Bid Tabulations
Letting of
01/13/2010
LA DOTD Headquarters
| DBE GOAL FED | |
| Lead Project: 426-31-0013 | |
| Parish: St. James | |
| Routes: LA 3125 | |
| Description: LEFT TURN LANES ON LA 3125 AT LA 3274 | |
| Type Const: CLASS II BASE COURSE, ASPHALTIC CONCRETE, COLD PLANING ASPHALTIC PAVEMENT, PVMT PATCHING, LOOP DETECTOR AND RELATED WORK | |
| Estimated Construction Cost: $653,997.40 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $557,283.45 |
| 2 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $641,474.00 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $657,891.05 |
| 4 | 50078 | Fenton Excavating & Const. Inc. | $698,000.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - F.G. Sullivan, Jr. Contractor LLC |
- 3 - Coastal Bridge Co., L.L.C. |
- 4 - Fenton Excavating & Const. Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 550 | SQYD | 10.00 | 5,500.00 | 15.00 | 8,250.00 | 20.00 | 11,000.00 | 9.75 | 5,362.50 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 22.00 | 2,200.00 | 5.00 | 500.00 | 15.00 | 1,500.00 | 12.00 | 1,200.00 |
| 0003 | 202-02-38500 | Removal of Surfacing and Stablized Base | 3,919 | SQYD | 7.00 | 27,433.00 | 5.00 | 19,595.00 | 4.00 | 15,676.00 | 6.60 | 25,865.40 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 27,000.00 | 27,000.00 | 31,300.00 | 31,300.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 218 | CUYD | 26.00 | 5,668.00 | 18.00 | 3,924.00 | 5.00 | 1,090.00 | 30.00 | 6,540.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 56 | EACH | 10.00 | 560.00 | 12.00 | 672.00 | 15.00 | 840.00 | 15.00 | 840.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 3,340 | LNFT | 1.00 | 3,340.00 | 1.00 | 3,340.00 | 2.50 | 8,350.00 | 1.70 | 5,678.00 |
| 0008 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 3,858 | SQYD | 18.00 | 69,444.00 | 22.00 | 84,876.00 | 25.00 | 96,450.00 | 20.00 | 77,160.00 |
| 0009 | 302-02-06120 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) | 2,493.6 | SQYD | 32.00 | 79,795.20 | 38.00 | 94,756.80 | 40.00 | 99,744.00 | 34.00 | 84,782.40 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,711.2 | TON | 80.00 | 136,896.00 | 110.00 | 188,232.00 | 110.00 | 188,232.00 | 146.00 | 249,835.20 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 96.4 | TON | 80.00 | 7,712.00 | 200.00 | 19,280.00 | 110.00 | 10,604.00 | 150.00 | 14,460.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,924 | SQYD | 4.00 | 19,696.00 | 3.00 | 14,772.00 | 2.00 | 9,848.00 | 4.20 | 20,680.80 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -205 | CUYD | 29.00 | -5,945.00 | 0.00 | 0.00 | 0.01 | -2.05 | 1.20 | -246.00 |
| 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 85.00 | 17,000.00 | 110.00 | 22,000.00 | 80.00 | 16,000.00 | 108.00 | 21,600.00 |
| 0015 | 602-10-00100 | Longitudinal Shoulder Joints | 83 | LNFT | 4.00 | 332.00 | 10.00 | 830.00 | 5.00 | 415.00 | 12.00 | 996.00 |
| 0016 | 707-03-00100 | Combination Concrete Curb and Gutter | 83 | LNFT | 44.00 | 3,652.00 | 75.00 | 6,225.00 | 50.00 | 4,150.00 | 36.00 | 2,988.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 38,000.00 | 38,000.00 | 35,000.00 | 35,000.00 | 15,000.00 | 15,000.00 | 9,750.00 | 9,750.00 |
| 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 263 | LNFT | 0.30 | 78.90 | 0.10 | 26.30 | 0.35 | 92.05 | 0.36 | 94.68 |
| 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 460 | LNFT | 1.00 | 460.00 | 0.50 | 230.00 | 1.00 | 460.00 | 1.40 | 644.00 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.316 | MILE | 1,000.00 | 316.00 | 2,000.00 | 632.00 | 1,000.00 | 316.00 | 840.00 | 265.44 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.897 | MILE | 700.00 | 1,327.90 | 100.00 | 189.70 | 750.00 | 1,422.75 | 850.00 | 1,612.45 |
| 0022 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 50.00 | 200.00 | 25.00 | 100.00 | 100.00 | 400.00 | 60.00 | 240.00 |
| 0023 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 50.00 | 200.00 | 25.00 | 100.00 | 100.00 | 400.00 | 68.00 | 272.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 55,000.00 | 55,000.00 | 35,000.00 | 35,000.00 | 65,000.00 | 65,000.00 | 56,500.00 | 56,500.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 860 | EACH | 5.50 | 4,730.00 | 6.00 | 5,160.00 | 6.00 | 5,160.00 | 6.25 | 5,375.00 |
| 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 263 | LNFT | 1.25 | 328.75 | 2.00 | 526.00 | 2.00 | 526.00 | 1.20 | 315.60 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 460 | LNFT | 4.00 | 1,840.00 | 4.00 | 1,840.00 | 6.00 | 2,760.00 | 4.44 | 2,042.40 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.601 | MILE | 3,000.00 | 4,803.00 | 2,700.00 | 4,322.70 | 2,700.00 | 4,322.70 | 3,300.00 | 5,283.30 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 750.00 | 88.50 | 900.00 | 106.20 | 1,000.00 | 118.00 | 840.00 | 99.12 |
| 0030 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 200.00 | 800.00 | 225.00 | 900.00 | 300.00 | 1,200.00 | 228.00 | 912.00 |
| 0031 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 222.00 | 888.00 | 225.00 | 900.00 | 300.00 | 1,200.00 | 240.00 | 960.00 |
| 0032 | 735-01-00100 | Mailboxes | 10 | EACH | 1.00 | 10.00 | 5.00 | 50.00 | 15.00 | 150.00 | 36.00 | 360.00 |
| 0033 | 735-02-00100 | Mailbox Supports (Single) | 10 | EACH | 130.00 | 1,300.00 | 230.00 | 2,300.00 | 150.00 | 1,500.00 | 180.00 | 1,800.00 |
| 0034 | 736-01-00100 | Trenching and Backfilling | 734 | LNFT | 3.50 | 2,569.00 | 3.00 | 2,202.00 | 4.00 | 2,936.00 | 3.60 | 2,642.40 |
| 0035 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) w/ 2 - #14 awg conductors | 734 | LNFT | 3.00 | 2,202.00 | 3.00 | 2,202.00 | 3.00 | 2,202.00 | 3.00 | 2,202.00 |
| 0036 | 736-09-00100 | Loop Detector | 620 | LNFT | 12.00 | 7,440.00 | 11.00 | 6,820.00 | 15.00 | 9,300.00 | 13.20 | 8,184.00 |
| 0037 | 736-10-00100 | Underground Junction Box (Type D) | 6 | EACH | 300.00 | 1,800.00 | 270.00 | 1,620.00 | 600.00 | 3,600.00 | 330.00 | 1,980.00 |
| 0038 | 736-12-01040 | Conductor (2c, #14 awg) | 570 | LNFT | 1.50 | 855.00 | 1.25 | 712.50 | 2.00 | 1,140.00 | 1.50 | 855.00 |
| 0039 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 1,450.00 | 1,450.00 | 1,100.00 | 1,100.00 | 2,000.00 | 2,000.00 | 1,548.00 | 1,548.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 | 7,741.51 | 7,741.51 |
| 0041 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 42,144 | INLF | 0.10 | 4,214.40 | 0.15 | 6,321.60 | 0.40 | 16,857.60 | 0.95 | 40,036.80 |
| 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,708 | INLF | 1.10 | 7,378.80 | 0.65 | 4,360.20 | 0.75 | 5,031.00 | 1.50 | 10,062.00 |
| 0043 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 5,000.00 | 10,000.00 | 4,000.00 | 8,000.00 | 5,000.00 | 10,000.00 | 2,040.00 | 4,080.00 |
| 0044 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.6 | MILE | 6,200.00 | 3,720.00 | 12,000.00 | 7,200.00 | 14,000.00 | 8,400.00 | 14,000.00 | 8,400.00 |
| CONTRACTOR TOTAL | 557,283.45 | 641,474.00 | 657,891.05 | 698,000.00 | ||||||||