Bid Tabulations
Letting of
08/25/2010
LA DOTD Headquarters
| Lead Project: 452-01-0051 | |
| Parish: St. John | |
| Routes: I-55 | |
| Description: I-55 @ RUDDOCK INTERCHANGE | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $683,589.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $658,364.75 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $787,734.75 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Coastal Bridge Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-04024 | Removal of Bridge Components 880' of Barrier Rail on Approach Slabs | 1 | LUMP | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 281 | LNFT | 5.50 | 1,545.50 | 5.00 | 1,405.00 |
| 0003 | 202-03-38020 | Relocation of Sign Pole Raise all traffic sign foundations to proposed grade | 12 | EACH | 1,000.00 | 12,000.00 | 1,000.00 | 12,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 842 | CUYD | 30.00 | 25,260.00 | 25.00 | 21,050.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 4,500 | LNFT | 1.50 | 6,750.00 | 0.01 | 45.00 |
| 0006 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 1,334.2 | CUYD | 75.00 | 100,065.00 | 95.00 | 126,749.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 70 | CUYD | 1.00 | 70.00 | 1.00 | 70.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,430.9 | TON | 120.00 | 291,708.00 | 125.00 | 303,862.50 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 162.3 | TON | 120.00 | 19,476.00 | 175.00 | 28,402.50 |
| 0010 | 602-08-00100 | Grinding Concrete Pavement | 213.7 | SQYD | 45.00 | 9,616.50 | 30.00 | 6,411.00 |
| 0011 | 704-03-00100 | Blocked Out Guard Rail | 212.5 | LNFT | 17.00 | 3,612.50 | 16.50 | 3,506.25 |
| 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 63.00 | 6,300.00 | 60.00 | 6,000.00 |
| 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 1,900.00 | 7,600.00 | 1,800.00 | 7,200.00 |
| 0014 | 705-09-00100 | Rebuilt Fence | 2,350 | LNFT | 6.00 | 14,100.00 | 15.00 | 35,250.00 |
| 0015 | 707-04-00100 | Asphaltic Curb | 450.6 | LNFT | 30.00 | 13,518.00 | 25.00 | 11,265.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 25,000.00 | 25,000.00 |
| 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 0.80 | 76.80 | 0.75 | 72.00 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.42 | MILE | 600.00 | 852.00 | 550.00 | 781.00 |
| 0019 | 717-01-00100 | Seeding | 115 | LB | 6.50 | 747.50 | 6.00 | 690.00 |
| 0020 | 718-01-00100 | Fertilizer | 1,535 | LB | 0.65 | 997.75 | 0.60 | 921.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 130,000.00 | 130,000.00 |
| 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 70.00 | 280.00 | 65.00 | 260.00 |
| 0023 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 96 | LNFT | 5.00 | 480.00 | 4.50 | 432.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.217 | MILE | 2,600.00 | 3,164.20 | 2,500.00 | 3,042.50 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 25,000.00 | 25,000.00 |
| 0026 | NS-500-00020 | Asphalt Slurry Seal Coat (Type I) | 320 | SQYD | 1.00 | 320.00 | 1.00 | 320.00 |
| 0027 | NS-700-00020 | Adjusting Guard Rail | 75 | LNFT | 11.00 | 825.00 | 40.00 | 3,000.00 |
| 0028 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 5,000.00 | 10,000.00 | 5,000.00 | 10,000.00 |
| CONTRACTOR TOTAL | 658,364.75 | 787,734.75 | ||||||