) 0.379  MILE 4,000.00 1,516.00 3,700.00 1,402.30
0069 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 1.515  MILE 6,500.00 9,847.50 5,100.00 7,726.50
0070 732-02-02080 Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) 0.23   MILE 21,000.00 4,830.00 18,000.00 4,140.00
0071 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 10.664  MILE 820.00 8,744.48 690.00 7,358.16
0072 732-03-03000 Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) 15.223  MILE 4,200.00 63,936.60 2,800.00 42,624.40
0073 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 6      EACH 220.00 1,320.00 175.00 1,050.00
0074 732-05-00100 Removal of Existing Markings 10.932  MILE 4,000.00 43,728.00 5,000.00 54,660.00
0075 734-01-00100 Rubblizing Portland Cement Concrete Pavement 145,129      SQYD 3.00 435,387.00 2.65 384,591.85
0076 735-01-00100 Mailboxes 9      EACH 10.00 90.00 1.00 9.00
0077 735-02-00100 Mailbox Supports (Single) 9      EACH 102.00 918.00 160.00 1,440.00
0078 740-01-00100 Construction Layout 1      LUMP 42,000.00 42,000.00 64,000.00 64,000.00
0079 NS-500-00220 Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay 8,957      LNFT 1.60 14,331.20 1.60 14,331.20
0080 NS-500-00240 Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay 4,592      LNFT 1.70 7,806.40 1.80 8,265.60
0081 NS-500-00260 Sawcuts in Asphaltic Concrete Lifts 78,896      LNFT 0.50 39,448.00 0.50 39,448.00
0082 NS-500-00280 Surface Preparation 1      LUMP 15,000.00 15,000.00 21,400.00 21,400.00
0083 NS-500-00300 Traffic Maintenance Superpave Asphaltic Concrete 500      TON 70.00 35,000.00 50.00 25,000.00
0084 NS-602-00001 Milling Concrete Pavement 4,832      SQYD 11.00 53,152.00 3.75 18,120.00
0085 NS-700-00020 Adjusting Guard Rail 551      LNFT 7.50 4,132.50 7.50 4,132.50
0086 NS-713-00001 Dynamic Message Sign Unit 4      EACH 10,000.00 40,000.00 10,500.00 42,000.00
0087 NS-724-00002 Rumble Strips (Shoulder Ground-In) 21.864  MILE 450.00 9,838.80 550.00 12,025.20
0088 NS-800-00120 Pier Protection System (Vehicle) LA 1053 UNDERPASS 2      EACH 50,000.00 100,000.00 31,000.00 62,000.00
0089 704-06-00100 Guard Rail Anchor Sections (Trailing End) 18.75   LNFT 75.00 1,406.25 110.00 2,062.50
0090 706-03-00300 Incidental Concrete Paving (6" Thick) 298.2    SQYD 92.00 27,434.40 85.00 25,347.00
                 
    ITEM TOTAL (CONSTRUCTION BID)       15,780,166.47   16,706,951.65
    NUMBER OF DAYS BID AT $3000 PER DAY.       630,000.00   870,000.00
    TOTAL BID       16,410,166.47   17,576,951.65