Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 451-06-0142 | |
| Parish: Ouachita | |
| Routes: I-20 | |
| Description: I-20 EAST RAMP TO US 165 NORTH BOUND - MONROE | |
| Type Const: GRADING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $315,328.06 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $420,548.90 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $475,228.90 |
| 3 | 05789 | D & J Construction Co., Inc. | $480,722.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 620 | LNFT | 12.00 | 7,440.00 | 10.00 | 6,200.00 | 10.00 | 6,200.00 |
| 0002 | 202-02-38200 | Removal of Signs | 13 | EACH | 80.00 | 1,040.00 | 245.00 | 3,185.00 | 75.00 | 975.00 |
| 0003 | 202-02-38220 | Removal of Sign Supports | 13 | EACH | 200.00 | 2,600.00 | 245.00 | 3,185.00 | 150.00 | 1,950.00 |
| 0004 | 203-01-00100 | General Excavation | 45 | CUYD | 60.00 | 2,700.00 | 125.00 | 5,625.00 | 35.00 | 1,575.00 |
| 0005 | 203-03-00100 | Embankment | 150 | CUYD | 35.00 | 5,250.00 | 55.00 | 8,250.00 | 50.00 | 7,500.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 535 | TON | 125.00 | 66,875.00 | 240.00 | 128,400.00 | 275.00 | 147,125.00 |
| 0007 | 602-08-00100 | Grinding Concrete Pavement | 267 | SQYD | 50.00 | 13,350.00 | 60.00 | 16,020.00 | 50.00 | 13,350.00 |
| 0008 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 336 | LNFT | 35.00 | 11,760.00 | 50.00 | 16,800.00 | 33.00 | 11,088.00 |
| 0009 | 704-03-00100 | Blocked Out Guard Rail | 465 | LNFT | 21.00 | 9,765.00 | 28.00 | 13,020.00 | 19.00 | 8,835.00 |
| 0010 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 60.00 | 3,000.00 | 88.00 | 4,400.00 | 56.00 | 2,800.00 |
| 0011 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 3,000.00 | 6,000.00 | 3,200.00 | 6,400.00 | 2,100.00 | 4,200.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 35,000.00 | 35,000.00 | 92,000.00 | 92,000.00 |
| 0013 | 713-02-00200 | Temporary Pavement Markings (6" Width) | 9,500 | LNFT | 0.35 | 3,325.00 | 0.50 | 4,750.00 | 0.30 | 2,850.00 |
| 0014 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 60 | EACH | 250.00 | 15,000.00 | 700.00 | 42,000.00 | 500.00 | 30,000.00 |
| 0015 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 60 | EACH | 140.00 | 8,400.00 | 100.00 | 6,000.00 | 100.00 | 6,000.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 62,000.00 | 62,000.00 | 48,000.00 | 48,000.00 |
| 0017 | 729-01-00100 | Sign (Type A) | 51 | SQFT | 25.00 | 1,275.00 | 32.00 | 1,632.00 | 25.00 | 1,275.00 |
| 0018 | 729-06-00100 | Sign (Overhead Mounted) | 60 | SQFT | 28.00 | 1,680.00 | 39.00 | 2,340.00 | 30.00 | 1,800.00 |
| 0019 | 729-08-00100 | Mounting (2 1/2" Size Post) | 7 | EACH | 850.00 | 5,950.00 | 1,200.00 | 8,400.00 | 750.00 | 5,250.00 |
| 0020 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 1,200.00 | 1,200.00 | 1,700.00 | 1,700.00 | 1,100.00 | 1,100.00 |
| 0021 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 125.00 | 250.00 | 160.00 | 320.00 | 100.00 | 200.00 |
| 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 520 | EACH | 6.00 | 3,120.00 | 8.00 | 4,160.00 | 12.50 | 6,500.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.709 | MILE | 3,000.00 | 2,127.00 | 4,500.00 | 3,190.50 | 9,000.00 | 6,381.00 |
| 0024 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.075 | MILE | 5,500.00 | 412.50 | 8,600.00 | 645.00 | 20,000.00 | 1,500.00 |
| 0025 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.036 | MILE | 25,000.00 | 900.00 | 32,000.00 | 1,152.00 | 56,000.00 | 2,016.00 |
| 0026 | 732-05-00100 | Removal of Existing Markings | 0.6 | MILE | 6,300.00 | 3,780.00 | 8,600.00 | 5,160.00 | 14,000.00 | 8,400.00 |
| 0027 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 6,000.00 | 600.00 | 18,000.00 | 1,800.00 | 6,000.00 | 600.00 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 15,000.00 | 15,000.00 | 4,000.00 | 4,000.00 |
| 0029 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 1,808 | LNFT | 1.80 | 3,254.40 | 2.80 | 5,062.40 | 4.00 | 7,232.00 |
| 0030 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 965 | LNFT | 1.90 | 1,833.50 | 2.80 | 2,702.00 | 6.00 | 5,790.00 |
| 0031 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 965 | LNFT | 1.10 | 1,061.50 | 2.00 | 1,930.00 | 2.00 | 1,930.00 |
| 0032 | NS-700-00180 | Impact Attenuator (Construction Zone) | 1 | EACH | 18,000.00 | 18,000.00 | 13,000.00 | 13,000.00 | 8,500.00 | 8,500.00 |
| 0033 | NS-700-00181 | Impact Attenuator Relocation (Construction Zone) | 1 | EACH | 800.00 | 800.00 | 800.00 | 800.00 | 1,000.00 | 1,000.00 |
| 0034 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 2 | EACH | 800.00 | 1,600.00 | 14,000.00 | 28,000.00 | 9,000.00 | 18,000.00 |
| 0035 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 7,000.00 | 14,000.00 | 5,500.00 | 11,000.00 | 3,000.00 | 6,000.00 |
| 0036 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.4 | MILE | 8,000.00 | 3,200.00 | 15,000.00 | 6,000.00 | 22,000.00 | 8,800.00 |
| CONTRACTOR TOTAL | 420,548.90 | 475,228.90 | 480,722.00 | |||||||