Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 450-15-0137 | |
| Parish: Jefferson | |
| Routes: I-10 | |
| Description: CLEARVIEW TO CAUSEWAY JT RPR AND CLEARVIEW LOOP OVERLAY | |
| Type Const: COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, ASPHALTIC CONCRETE (SMA) OVERLAY, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $908,586.84 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,097,297.50 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,129,380.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 85 | CUYD | 120.00 | 10,200.00 | 50.00 | 4,250.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 3,114 | TON | 90.00 | 280,260.00 | 115.00 | 358,110.00 |
| 0003 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 2,120 | TON | 120.00 | 254,400.00 | 130.00 | 275,600.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 45,362 | SQYD | 6.00 | 272,172.00 | 3.00 | 136,086.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -755 | CUYD | 8.00 | -6,040.00 | 1.00 | -755.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 11.5 | SQYD | 300.00 | 3,450.00 | 175.00 | 2,012.50 |
| 0007 | 510-03-00100 | Pavement Joint Repair | 25 | TON | 500.00 | 12,500.00 | 3,000.00 | 75,000.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 82,000.00 | 82,000.00 | 100,000.00 | 100,000.00 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1 | MILE | 5.00 | 5.00 | 10.00 | 10.00 |
| 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1 | MILE | 300.00 | 300.00 | 15.00 | 15.00 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.5 | MILE | 600.00 | 4,500.00 | 20.00 | 150.00 |
| 0012 | 717-01-00100 | Seeding | 10 | LB | 30.00 | 300.00 | 30.00 | 300.00 |
| 0013 | 718-01-00100 | Fertilizer | 332 | LB | 2.50 | 830.00 | 1.00 | 332.00 |
| 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 106,000.00 | 106,000.00 | 115,000.00 | 115,000.00 |
| 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 400 | EACH | 4.85 | 1,940.00 | 5.50 | 2,200.00 |
| 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.75 | MILE | 2,500.00 | 9,375.00 | 3,000.00 | 11,250.00 |
| 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 690.00 | 690.00 | 700.00 | 700.00 |
| 0018 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 |
| 0020 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 480 | INLF | 1.10 | 528.00 | 1.50 | 720.00 |
| 0021 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 7,850.00 | 15,700.00 | 4,000.00 | 8,000.00 |
| 0023 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 8,450 | LNFT | 3.75 | 31,687.50 | 4.00 | 33,800.00 |
| 0024 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 400 | LNFT | 3.75 | 1,500.00 | 4.00 | 1,600.00 |
| CONTRACTOR TOTAL | 1,097,297.50 | 1,129,380.50 | ||||||