LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 451-03-0068
Parish: Webster
Routes: I-20
Description: I-20 (ACCELERATION LANE EXTENSION)
Type Const: GRADING, PAVEMENT PATCHING, PORTLAND CEMENT CONTRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost: $284,787.72


RankLicenseBidderConstruction Bid
1 28218 F. J. Burnell, Inc. $197,141.65
2 48462 Fessler And Bowman, Inc. $273,439.86
3 39462 Jb James Construction Llc $302,454.80
4 21982 Forby Contracting, Inc. $307,268.05
5 35849 T.L. Construction LLC $352,466.40


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
F. J. Burnell, Inc.
- 2 -
Fessler And Bowman, Inc.
- 3 -
Jb James Construction Llc
- 4 -
Forby Contracting, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,000.00 5,000.00 3,687.15 3,687.15 25,000.00 25,000.00 5,000.00 5,000.00
0002 202-02-32500 Removal of Portland Cement Concrete Pavement 859      SQYD 10.00 8,590.00 12.12 10,411.08 16.00 13,744.00 10.00 8,590.00
0003 203-01-00100 General Excavation 897      CUYD 5.00 4,485.00 11.06 9,920.82 19.00 17,043.00 11.00 9,867.00
0004 203-03-00100 Embankment 266      CUYD 9.00 2,394.00 17.95 4,774.70 22.00 5,852.00 36.00 9,576.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 2      EACH 150.00 300.00 121.03 242.06 200.00 400.00 200.00 400.00
0006 204-06-00100 Temporary Silt Fencing 961      LNFT 1.75 1,681.75 2.42 2,325.62 3.00 2,883.00 1.95 1,873.95
0007 302-02-06120 Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) 1,684.1    SQYD 20.00 33,682.00 36.07 60,745.49 28.00 47,154.80 36.00 60,627.60
0008 601-01-00500 Portland Cement Concrete Pavement (10" Thick) 1,684.1    SQYD 54.00 90,941.40 85.09 143,300.07 70.00 117,887.00 95.00 159,989.50
0009 602-05-03200 Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) 60      SQYD 125.00 7,500.00 207.96 12,477.60 160.00 9,600.00 185.00 11,100.00
0010 713-01-00100 Temporary Signs and Barricades 1      LUMP 18,000.00 18,000.00 5,479.03 5,479.03 15,000.00 15,000.00 10,000.00 10,000.00
0011 716-01-00100 Mulch (Vegetative) 0.8    TON 500.00 400.00 3,630.83 2,904.66 2,500.00 2,000.00 3,900.00 3,120.00
0012 717-01-00100 Seeding 15      LB 15.00 225.00 60.51 907.65 25.00 375.00 15.00 225.00
0013 718-01-00100 Fertilizer 500      LB 1.00 500.00 3.63 1,815.00 0.50 250.00 0.80 400.00
0014 727-01-00100 Mobilization 1      LUMP 17,500.00 17,500.00 11,713.59 11,713.59 30,000.00 30,000.00 20,000.00 20,000.00
0015 731-02-00100 Reflectorized Raised Pavement Markers 24      EACH 20.00 480.00 10.77 258.48 27.00 648.00 26.50 636.00
0016 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 50      LNFT 11.00 550.00 10.52 526.00 20.00 1,000.00 20.00 1,000.00
0017 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.189  MILE 7,500.00 1,417.50 3,239.91 612.34 16,000.00 3,024.00 15,000.00 2,835.00
0018 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.066  MILE 7,500.00 495.00 5,294.96 349.47 9,000.00 594.00 8,000.00 528.00
0019 740-01-00100 Construction Layout 1      LUMP 3,000.00 3,000.00 989.05 989.05 10,000.00 10,000.00 1,500.00 1,500.00
                         
    CONTRACTOR TOTAL       197,141.65   273,439.86   302,454.80   307,268.05



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
T.L. Construction LLC
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,000.00 5,000.00
0002 202-02-32500 Removal of Portland Cement Concrete Pavement 859      SQYD 12.00 10,308.00
0003 203-01-00100 General Excavation 897      CUYD 16.00 14,352.00
0004 203-03-00100 Embankment 266      CUYD 35.00 9,310.00
0005 204-05-00100 Temporary Sediment Check Dams (Hay) 2      EACH 270.00 540.00
0006 204-06-00100 Temporary Silt Fencing 961      LNFT 2.50 2,402.50
0007 302-02-06120 Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) 1,684.1    SQYD 44.00 74,100.40
0008 601-01-00500 Portland Cement Concrete Pavement (10" Thick) 1,684.1    SQYD 96.00 161,673.60
0009 602-05-03200 Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) 60      SQYD 270.00 16,200.00
0010 713-01-00100 Temporary Signs and Barricades 1      LUMP 6,300.00 6,300.00
0011 716-01-00100 Mulch (Vegetative) 0.8    TON 4,000.00 3,200.00
0012 717-01-00100 Seeding 15      LB 16.00 240.00
0013 718-01-00100 Fertilizer 500      LB 0.90 450.00
0014 727-01-00100 Mobilization 1      LUMP 40,000.00 40,000.00
0015 731-02-00100 Reflectorized Raised Pavement Markers 24      EACH 31.00 744.00
0016 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 50      LNFT 2.10 105.00
0017 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.189  MILE 10,500.00 1,984.50
0018 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.066  MILE 5,400.00 356.40
0019 740-01-00100 Construction Layout 1      LUMP 5,200.00 5,200.00
             
    CONTRACTOR TOTAL       352,466.40