Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 424-02-0088-R1 | |
| Parish: Lafayette | |
| Routes: | |
| Description: US 90 PINHOOK TO BROUSSARD | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, TRAFFIC SIGNALIZATION AND RELATED WORK | |
| Estimated Construction Cost: $20,560,497.21 | |
| Maximum Number of Days Allowed for Construction: 810 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $19,895,009.49 | 460 | $22,195,009.49 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $21,397,453.18 | 365 | $23,222,453.18 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 2,854 | SQYD | 3.00 | 8,562.00 | 5.50 | 15,697.00 |
| 0002 | 202-02-04001 | Removal of Bridge (Partial Removal) (RAILING, DECK, & END BENT WALL) | 1 | LUMP | 80,000.00 | 80,000.00 | 80,000.00 | 80,000.00 |
| 0003 | 202-02-06000 | Removal of Concrete Approach Slabs | 248 | SQYD | 19.00 | 4,712.00 | 70.00 | 17,360.00 |
| 0004 | 202-02-06040 | Removal of Concrete Box Headwall (DOUBLE BARREL 5' X 4' RCB) | 1 | EACH | 1,650.00 | 1,650.00 | 2,000.00 | 2,000.00 |
| 0005 | 202-02-06040 | Removal of Concrete Box Headwall (DOUBLE BARREL 7' X 7' RCB) | 2 | EACH | 1,650.00 | 3,300.00 | 2,000.00 | 4,000.00 |
| 0006 | 202-02-06040 | Removal of Concrete Box Headwall (SINGLE BARREL 4' X 4' RCB HEADWALL) | 2 | EACH | 850.00 | 1,700.00 | 2,000.00 | 4,000.00 |
| 0007 | 202-02-06060 | Removal of Concrete Catch Basin | 10 | EACH | 200.00 | 2,000.00 | 400.00 | 4,000.00 |
| 0008 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 |
| 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 4,318 | SQYD | 2.00 | 8,636.00 | 6.35 | 27,419.30 |
| 0010 | 202-02-06140 | Removal of Curbs (Concrete) | 340 | LNFT | 11.00 | 3,740.00 | 5.80 | 1,972.00 |
| 0011 | 202-02-14500 | Removal of Guard Rail | 1,705 | LNFT | 6.50 | 11,082.50 | 1.00 | 1,705.00 |
| 0012 | 202-02-26300 | Removal of Median / Island | 327 | SQYD | 6.50 | 2,125.50 | 6.00 | 1,962.00 |
| 0013 | 202-02-32120 | Removal of Pipe (Side Drain) (18" - 30") | 3,500 | LNFT | 7.25 | 25,375.00 | 5.50 | 19,250.00 |
| 0014 | 202-02-32120 | Removal of Pipe (Side Drain) (36" - 48") | 319 | LNFT | 8.00 | 2,552.00 | 9.00 | 2,871.00 |
| 0015 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 475.00 | 1,900.00 | 1,100.00 | 4,400.00 |
| 0016 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 3,608 | SQYD | 9.25 | 33,374.00 | 9.00 | 32,472.00 |
| 0017 | 202-02-38240 | Removal of Signs and Supports | 32 | EACH | 85.00 | 2,720.00 | 45.00 | 1,440.00 |
| 0018 | 202-02-38500 | Removal of Surfacing and Stablized Base | 18,105.6 | SQYD | 3.65 | 66,085.44 | 6.20 | 112,254.72 |
| 0019 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 |
| 0020 | 203-01-00100 | General Excavation | 47,406.5 | CUYD | 4.50 | 213,329.25 | 6.00 | 284,439.00 |
| 0021 | 203-03-00100 | Embankment | 40,209.1 | CUYD | 8.25 | 331,725.08 | 7.00 | 281,463.70 |
| 0022 | 203-05-00100 | Excavation and Embankment (FOR BRIDGE USE ONLY) | 1 | LUMP | 110,000.00 | 110,000.00 | 200,000.00 | 200,000.00 |
| 0023 | 204-02-00100 | Temporary Hay or Straw Bales | 280 | EACH | 38.00 | 10,640.00 | 20.00 | 5,600.00 |
| 0024 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 75 | EACH | 300.00 | 22,500.00 | 300.00 | 22,500.00 |
| 0025 | 204-06-00100 | Temporary Silt Fencing | 78,123 | LNFT | 3.00 | 234,369.00 | 0.50 | 39,061.50 |
| 0026 | 302-02-03000 | Class II Base Course (8" Thick) | 37,607 | SQYD | 30.25 | 1,137,611.75 | 40.00 | 1,504,280.00 |
| 0027 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 15,219.4 | SQYD | 19.75 | 300,583.15 | 21.50 | 327,217.10 |
| 0028 | 302-02-05000 | Class II Base Course (10" Thick) | 34,987.9 | SQYD | 13.50 | 472,336.65 | 17.00 | 594,794.30 |
| 0029 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 2,886.2 | SQYD | 24.75 | 71,433.45 | 26.00 | 75,041.20 |
| 0030 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 112.00 | 11,200.00 | 100.00 | 10,000.00 |
| 0031 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 5,800 | CUYD | 58.00 | 336,400.00 | 70.00 | 406,000.00 |
| 0032 | 502-01-00100 | Superpave Asphaltic Concrete | 48,828.5 | TON | 71.75 | 3,503,444.88 | 82.00 | 4,003,937.00 |
| 0033 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,097.8 | TON | 110.00 | 120,758.00 | 150.00 | 164,670.00 |
| 0034 | 508-01-00100 | Asphalt Concrete (SMA) Wearing Course | 37,397.2 | TON | 108.50 | 4,057,596.20 | 105.00 | 3,926,706.00 |
| 0035 | 509-01-00100 | Cold Planing Asphaltic Pavement | 40,143 | SQYD | 1.75 | 70,250.25 | 1.90 | 76,271.70 |
| 0036 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,673 | CUYD | 0.10 | -167.30 | 1.00 | -1,673.00 |
| 0037 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 80 | SQYD | 175.00 | 14,000.00 | 170.00 | 13,600.00 |
| 0038 | 510-02-00100 | Pavement Widening | 648.7 | SQYD | 83.00 | 53,842.10 | 98.00 | 63,572.60 |
| 0039 | 601-01-00900 | Portland Cement Concrete Pavement (12" Thick) | 2,886.2 | SQYD | 62.00 | 178,944.40 | 77.00 | 222,237.40 |
| 0040 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 6,800 | LNFT | 1.80 | 12,240.00 | 2.00 | 13,600.00 |
| 0041 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 3,250 | LNFT | 2.10 | 6,825.00 | 2.00 | 6,500.00 |
| 0042 | 602-03-00100 | Cleaning and Sealing Random cracks | 300 | LNFT | 3.75 | 1,125.00 | 3.25 | 975.00 |
| 0043 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 80 | SQYD | 170.00 | 13,600.00 | 210.00 | 16,800.00 |
| 0044 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 288 | SQYD | 160.00 | 46,080.00 | 195.00 | 56,160.00 |
| 0045 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 320 | SQYD | 150.00 | 48,000.00 | 185.00 | 59,200.00 |
| 0046 | 602-10-00100 | Longitudinal Shoulder Joints | 6,800 | LNFT | 1.85 | 12,580.00 | 1.60 | 10,880.00 |
| 0047 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 184 | LNFT | 65.00 | 11,960.00 | 80.00 | 14,720.00 |
| 0048 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 1,566 | LNFT | 43.00 | 67,338.00 | 50.00 | 78,300.00 |
| 0049 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 1,960 | LNFT | 52.25 | 102,410.00 | 55.00 | 107,800.00 |
| 0050 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 296 | LNFT | 67.75 | 20,054.00 | 77.00 | 22,792.00 |
| 0051 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 200 | LNFT | 91.00 | 18,200.00 | 95.00 | 19,000.00 |
| 0052 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 40 | LNFT | 170.00 | 6,800.00 | 100.00 | 4,000.00 |
| 0053 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 82 | LNFT | 73.50 | 6,027.00 | 72.00 | 5,904.00 |
| 0054 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 88 | LNFT | 80.50 | 7,084.00 | 66.00 | 5,808.00 |
| 0055 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 112 | LNFT | 94.00 | 10,528.00 | 105.00 | 11,760.00 |
| 0056 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 56 | LNFT | 83.50 | 4,676.00 | 65.00 | 3,640.00 |
| 0057 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 48 | LNFT | 102.00 | 4,896.00 | 115.00 | 5,520.00 |
| 0058 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 48 | LNFT | 115.00 | 5,520.00 | 125.00 | 6,000.00 |
| 0059 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 168 | LNFT | 123.50 | 20,748.00 | 115.00 | 19,320.00 |
| 0060 | 701-15-00100 | Concrete Collar | 15 | EACH | 550.00 | 8,250.00 | 1,000.00 | 15,000.00 |
| 0061 | 702-02-00300 | Manholes (R-CB-11 MOD) | 7 | EACH | 2,900.00 | 20,300.00 | 2,700.00 | 18,900.00 |
| 0062 | 702-03-00100 | Catch Basins (CB-01) | 14 | EACH | 3,000.00 | 42,000.00 | 2,800.00 | 39,200.00 |
| 0063 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,700.00 | 7,400.00 | 3,300.00 | 6,600.00 |
| 0064 | 702-03-00500 | Catch Basins (CB-06) | 7 | EACH | 3,200.00 | 22,400.00 | 4,000.00 | 28,000.00 |
| 0065 | 702-04-00100 | Adjusting Manholes | 12 | EACH | 800.00 | 9,600.00 | 750.00 | 9,000.00 |
| 0066 | 702-05-01000 | Cross Drain End Treatment (1 Barrel, 24" RCP or 30" CMP) | 1 | EACH | 2,800.00 | 2,800.00 | 2,500.00 | 2,500.00 |
| 0067 | 702-05-01040 | Cross Drain End Treatment (1 Barrel, 36" RCP or 42" CMP) | 2 | EACH | 2,800.00 | 5,600.00 | 3,000.00 | 6,000.00 |
| 0068 | 702-06-01000 | Side Drain End Treatment (1 Barrel, 18" RCP/PP or 24" CMP) | 3 | EACH | 1,500.00 | 4,500.00 | 1,800.00 | 5,400.00 |
| 0069 | 702-06-01020 | Side Drain End Treatment (1 Barrel, 24" RCP/PP or 30" CMP) | 11 | EACH | 1,500.00 | 16,500.00 | 1,800.00 | 19,800.00 |
| 0070 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 745.6 | LNFT | 35.00 | 26,096.00 | 37.00 | 27,587.20 |
| 0071 | 704-03-00100 | Blocked Out Guard Rail | 531.3 | LNFT | 18.00 | 9,563.40 | 17.00 | 9,032.10 |
| 0072 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 58.00 | 5,800.00 | 70.00 | 7,000.00 |
| 0073 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,300.00 | 9,200.00 |
| 0074 | 706-02-00200 | Concrete Drive (6" Thick) | 3,039.9 | SQYD | 35.00 | 106,396.50 | 50.00 | 151,995.00 |
| 0075 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 900 | SQYD | 32.00 | 28,800.00 | 45.00 | 40,500.00 |
| 0076 | 707-01-00200 | Concrete Curb (Barrier) | 1,750 | LNFT | 5.00 | 8,750.00 | 9.00 | 15,750.00 |
| 0077 | 707-01-00300 | Concrete Curb (Mountable) | 80 | LNFT | 5.00 | 400.00 | 9.00 | 720.00 |
| 0078 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,580 | LNFT | 14.00 | 22,120.00 | 17.50 | 27,650.00 |
| 0079 | 712-02-00100 | Sacked Concrete Revetment | 909 | SQYD | 60.00 | 54,540.00 | 65.00 | 59,085.00 |
| 0080 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 650,000.00 | 650,000.00 | 500,000.00 | 500,000.00 |
| 0081 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 60,750 | LNFT | 0.32 | 19,440.00 | 0.34 | 20,655.00 |
| 0082 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 18,753 | LNFT | 1.20 | 22,503.60 | 1.25 | 23,441.25 |
| 0083 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 88.776 | MILE | 200.00 | 17,755.20 | 290.00 | 25,745.04 |
| 0084 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 84.669 | MILE | 320.00 | 27,094.08 | 350.00 | 29,634.15 |
| 0085 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 93.18 | MILE | 700.00 | 65,226.00 | 800.00 | 74,544.00 |
| 0086 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 318 | EACH | 50.00 | 15,900.00 | 55.00 | 17,490.00 |
| 0087 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 84 | EACH | 50.00 | 4,200.00 | 55.00 | 4,620.00 |
| 0088 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 387 | EACH | 50.00 | 19,350.00 | 55.00 | 21,285.00 |
| 0089 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 23,787 | EACH | 4.50 | 107,041.50 | 5.10 | 121,313.70 |
| 0090 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 78 | EACH | 1,150.00 | 89,700.00 | 900.00 | 70,200.00 |
| 0091 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 |
| 0092 | 726-01-00100 | Bedding Material | 850 | CUYD | 85.00 | 72,250.00 | 100.00 | 85,000.00 |
| 0093 | 727-01-00100 | Mobilization | 1 | LUMP | 1,050,000.00 | 1,050,000.00 | 2,100,000.00 | 2,100,000.00 |
| 0094 | 728-01-01500 | Jacked or Bored Pipe (60") (RCP JACK & BORED WITH HEADWALL) | 472 | LNFT | 1,500.00 | 708,000.00 | 1,410.00 | 665,520.00 |
| 0095 | 729-01-00100 | Sign (Type A) | 531.3 | SQFT | 21.00 | 11,157.30 | 29.00 | 15,407.70 |
| 0096 | 729-02-00100 | Sign (Type B) | 73.8 | SQFT | 25.00 | 1,845.00 | 21.00 | 1,549.80 |
| 0097 | 729-04-00100 | Sign (Type D) | 204 | SQFT | 27.00 | 5,508.00 | 21.00 | 4,284.00 |
| 0098 | 729-08-00100 | Mounting (2 1/2" Size Post) | 2 | EACH | 900.00 | 1,800.00 | 950.00 | 1,900.00 |
| 0099 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 80.00 | 640.00 | 75.00 | 600.00 |
| 0100 | 730-15-01000 | Relocate Light Poles (STEEL) (SINGLE ARM) | 1 | EACH | 2,500.00 | 2,500.00 | 2,250.00 | 2,250.00 |
| 0101 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7,929 | EACH | 5.25 | 41,627.25 | 5.50 | 43,609.50 |
| 0102 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 20,250 | LNFT | 1.05 | 21,262.50 | 1.10 | 22,275.00 |
| 0103 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 4,611 | LNFT | 3.75 | 17,291.25 | 4.00 | 18,444.00 |
| 0104 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,640 | LNFT | 4.00 | 6,560.00 | 4.00 | 6,560.00 |
| 0105 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 31.06 | MILE | 2,800.00 | 86,968.00 | 2,900.00 | 90,074.00 |
| 0106 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 28.223 | MILE | 750.00 | 21,167.25 | 790.00 | 22,296.17 |
| 0107 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 28 | EACH | 210.00 | 5,880.00 | 215.00 | 6,020.00 |
| 0108 | 732-04-01060 | Plastic Pavement Legends and Symbols (Arrow - Triple) | 3 | EACH | 210.00 | 630.00 | 220.00 | 660.00 |
| 0109 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 66 | EACH | 200.00 | 13,200.00 | 215.00 | 14,190.00 |
| 0110 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 37 | EACH | 200.00 | 7,400.00 | 215.00 | 7,955.00 |
| 0111 | 732-04-15000 | Plastic Pavement Legends and Symbols (OK) | 4 | EACH | 190.00 | 760.00 | 200.00 | 800.00 |
| 0112 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 129 | EACH | 200.00 | 25,800.00 | 215.00 | 27,735.00 |
| 0113 | 732-04-19080 | Plastic Pavement Legends and Symbols (Shield - US) (Preformed Heat Applied Retroreflective Thermoplastic) | 3 | EACH | 550.00 | 1,650.00 | 575.00 | 1,725.00 |
| 0114 | 732-04-20000 | Plastic Pavement Legends and Symbols (TO) | 3 | EACH | 190.00 | 570.00 | 200.00 | 600.00 |
| 0115 | 732-05-00100 | Removal of Existing Markings | 14.796 | MILE | 5,250.00 | 77,679.00 | 5,500.00 | 81,378.00 |
| 0116 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 1,955 | LNFT | 8.50 | 16,617.50 | 7.00 | 13,685.00 |
| 0117 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 1,795 | LNFT | 12.00 | 21,540.00 | 9.75 | 17,501.25 |
| 0118 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 2 | EACH | 7,000.00 | 14,000.00 | 6,500.00 | 13,000.00 |
| 0119 | 736-04-04100 | Signal Support (30' Single Mast Arm) | 2 | EACH | 7,300.00 | 14,600.00 | 7,500.00 | 15,000.00 |
| 0120 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 2 | EACH | 8,000.00 | 16,000.00 | 7,600.00 | 15,200.00 |
| 0121 | 736-04-04140 | Signal Support (40' Single Mast Arm) | 5 | EACH | 9,000.00 | 45,000.00 | 8,200.00 | 41,000.00 |
| 0122 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 7 | EACH | 9,500.00 | 66,500.00 | 9,000.00 | 63,000.00 |
| 0123 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 10 | EACH | 10,000.00 | 100,000.00 | 9,500.00 | 95,000.00 |
| 0124 | 736-04-05060 | Signal Support (Clamp on 20' Arm) | 1 | EACH | 1,850.00 | 1,850.00 | 1,600.00 | 1,600.00 |
| 0125 | 736-04-05100 | Signal Support (Clamp on 30' Arm) | 3 | EACH | 2,300.00 | 6,900.00 | 2,100.00 | 6,300.00 |
| 0126 | 736-04-05120 | Signal Support (Clamp on 35' Arm) | 1 | EACH | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 |
| 0127 | 736-04-05140 | Signal Support (Clamp on 40' Arm) | 4 | EACH | 3,500.00 | 14,000.00 | 3,000.00 | 12,000.00 |
| 0128 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 66 | EACH | 800.00 | 52,800.00 | 1,000.00 | 66,000.00 |
| 0129 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT, Y, LT. G) | 32 | EACH | 800.00 | 25,600.00 | 1,000.00 | 32,000.00 |
| 0130 | 736-05-02040 | Signal Heads (3 Section, 12" Led Lens, R, RT. Y, RT. G) | 11 | EACH | 800.00 | 8,800.00 | 1,000.00 | 11,000.00 |
| 0132 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 4 | EACH | 1,300.00 | 5,200.00 | 1,700.00 | 6,800.00 |
| 0133 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 2 | EACH | 1,200.00 | 2,400.00 | 1,600.00 | 3,200.00 |
| 0134 | 736-06-00300 | Signal Service (Pedestal Required, Separate Disconnect for Street Lights) | 10 | EACH | 1,400.00 | 14,000.00 | 1,300.00 | 13,000.00 |
| 0135 | 736-06-00600 | Signal Service (Existing Pole) | 10 | EACH | 750.00 | 7,500.00 | 825.00 | 8,250.00 |
| 0136 | 736-08-02000 | Signal Controller (TS-2, Type 2; Type 3 Cabinet) | 3 | EACH | 17,000.00 | 51,000.00 | 15,500.00 | 46,500.00 |
| 0137 | 736-08-02020 | Signal Controller (TS-2, Type 2; Type 6 Cabinet) | 7 | EACH | 21,000.00 | 147,000.00 | 18,600.00 | 130,200.00 |
| 0138 | 736-10-00200 | Underground Junction Box (Type E) | 20 | EACH | 350.00 | 7,000.00 | 425.00 | 8,500.00 |
| 0139 | 736-10-00300 | Underground Junction Box (Type F) | 18 | EACH | 400.00 | 7,200.00 | 550.00 | 9,900.00 |
| 0140 | 736-10-00500 | Underground Junction Box (Type H) | 7 | EACH | 800.00 | 5,600.00 | 950.00 | 6,650.00 |
| 0141 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 3,910 | LNFT | 5.25 | 20,527.50 | 3.40 | 13,294.00 |
| 0142 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 250 | LNFT | 9.00 | 2,250.00 | 7.30 | 1,825.00 |
| 0143 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 1,900 | LNFT | 5.00 | 9,500.00 | 3.50 | 6,650.00 |
| 0144 | 736-12-07000 | Conductor (6 pair,Twisted Pair, isma 20-6 / #19 awg) | 4,200 | LNFT | 3.50 | 14,700.00 | 2.69 | 11,298.00 |
| 0145 | 736-13-00400 | Cable (6C Signal) | 2,850 | LNFT | 1.30 | 3,705.00 | 2.10 | 5,985.00 |
| 0146 | 736-13-00500 | Cable (10C Signal) | 10,700 | LNFT | 1.60 | 17,120.00 | 2.50 | 26,750.00 |
| 0147 | 739-01-00100 | Hydro-Seeding | 93 | ACRE | 900.00 | 83,700.00 | 1,000.00 | 93,000.00 |
| 0148 | 740-01-00100 | Construction Layout | 1 | LUMP | 350,000.00 | 350,000.00 | 100,000.00 | 100,000.00 |
| 0149 | 804-01-00400 | Precast Concrete Piles (18") | 800 | LNFT | 125.00 | 100,000.00 | 58.00 | 46,400.00 |
| 0150 | 804-01-00600 | Precast Concrete Piles (24") | 1,835 | LNFT | 175.00 | 321,125.00 | 120.00 | 220,200.00 |
| 0151 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 |
| 0152 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 20.35 | CUYD | 1,600.00 | 32,560.00 | 1,650.00 | 33,577.50 |
| 0153 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 72.8 | CUYD | 1,500.00 | 109,200.00 | 1,650.00 | 120,120.00 |
| 0154 | 805-01-00700 | Class A Concrete (Bents) | 126.94 | CUYD | 1,750.00 | 222,145.00 | 1,400.00 | 177,716.00 |
| 0155 | 805-03-00100 | Class AA Concrete | 407.3 | CUYD | 1,050.00 | 427,665.00 | 1,000.00 | 407,300.00 |
| 0156 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 2,231.7 | LNFT | 115.00 | 256,645.50 | 75.00 | 167,377.50 |
| 0157 | 805-12-33000 | Reinforced Concrete Box Culverts (4' x 4') (Extension) | 48 | LNFT | 760.00 | 36,480.00 | 750.00 | 36,000.00 |
| 0158 | 805-12-33020 | Reinforced Concrete Box Culverts (5' x 4') (Extension) | 32 | LNFT | 800.00 | 25,600.00 | 1,300.00 | 41,600.00 |
| 0159 | 805-12-36000 | Reinforced Concrete Box Culverts (7' x 7') (Extension) | 80 | LNFT | 910.00 | 72,800.00 | 1,000.00 | 80,000.00 |
| 0160 | 806-01-00100 | Deformed Reinforcing Steel | 165,253 | LB | 1.30 | 214,828.90 | 0.80 | 132,202.40 |
| 0161 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 100,000.00 | 100,000.00 | 15,000.00 | 15,000.00 |
| 0162 | 810-01-00100 | Concrete Railing (Standard Barrier) | 824 | LNFT | 85.00 | 70,040.00 | 72.00 | 59,328.00 |
| 0163 | 813-01-00100 | Concrete Approach Slabs | 944.14 | SQYD | 260.00 | 245,476.40 | 250.00 | 236,035.00 |
| 0164 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 160,000 | LNFT | 1.20 | 192,000.00 | 1.55 | 248,000.00 |
| 0165 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 43,000 | LNFT | 1.35 | 58,050.00 | 1.55 | 66,650.00 |
| 0166 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 203,000 | LNFT | 0.80 | 162,400.00 | 0.50 | 101,500.00 |
| 0167 | NS-500-00280 | Surface Preparation | 1 | LUMP | 85,000.00 | 85,000.00 | 150,000.00 | 150,000.00 |
| 0168 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 17,388 | INLF | 0.15 | 2,608.20 | 1.20 | 20,865.60 |
| 0169 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 56,952 | INLF | 0.13 | 7,403.76 | 1.10 | 62,647.20 |
| 0170 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 10,734 | INLF | 1.20 | 12,880.80 | 1.25 | 13,417.50 |
| 0171 | NS-700-00180 | Impact Attenuator (Construction Zone) | 2 | EACH | 9,400.00 | 18,800.00 | 16,000.00 | 32,000.00 |
| 0172 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 16,000.00 | 64,000.00 | 7,000.00 | 28,000.00 |
| 0173 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 14.796 | MILE | 800.00 | 11,836.80 | 725.00 | 10,727.10 |
| 0174 | NS-729-00004 | Square Steel Tubular Sign Posts and Hardware (2" x 2")(1.74lb/ft) | 760 | LNFT | 6.00 | 4,560.00 | 8.50 | 6,460.00 |
| 0175 | NS-729-00006 | Square Steel Tubular Sign Posts and Hardware (2 1/4" x 2 1/4") | 228 | LNFT | 15.00 | 3,420.00 | 20.00 | 4,560.00 |
| 0176 | NS-736-00020 | Video Detector (MVP) Device | 34 | EACH | 6,300.00 | 214,200.00 | 6,500.00 | 221,000.00 |
| 0177 | NS-736-00040 | Video Detection (MVP) System | 11 | EACH | 4,000.00 | 44,000.00 | 3,900.00 | 42,900.00 |
| 0178 | NS-MSC-00120 | Drainage Structure (CONVERT CATCH BASIN TO MANHOLE) | 1 | EACH | 5,300.00 | 5,300.00 | 3,000.00 | 3,000.00 |
| 0179 | 736-01-00100 | Trenching and Backfilling | 4,000 | LNFT | 3.75 | 15,000.00 | 4.20 | 16,800.00 |
| 0180 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 3 | EACH | 1,100.00 | 3,300.00 | 1,300.00 | 3,900.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 19,895,009.49 | 21,397,453.18 | ||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 2,300,000.00 | 1,825,000.00 | ||||||
| TOTAL BID | 22,195,009.49 | 23,222,453.18 | ||||||