LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 450-15-0143-R2
Parish: Jefferson
Routes: I-10
Description: LEVELING APPROACH SLAB (AIRPORT ACCESS ROAD ENTRANCE RAMP)
Type Const: LEVELING APPROACH SLAB, SUPERPAVE ASPHALTIC CONCRETE, STRIPING AND RELATED WORK
Estimated Construction Cost: $224,231.90


RankLicenseBidderConstruction Bid
1 06276 Barriere Construction Co., LLC $342,341.65
2 02179 Boh Bros. Construction Co., LLC. $621,896.21


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Barriere Construction Co., LLC
- 2 -
Boh Bros. Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 502-01-00100 Superpave Asphaltic Concrete 475      TON 245.00 116,375.00 150.00 71,250.00
0002 509-01-00100 Cold Planing Asphaltic Pavement 267      SQYD 35.00 9,345.00 5.00 1,335.00
0003 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -11      CUYD 1.00 -11.00 20.00 -220.00
0004 713-01-00100 Temporary Signs and Barricades 1      LUMP 75,000.00 75,000.00 148,000.00 148,000.00
0005 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 0.163  MILE 550.00 89.65 670.00 109.21
0006 727-01-00100 Mobilization 1      LUMP 33,000.00 33,000.00 60,000.00 60,000.00
0007 731-02-00100 Reflectorized Raised Pavement Markers 40      EACH 10.00 400.00 7.00 280.00
0008 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 60      LNFT 2.00 120.00 2.00 120.00
0009 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 120      LNFT 5.50 660.00 7.00 840.00
0010 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.088  MILE 6,000.00 528.00 4,000.00 352.00
0011 740-01-00100 Construction Layout 1      LUMP 4,500.00 4,500.00 26,800.00 26,800.00
0012 NS-713-00001 Dynamic Message Sign Unit 4      EACH 4,000.00 16,000.00 1,825.00 7,300.00
0013 NS-810-00001 Barrier Rail Rehabiltation double face with mouted lights (sta. 10+00 to sta. 10+60) 60      LNFT 350.00 21,000.00 925.00 55,500.00
0014 NS-810-00001 Barrier Rail Rehabiltation single face 313      LNFT 130.00 40,690.00 485.00 151,805.00
0015 NS-810-00001 Barrier Rail Rehabiltation double face 155      LNFT 159.00 24,645.00 635.00 98,425.00
                 
    CONTRACTOR TOTAL       342,341.65   621,896.21