Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 413-01-0016 | |
| Parish: Terrebonne | |
| Routes: LA 311 | |
| Description: 7 LEFT TURN LANES ON LA 311 | |
| Type Const: ASPHALTIC OVERLAY WIDENING AND STRIPING | |
| Estimated Construction Cost: $566,887.66 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06487 | Huey Stockstill, Inc. | $666,063.20 |
| 2 | 06276 | Barriere Construction Co., LLC | $674,694.35 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Huey Stockstill, Inc. |
- 2 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 520 | SQYD | 25.00 | 13,000.00 | 57.00 | 29,640.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 250 | CUYD | 10.00 | 2,500.00 | 46.00 | 11,500.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 3,332.9 | TON | 120.00 | 399,948.00 | 105.00 | 349,954.50 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 235 | TON | 120.00 | 28,200.00 | 150.00 | 35,250.00 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 5,255 | SQYD | 3.00 | 15,765.00 | 5.00 | 26,275.00 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | 146 | CUYD | 0.00 | 0.00 | 1.00 | 146.00 |
| 0007 | 510-02-00100 | Pavement Widening | 520 | SQYD | 80.00 | 41,600.00 | 89.00 | 46,280.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 42,000.00 | 42,000.00 | 46,500.00 | 46,500.00 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.15 | MILE | 400.00 | 460.00 | 1.00 | 1.15 |
| 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.9 | MILE | 10.00 | 59.00 | 1.00 | 5.90 |
| 0011 | 717-01-00100 | Seeding | 21.3 | LB | 8.00 | 170.40 | 26.00 | 553.80 |
| 0012 | 718-01-00100 | Fertilizer | 710 | LB | 0.30 | 213.00 | 1.25 | 887.50 |
| 0013 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 65,000.00 | 65,000.00 |
| 0014 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,238 | EACH | 5.00 | 16,190.00 | 5.00 | 16,190.00 |
| 0015 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 505 | LNFT | 1.00 | 505.00 | 1.00 | 505.00 |
| 0016 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,746 | LNFT | 3.00 | 5,238.00 | 3.00 | 5,238.00 |
| 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.9 | MILE | 2,400.00 | 14,160.00 | 2,400.00 | 14,160.00 |
| 0018 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.15 | MILE | 1,000.00 | 150.00 | 1,050.00 | 157.50 |
| 0019 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 180.00 | 2,880.00 | 168.00 | 2,688.00 |
| 0020 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 200.00 | 1,600.00 | 184.00 | 1,472.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,400.00 | 3,400.00 | 4,200.00 | 4,200.00 |
| 0022 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 14,472 | INLF | 0.90 | 13,024.80 | 1.25 | 18,090.00 |
| CONTRACTOR TOTAL | 666,063.20 | 674,694.35 | ||||||