Bid Tabulations
Letting of
10/09/2013
LA DOTD Headquarters
| Lead Project: 4400003823-R1 | |
| Parish: District 61, District 03 | |
| Routes: I-10 (EB & WB) | |
| Description: I-10 ASSET MAINTENANCE IN DISTRICTS 03 & 61 | |
| Type Const: PERFORMING I-10 ASSET MAINT TO INCLUDE: REP. AND REPL. OF GUARDRAIL, IMPACT ATTENUATORS, AND CABLE BARRIERS, WHILE PERFORM INTERSTATE SWPING, REST AREA MAINT, REST AREA SEC., MOWING OP., RDWAY AND BDG REP. IN DISTS. 03 & 61 | |
| Estimated Construction Cost: $3,538,572.05 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 26435 | C.E.C., Inc. | $6,871,966.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - C.E.C., Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 15 | SQYD | 900.00 | 13,500.00 |
| 0002 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 330 | SQYD | 420.00 | 138,600.00 |
| 0003 | 510-03-00100 | Pavement Joint Repair | 30 | TON | 1,600.00 | 48,000.00 |
| 0004 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 750 | LNFT | 100.00 | 75,000.00 |
| 0005 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 750 | LNFT | 100.00 | 75,000.00 |
| 0006 | 602-03-00100 | Cleaning and Sealing Random cracks | 3,000 | LNFT | 40.00 | 120,000.00 |
| 0007 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 96 | SQYD | 900.00 | 86,400.00 |
| 0008 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 165 | SQYD | 790.00 | 130,350.00 |
| 0009 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 330 | SQYD | 730.00 | 240,900.00 |
| 0010 | 602-09-00100 | Grinding Isolated Joints | 300 | SQYD | 600.00 | 180,000.00 |
| 0011 | 701-14-00100 | Cleaning Existing Pipes | 2,250 | LNFT | 14.00 | 31,500.00 |
| 0012 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 600 | LNFT | 25.00 | 15,000.00 |
| 0013 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 300 | LNFT | 70.00 | 21,000.00 |
| 0014 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 300 | LNFT | 80.00 | 24,000.00 |
| 0015 | 729-14-00100 | Delineator Assembly (Ground Mounted) | 60 | EACH | 360.00 | 21,600.00 |
| 0016 | 729-15-00100 | Delineator Assembly (Structure Mounted) | 6 | EACH | 1,400.00 | 8,400.00 |
| 0017 | 729-16-00100 | Object Marker Assembly (Type 1) | 240 | EACH | 180.00 | 43,200.00 |
| 0018 | 729-16-00200 | Object Marker Assembly (Type 2) | 300 | EACH | 170.00 | 51,000.00 |
| 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 60 | EACH | 300.00 | 18,000.00 |
| 0020 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 330 | EACH | 420.00 | 138,600.00 |
| 0021 | 729-18-00100 | Milepost Assembly (Structure Mounted) | 30 | EACH | 900.00 | 27,000.00 |
| 0022 | 729-18-00200 | Milepost Assembly (Structure Mounted) (Secondary) | 30 | EACH | 900.00 | 27,000.00 |
| 0023 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 30 | EACH | 400.00 | 12,000.00 |
| 0024 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 30 | EACH | 500.00 | 15,000.00 |
| 0025 | NS-201-00003 | Tree and Stump Removal (Over 48" Diameter) | 15 | EACH | 700.00 | 10,500.00 |
| 0026 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 4,500 | INLF | 20.00 | 90,000.00 |
| 0027 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,500 | INLF | 20.00 | 90,000.00 |
| 0028 | NS-702-00001 | Cleaning Existing Catch Basin | 15 | EACH | 1,500.00 | 22,500.00 |
| 0029 | NS-810-00002 | Barrier Rail Repair | 300 | LNFT | 800.00 | 240,000.00 |
| 0030 | NS-MNT-02650 | Repair and Replacement of Guardrail on I-10 in District 03 & District 61. | 6,000 | LNFT | 105.00 | 630,000.00 |
| 0031 | NS-MNT-05000 | One Cycle Litter and Trash Collection Butte LaRose Rest Area (Approx. 48.3 Acres) on I-10 in District 03. | 30 | EACH | 120.00 | 3,600.00 |
| 0032 | NS-MNT-05000 | One Cycle Litter and Trash Collection Control Sections 450-04, 450-05, 450-06. (A pproximately 807 Acres) on I-10 in District 03. | 27 | EACH | 20,200.00 | 545,400.00 |
| 0033 | NS-MNT-05020 | One Cycle Maintenance Mowing Butte LaRose Rest Area (Approx. 48.3 Acres) on I-10 in District 03. | 30 | EACH | 900.00 | 27,000.00 |
| 0034 | NS-MNT-05020 | One Cycle Maintenance Mowing Control Sections 450-04, 450-05, 450-06. (Approximately 807 Acres) on I-10 in District 03. | 21 | EACH | 25,500.00 | 535,500.00 |
| 0035 | NS-MNT-05040 | Cutting Brush | 30 | ACRE | 90.00 | 2,700.00 |
| 0036 | NS-MNT-05060 | Tree Removal (Less than 18" in diameter) | 150 | EACH | 180.00 | 27,000.00 |
| 0037 | NS-MNT-05080 | Tree Removal (18" in diameter and greater) | 30 | EACH | 300.00 | 9,000.00 |
| 0038 | NS-MNT-07000 | Interstate Sweeping | 1,512 | CURM | 200.00 | 302,400.00 |
| 0039 | NS-MNT-10000 | Maintenance and Operation of Interstate Rest Areas at Butte LaRose on I-10 in District 03. | 1,095 | DAY | 820.00 | 897,900.00 |
| 0040 | NS-MNT-10020 | Maintenance and Operation of Wastewater at Butte LaRose Rest Area on I-10 in District 03. | 1,095 | DAY | 2.00 | 2,190.00 |
| 0041 | NS-MNT-10040 | Maintenance and Operation of Potable Drinking Water System at Butte LaRose Rest Area on I-10 in District 03. | 1,095 | DAY | 2.00 | 2,190.00 |
| 0042 | NS-MNT-10060 | Rest Area Security at Butte LaRose Rest Area on I-10 in District 03. | 1,095 | DAY | 205.00 | 224,475.00 |
| 0043 | NS-MNT-10100 | Mobilization of Asset Maintenance Contract | 1 | LUMP | 600,000.00 | 600,000.00 |
| 0044 | NS-MNT-10102 | Cleaning & Reshaping Ditches | 15,000 | LNFT | 9.00 | 135,000.00 |
| 0045 | NS-MNT-90250 | Removal of Debris (Bridge Drains) | 30 | EACH | 500.00 | 15,000.00 |
| 0047 | NS-MNT-90252 | Pick-up and Disposal of Roadside Debris | 74,880.1 | MILE | 12.00 | 898,561.20 |
| CONTRACTOR TOTAL | 6,871,966.20 | |||||