Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 414-01-0041 | |
| Parish: East Baton Rouge | |
| Routes: LA 30 | |
| Description: LA 73 - 400' SOUTH OF SKIP BERTMAN DRIVE | |
| Type Const: Grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete overlay and related work | |
| Estimated Construction Cost: $2,240,889.38 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $2,436,353.04 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,696,278.10 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $2,986,234.19 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - F.G. Sullivan, Jr. Contractor LLC |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - Coastal Bridge Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 100 | LNFT | 8.00 | 800.00 | 12.00 | 1,200.00 | 45.00 | 4,500.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 2.00 | 1,000.00 | 10.00 | 5,000.00 | 30.00 | 15,000.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 150.00 | 15,000.00 | 25.00 | 2,500.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 9,228.2 | TON | 90.00 | 830,538.00 | 96.00 | 885,907.20 | 94.25 | 869,757.85 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,777.7 | TON | 90.00 | 159,993.00 | 135.00 | 239,989.50 | 1.00 | 1,777.70 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 83,894 | SQYD | 3.00 | 251,682.00 | 2.60 | 218,124.40 | 2.75 | 230,708.50 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,496 | CUYD | 0.01 | -34.96 | 0.00 | 0.00 | 0.01 | -34.96 |
| 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 3,952 | SQYD | 110.00 | 434,720.00 | 100.00 | 395,200.00 | 75.00 | 296,400.00 |
| 0009 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 9,360 | LNFT | 1.75 | 16,380.00 | 2.00 | 18,720.00 | 1.50 | 14,040.00 |
| 0010 | 602-03-00100 | Cleaning and Sealing Random cracks | 400 | LNFT | 2.50 | 1,000.00 | 6.00 | 2,400.00 | 5.00 | 2,000.00 |
| 0011 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 210 | SQYD | 230.00 | 48,300.00 | 230.00 | 48,300.00 | 250.00 | 52,500.00 |
| 0012 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 445 | SQYD | 225.00 | 100,125.00 | 220.00 | 97,900.00 | 250.00 | 111,250.00 |
| 0013 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,177 | SQYD | 160.00 | 188,320.00 | 200.00 | 235,400.00 | 175.00 | 205,975.00 |
| 0014 | 702-04-00100 | Adjusting Manholes | 40 | EACH | 200.00 | 8,000.00 | 750.00 | 30,000.00 | 1,200.00 | 48,000.00 |
| 0015 | 702-04-00200 | Adjusting Catch Basins | 30 | EACH | 350.00 | 10,500.00 | 1,600.00 | 48,000.00 | 2,000.00 | 60,000.00 |
| 0016 | 707-03-00100 | Combination Concrete Curb and Gutter | 100 | LNFT | 55.00 | 5,500.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 131,000.00 | 131,000.00 | 150,000.00 | 150,000.00 | 400,000.00 | 400,000.00 |
| 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,250 | LNFT | 0.30 | 375.00 | 1.00 | 1,250.00 | 0.25 | 312.50 |
| 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,000 | LNFT | 1.10 | 2,200.00 | 2.50 | 5,000.00 | 0.75 | 1,500.00 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.8 | MILE | 300.00 | 4,140.00 | 500.00 | 6,900.00 | 400.00 | 5,520.00 |
| 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.66 | MILE | 100.00 | 1,266.00 | 450.00 | 5,697.00 | 1.00 | 12.66 |
| 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.74 | MILE | 100.00 | 2,874.00 | 400.00 | 11,496.00 | 1.00 | 28.74 |
| 0023 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 36 | EACH | 25.00 | 900.00 | 60.00 | 2,160.00 | 45.00 | 1,620.00 |
| 0024 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 18 | EACH | 25.00 | 450.00 | 85.00 | 1,530.00 | 45.00 | 810.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 102,000.00 | 102,000.00 | 150,000.00 | 150,000.00 | 275,000.00 | 275,000.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 862 | EACH | 5.00 | 4,310.00 | 6.50 | 5,603.00 | 5.25 | 4,525.50 |
| 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,250 | LNFT | 1.00 | 1,250.00 | 2.00 | 2,500.00 | 1.35 | 1,687.50 |
| 0028 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,000 | LNFT | 3.70 | 7,400.00 | 5.25 | 10,500.00 | 4.50 | 9,000.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.58 | MILE | 2,700.00 | 25,866.00 | 3,000.00 | 28,740.00 | 2,500.00 | 23,950.00 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.22 | MILE | 700.00 | 2,954.00 | 1,000.00 | 4,220.00 | 850.00 | 3,587.00 |
| 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 36 | EACH | 200.00 | 7,200.00 | 250.00 | 9,000.00 | 215.00 | 7,740.00 |
| 0032 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 18 | EACH | 200.00 | 3,600.00 | 260.00 | 4,680.00 | 215.00 | 3,870.00 |
| 0033 | 739-01-00100 | Hydro-Seeding | 2.79 | ACRE | 1,100.00 | 3,069.00 | 1,500.00 | 4,185.00 | 1,500.00 | 4,185.00 |
| 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 46,000.00 | 46,000.00 | 15,000.00 | 15,000.00 | 290,000.00 | 290,000.00 |
| 0035 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 53,352 | INLF | 0.50 | 26,676.00 | 0.50 | 26,676.00 | 0.60 | 32,011.20 |
| 0036 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 2 | EACH | 500.00 | 1,000.00 | 2,000.00 | 4,000.00 | 250.00 | 500.00 |
| CONTRACTOR TOTAL | 2,436,353.04 | 2,696,278.10 | 2,986,234.19 | |||||||