Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 424-08-0035 | |
| Parish: Lafourche | |
| Routes: US 90 | |
| Description: SOUTH SERVICE ROAD AT LA 1 | |
| Type Const: SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $173,864.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $143,256.00 |
| 2 | 06487 | Huey Stockstill, Inc. | $178,196.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Huey Stockstill, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 0.10 | 10.00 | 5.00 | 500.00 |
| 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 65 | CUYD | 1.00 | 65.00 | 10.00 | 650.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 759.9 | TON | 80.00 | 60,792.00 | 77.00 | 58,512.30 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 107.3 | TON | 80.00 | 8,584.00 | 100.00 | 10,730.00 |
| 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 470 | SQYD | 40.00 | 18,800.00 | 70.00 | 32,900.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 5,000.00 | 5,000.00 |
| 0007 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2 | MILE | 10.00 | 20.00 | 1.00 | 2.00 |
| 0008 | 727-01-00100 | Mobilization | 1 | LUMP | 14,000.00 | 14,000.00 | 15,000.00 | 15,000.00 |
| 0009 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 1,650.00 | 1,650.00 | 1,800.00 | 1,800.00 |
| 0010 | 731-02-00100 | Reflectorized Raised Pavement Markers | 67 | EACH | 5.00 | 335.00 | 6.00 | 402.00 |
| 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1 | MILE | 2,500.00 | 2,500.00 | 2,700.00 | 2,700.00 |
| 0012 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 1,000.00 | 1,000.00 |
| 0013 | NS-500-00280 | Surface Preparation | 1 | LUMP | 10,000.00 | 10,000.00 | 49,000.00 | 49,000.00 |
| CONTRACTOR TOTAL | 143,256.00 | 178,196.30 | ||||||