Bid Tabulations
Letting of
05/25/2011
LA DOTD Headquarters
| Lead Project: 451-07-0074 | |
| Parish: Richland | |
| Routes: I-20 | |
| Description: HOLLY RIDGE - DUNN | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $4,278,207.63 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,533,358.76 |
| 2 | 05789 | D & J Construction Co., Inc. | $4,504,688.03 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - D & J Construction Co., Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 100.00 | 100.00 |
| 0003 | 202-02-06040 | Removal of Concrete Box Headwall (As Listed in Summary of Drainage Struct.) | 4 | EACH | 325.00 | 1,300.00 | 1.00 | 4.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (As Listed in Summary of Drainage Struct.) | 74 | LNFT | 2.25 | 166.50 | 1.00 | 74.00 |
| 0005 | 202-02-32180 | Removal of Pipe Headwalls | 6 | EACH | 110.00 | 660.00 | 1.00 | 6.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 6,713 | CUYD | 14.00 | 93,982.00 | 20.00 | 134,260.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 33,986.7 | TON | 79.00 | 2,684,949.30 | 102.00 | 3,466,643.40 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 183,178 | SQYD | 1.65 | 302,243.70 | 2.00 | 366,356.00 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -10,177 | CUYD | 0.10 | -1,017.70 | 0.10 | -1,017.70 |
| 0010 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 32 | LNFT | 72.00 | 2,304.00 | 55.00 | 1,760.00 |
| 0011 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 32 | LNFT | 140.00 | 4,480.00 | 100.00 | 3,200.00 |
| 0012 | 701-10-01120 | Reinforced Concrete Pipe (Extension) (42") | 96 | LNFT | 160.00 | 15,360.00 | 200.00 | 19,200.00 |
| 0013 | 701-15-00100 | Concrete Collar | 9 | EACH | 800.00 | 7,200.00 | 600.00 | 5,400.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 155,000.00 | 155,000.00 | 135,000.00 | 135,000.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.609 | MILE | 175.00 | 2,731.58 | 225.00 | 3,512.03 |
| 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 16.084 | MILE | 160.00 | 2,573.44 | 200.00 | 3,216.80 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 31.218 | MILE | 230.00 | 7,180.14 | 250.00 | 7,804.50 |
| 0018 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 3,700.00 | 740.00 | 1,500.00 | 300.00 |
| 0019 | 717-01-00100 | Seeding | 7 | LB | 100.00 | 700.00 | 30.00 | 210.00 |
| 0020 | 718-01-00100 | Fertilizer | 110 | LB | 1.00 | 110.00 | 3.00 | 330.00 |
| 0021 | 726-01-00100 | Bedding Material | 92 | CUYD | 110.00 | 10,120.00 | 100.00 | 9,200.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 81,300.00 | 81,300.00 | 155,000.00 | 155,000.00 |
| 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 110.00 | 1,100.00 | 100.00 | 1,000.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,561 | EACH | 5.50 | 8,585.50 | 7.00 | 10,927.00 |
| 0025 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,920 | LNFT | 3.25 | 9,490.00 | 4.00 | 11,680.00 |
| 0026 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,300 | LNFT | 7.25 | 9,425.00 | 8.00 | 10,400.00 |
| 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.609 | MILE | 2,800.00 | 43,705.20 | 3,000.00 | 46,827.00 |
| 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.042 | MILE | 1,000.00 | 8,042.00 | 1,000.00 | 8,042.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,200.00 | 5,200.00 | 42,000.00 | 42,000.00 |
| 0030 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 19.17 | CUYD | 1,000.00 | 19,170.00 | 950.00 | 18,211.50 |
| 0031 | 805-12-33000 | Reinforced Concrete Box Culverts (4' x 4') (Extension) | 8 | LNFT | 550.00 | 4,400.00 | 400.00 | 3,200.00 |
| 0032 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 4 | LNFT | 550.00 | 2,200.00 | 450.00 | 1,800.00 |
| 0033 | 806-01-00100 | Deformed Reinforcing Steel | 1,361 | LB | 2.10 | 2,858.10 | 1.50 | 2,041.50 |
| 0034 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 5,400.00 | 21,600.00 | 4,500.00 | 18,000.00 |
| CONTRACTOR TOTAL | 3,533,358.76 | 4,504,688.03 | ||||||