Bid Tabulations
Letting of
02/24/2010
LA DOTD Headquarters
| Lead Project: 415-04-0010 | |
| Parish: Tangipahoa | |
| Routes: LA 1062 | |
| Description: JCT. LA 40 - JCT. LA 445 | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $2,024,575.46 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,870,022.87 |
| 2 | 06276 | Barriere Construction Co., LLC. | $1,923,615.34 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Barriere Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-04000 | Removal of Bridge (For Removal of Timber Bridges at Stations 187+40.80 and 272+94.40) | 2 | EACH | 11,000.00 | 22,000.00 | 5,100.00 | 10,200.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 338 | LNFT | 2.00 | 676.00 | 3.00 | 1,014.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (At Various Locations) | 482 | LNFT | 6.00 | 2,892.00 | 20.00 | 9,640.00 |
| 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 60 | EACH | 16.00 | 960.00 | 15.00 | 900.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 870 | CUYD | 19.89 | 17,304.30 | 10.00 | 8,700.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 336 | EACH | 22.00 | 7,392.00 | 11.00 | 3,696.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 3,900 | LNFT | 3.00 | 11,700.00 | 3.00 | 11,700.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,772 | CUYD | 69.00 | 122,268.00 | 20.00 | 35,440.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 8,061.1 | TON | 56.00 | 451,421.60 | 72.00 | 580,399.20 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,563.2 | TON | 108.00 | 168,825.60 | 1.00 | 1,563.20 |
| 0011 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 49,446 | GAL | 3.20 | 158,227.20 | 3.20 | 158,227.20 |
| 0012 | 507-02-00200 | Aggregate (S2) | 72,714 | SQYD | 0.90 | 65,442.60 | 0.74 | 53,808.36 |
| 0013 | 507-02-00300 | Aggregate (S3) | 72,714 | SQYD | 0.75 | 54,535.50 | 0.87 | 63,261.18 |
| 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 71,500 | SQYD | 0.75 | 53,625.00 | 1.20 | 85,800.00 |
| 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,234 | CUYD | 21.00 | -46,914.00 | 15.00 | -33,510.00 |
| 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,865 | SQYD | 66.00 | 123,090.00 | 40.00 | 74,600.00 |
| 0017 | 510-02-00100 | Pavement Widening | 1,383.6 | SQYD | 44.00 | 60,878.40 | 50.00 | 69,180.00 |
| 0018 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 178 | LNFT | 115.00 | 20,470.00 | 120.00 | 21,360.00 |
| 0019 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 128 | LNFT | 120.00 | 15,360.00 | 120.00 | 15,360.00 |
| 0020 | 701-02-02120 | Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) | 40 | LNFT | 180.00 | 7,200.00 | 175.00 | 7,000.00 |
| 0021 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 42 | LNFT | 215.00 | 9,030.00 | 225.00 | 9,450.00 |
| 0022 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 96 | LNFT | 265.00 | 25,440.00 | 325.00 | 31,200.00 |
| 0023 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 4 | LNFT | 47.00 | 188.00 | 300.00 | 1,200.00 |
| 0024 | 701-13-01040 | Corrugated Metal Pipe Arch (Extension) (24" Equiv.) | 4 | LNFT | 115.00 | 460.00 | 300.00 | 1,200.00 |
| 0025 | 701-15-00100 | Concrete Collar | 1 | EACH | 415.00 | 415.00 | 1,600.00 | 1,600.00 |
| 0026 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,100.00 | 2,100.00 | 3,100.00 | 3,100.00 |
| 0027 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 150 | LNFT | 32.00 | 4,800.00 | 30.00 | 4,500.00 |
| 0028 | 704-03-00100 | Blocked Out Guard Rail | 137.5 | LNFT | 16.00 | 2,200.00 | 16.00 | 2,200.00 |
| 0029 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,050.00 | 8,200.00 |
| 0030 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 60 | SQYD | 75.00 | 4,500.00 | 90.00 | 5,400.00 |
| 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,000.00 | 17,000.00 | 145,000.00 | 145,000.00 |
| 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 1.00 | 36.00 | 1.00 | 36.00 |
| 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.216 | MILE | 165.00 | 3,005.64 | 25.00 | 455.40 |
| 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.948 | MILE | 360.00 | 2,141.28 | 25.00 | 148.70 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.198 | MILE | 675.00 | 27,133.65 | 100.00 | 4,019.80 |
| 0036 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 2 | EACH | 310.00 | 620.00 | 100.00 | 200.00 |
| 0037 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 3,208 | EACH | 2.00 | 6,416.00 | 1.50 | 4,812.00 |
| 0038 | 717-01-00100 | Seeding | 30 | LB | 16.00 | 480.00 | 20.00 | 600.00 |
| 0039 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.00 | 1,000.00 | 1.00 | 1,000.00 |
| 0040 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 357 | SQYD | 1.60 | 571.20 | 1.60 | 571.20 |
| 0041 | 726-01-00100 | Bedding Material | 237.5 | CUYD | 75.00 | 17,812.50 | 65.00 | 15,437.50 |
| 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 104,350.00 | 104,350.00 | 180,000.00 | 180,000.00 |
| 0043 | 729-16-00200 | Object Marker Assembly (Type 2) | 44 | EACH | 52.00 | 2,288.00 | 40.00 | 1,760.00 |
| 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 80.00 | 640.00 | 76.00 | 608.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,063 | EACH | 4.75 | 5,049.25 | 6.00 | 6,378.00 |
| 0046 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 55 | LNFT | 1.00 | 55.00 | 0.55 | 30.25 |
| 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 18 | LNFT | 3.00 | 54.00 | 4.50 | 81.00 |
| 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.099 | MILE | 2,350.00 | 47,232.65 | 2,600.00 | 52,257.40 |
| 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.974 | MILE | 750.00 | 2,230.50 | 875.00 | 2,602.25 |
| 0050 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 525.00 | 525.00 | 410.00 | 410.00 |
| 0051 | 735-01-00100 | Mailboxes | 68 | EACH | 1.00 | 68.00 | 2.00 | 136.00 |
| 0052 | 735-02-00100 | Mailbox Supports (Single) | 64 | EACH | 100.00 | 6,400.00 | 100.00 | 6,400.00 |
| 0053 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 175.00 | 350.00 | 175.00 | 350.00 |
| 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 | 32,500.00 | 32,500.00 |
| 0055 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 53.27 | CUYD | 1,100.00 | 58,597.00 | 810.00 | 43,148.70 |
| 0056 | 805-12-21020 | Reinforced Concrete Box Culverts (6' x 5') (Precast) | 96 | LNFT | 650.00 | 62,400.00 | 700.00 | 67,200.00 |
| 0057 | 805-12-23000 | Reinforced Concrete Box Culverts (7' x 7') (Precast) | 132 | LNFT | 750.00 | 99,000.00 | 775.00 | 102,300.00 |
| 0058 | 806-01-00100 | Deformed Reinforcing Steel | 3,680 | LB | 1.00 | 3,680.00 | 1.30 | 4,784.00 |
| 0059 | NS-200-00020 | Cleaning Existing Ditches | 2,000 | LNFT | 5.00 | 10,000.00 | 2.00 | 4,000.00 |
| CONTRACTOR TOTAL | 1,870,022.87 | 1,923,615.34 | ||||||