Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 410-01-0034-R1 | |
| Parish: Orleans | |
| Routes: | |
| Description: GENERAL DEGAULLE CROSSINGS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $29,744,467.11 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., Llc | $20,160,138.41 | 700 | $23,660,138.41 |
| 2 | 34567 | James Construction Group LLC | $23,299,396.90 | 745 | $27,024,396.90 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $24,460,867.70 | 775 | $28,335,867.70 |
| 4 | 14964 | Johnson Bros. Corp. Of La | $25,388,187.25 | 730 | $29,038,187.25 |
| 5 | 39462 | JB James Construction LLC | $26,250,439.95 | 730 | $29,900,439.95 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., Llc |
- 2 - James Construction Group LLC |
- 3 - Boh Bros. Construction Co., LLC. |
- 4 - Johnson Bros. Corp. Of La |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 140,000.00 | 140,000.00 | 140,000.00 | 140,000.00 | 105,000.00 | 105,000.00 | 110,000.00 | 110,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 3,339.3 | LNFT | 11.50 | 38,401.95 | 6.00 | 20,035.80 | 5.00 | 16,696.50 | 4.30 | 14,358.99 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 549 | SQYD | 18.35 | 10,074.15 | 15.00 | 8,235.00 | 20.00 | 10,980.00 | 11.50 | 6,313.50 |
| 0004 | 202-02-32180 | Removal of Pipe Headwalls | 20 | EACH | 3,700.00 | 74,000.00 | 1,500.00 | 30,000.00 | 600.00 | 12,000.00 | 1,050.00 | 21,000.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 186 | SQYD | 13.50 | 2,511.00 | 28.00 | 5,208.00 | 20.00 | 3,720.00 | 26.50 | 4,929.00 |
| 0006 | 202-02-38200 | Removal of Signs | 5 | EACH | 2,200.00 | 11,000.00 | 150.00 | 750.00 | 225.00 | 1,125.00 | 500.00 | 2,500.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,864.6 | SQYD | 11.15 | 65,390.29 | 6.00 | 35,187.60 | 10.00 | 58,646.00 | 11.50 | 67,442.90 |
| 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,875.00 | 2,875.00 | 2,500.00 | 2,500.00 | 2,800.00 | 2,800.00 | 2,600.00 | 2,600.00 |
| 0009 | 203-01-00100 | General Excavation | 3,622 | CUYD | 15.00 | 54,330.00 | 12.00 | 43,464.00 | 18.00 | 65,196.00 | 9.00 | 32,598.00 |
| 0010 | 203-02-00100 | Drainage Excavation | 14,059 | CUYD | 11.50 | 161,678.50 | 15.00 | 210,885.00 | 15.00 | 210,885.00 | 12.75 | 179,252.25 |
| 0011 | 203-03-00100 | Embankment | 1,587 | CUYD | 37.00 | 58,719.00 | 10.00 | 15,870.00 | 25.00 | 39,675.00 | 10.10 | 16,028.70 |
| 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 1,780 | CUYD | 33.00 | 58,740.00 | 25.00 | 44,500.00 | 30.00 | 53,400.00 | 26.50 | 47,170.00 |
| 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 457 | CUYD | 19.40 | 8,865.80 | 30.00 | 13,710.00 | 25.00 | 11,425.00 | 16.70 | 7,631.90 |
| 0014 | 203-08-00100 | Geotextile Fabric | 13,058 | SQYD | 1.20 | 15,669.60 | 2.00 | 26,116.00 | 1.50 | 19,587.00 | 1.10 | 14,363.80 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 4,807 | LNFT | 1.00 | 4,807.00 | 3.00 | 14,421.00 | 1.00 | 4,807.00 | 2.70 | 12,978.90 |
| 0016 | 302-01-00500 | Class II Base Course (Asphaltic Concrete Base on Embankment Layer) | 105.7 | CUYD | 221.50 | 23,412.55 | 250.00 | 26,425.00 | 250.00 | 26,425.00 | 236.00 | 24,945.20 |
| 0017 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 5,431.3 | SQYD | 24.40 | 132,523.72 | 25.00 | 135,782.50 | 19.00 | 103,194.70 | 15.50 | 84,185.15 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 1,260.4 | TON | 134.00 | 168,893.60 | 145.00 | 182,758.00 | 145.00 | 182,758.00 | 143.50 | 180,867.40 |
| 0019 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 649.9 | TON | 134.00 | 87,086.60 | 145.00 | 94,235.50 | 145.00 | 94,235.50 | 143.50 | 93,260.65 |
| 0020 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 133 | LNFT | 125.00 | 16,625.00 | 80.00 | 10,640.00 | 223.00 | 29,659.00 | 124.00 | 16,492.00 |
| 0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 40 | LNFT | 225.00 | 9,000.00 | 100.00 | 4,000.00 | 273.00 | 10,920.00 | 171.00 | 6,840.00 |
| 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 60 | LNFT | 250.00 | 15,000.00 | 125.00 | 7,500.00 | 324.00 | 19,440.00 | 194.00 | 11,640.00 |
| 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 56 | LNFT | 300.00 | 16,800.00 | 200.00 | 11,200.00 | 400.00 | 22,400.00 | 225.00 | 12,600.00 |
| 0024 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 14 | LNFT | 325.00 | 4,550.00 | 220.00 | 3,080.00 | 520.00 | 7,280.00 | 295.00 | 4,130.00 |
| 0025 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 19 | LNFT | 366.00 | 6,954.00 | 105.00 | 1,995.00 | 300.00 | 5,700.00 | 125.00 | 2,375.00 |
| 0026 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 32 | LNFT | 440.00 | 14,080.00 | 200.00 | 6,400.00 | 480.00 | 15,360.00 | 170.00 | 5,440.00 |
| 0027 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 23 | LNFT | 240.00 | 5,520.00 | 250.00 | 5,750.00 | 500.00 | 11,500.00 | 240.00 | 5,520.00 |
| 0028 | 702-02-00100 | Manholes (MH-06) | 11 | EACH | 9,500.00 | 104,500.00 | 6,500.00 | 71,500.00 | 6,500.00 | 71,500.00 | 7,850.00 | 86,350.00 |
| 0029 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 9,100.00 | 9,100.00 | 6,000.00 | 6,000.00 | 8,000.00 | 8,000.00 | 7,625.00 | 7,625.00 |
| 0030 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 9,200.00 | 9,200.00 | 7,500.00 | 7,500.00 | 9,000.00 | 9,000.00 | 7,760.00 | 7,760.00 |
| 0031 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 9,100.00 | 9,100.00 | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | 9,100.00 | 9,100.00 |
| 0032 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 4,200.00 | 25,200.00 | 2,200.00 | 13,200.00 | 600.00 | 3,600.00 | 2,276.00 | 13,656.00 |
| 0033 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 4,200.00 | 4,200.00 | 2,500.00 | 2,500.00 | 900.00 | 900.00 | 2,200.00 | 2,200.00 |
| 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 767.9 | SQYD | 69.00 | 52,985.10 | 60.00 | 46,074.00 | 60.00 | 46,074.00 | 50.00 | 38,395.00 |
| 0035 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 180.4 | SQYD | 65.00 | 11,726.00 | 95.00 | 17,138.00 | 65.00 | 11,726.00 | 50.00 | 9,020.00 |
| 0036 | 706-04-00100 | Handicapped Curb Ramps | 46 | EACH | 1,150.00 | 52,900.00 | 750.00 | 34,500.00 | 2,200.00 | 101,200.00 | 990.00 | 45,540.00 |
| 0037 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,308 | LNFT | 36.00 | 119,088.00 | 20.00 | 66,160.00 | 30.00 | 99,240.00 | 39.00 | 129,012.00 |
| 0038 | 712-02-00100 | Sacked Concrete Revetment | 891 | SQYD | 86.00 | 76,626.00 | 125.00 | 111,375.00 | 80.00 | 71,280.00 | 88.00 | 78,408.00 |
| 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 49,000.00 | 49,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 |
| 0040 | 718-01-00100 | Fertilizer | 7,000 | LB | 0.40 | 2,800.00 | 0.35 | 2,450.00 | 0.40 | 2,800.00 | 0.40 | 2,800.00 |
| 0041 | 719-01-02100 | Plants (Tree) (Container) (3 1/2" diameter) Tuscarora Crape Myrtle | 12 | EACH | 518.00 | 6,216.00 | 450.00 | 5,400.00 | 500.00 | 6,000.00 | 610.00 | 7,320.00 |
| 0042 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) Indian Hawthorn | 124 | EACH | 40.25 | 4,991.00 | 35.00 | 4,340.00 | 40.00 | 4,960.00 | 35.00 | 4,340.00 |
| 0043 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 118,000.00 | 118,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0044 | 723-01-00100 | Granular Material (Net Section) | 3,989 | CUYD | 19.40 | 77,386.60 | 55.00 | 219,395.00 | 35.00 | 139,615.00 | 47.00 | 187,483.00 |
| 0045 | 726-01-00100 | Bedding Material | 51.2 | CUYD | 100.00 | 5,120.00 | 85.00 | 4,352.00 | 75.00 | 3,840.00 | 28.50 | 1,459.20 |
| 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 2,010,000.00 | 2,010,000.00 | 1,550,000.00 | 1,550,000.00 | 2,450,000.00 | 2,450,000.00 | 2,500,000.00 | 2,500,000.00 |
| 0047 | 729-01-00100 | Sign (Type A) | 65 | SQFT | 48.00 | 3,120.00 | 15.00 | 975.00 | 45.00 | 2,925.00 | 42.00 | 2,730.00 |
| 0048 | 730-15-01000 | Relocate Light Poles (Sta. 106+94.63, 98.74' Rt.; Sta. 107+23.66, 98.48' Rt.; and Sta. 107+23.90, 40.76' Lt.) | 3 | EACH | 2,875.00 | 8,625.00 | 2,500.00 | 7,500.00 | 2,800.00 | 8,400.00 | 2,586.00 | 7,758.00 |
| 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 56 | EACH | 5.90 | 330.40 | 5.50 | 308.00 | 5.50 | 308.00 | 5.00 | 280.00 |
| 0050 | 732-01-04000 | Plastic Pavement Striping (4" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 4,220 | LNFT | 0.60 | 2,532.00 | 0.50 | 2,110.00 | 3.50 | 14,770.00 | 0.55 | 2,321.00 |
| 0051 | 732-01-04040 | Plastic Pavement Striping (8" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 375 | LNFT | 1.15 | 431.25 | 1.00 | 375.00 | 6.50 | 2,437.50 | 1.00 | 375.00 |
| 0052 | 732-01-04060 | Plastic Pavement Striping (12" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 2,030 | LNFT | 1.85 | 3,755.50 | 1.65 | 3,349.50 | 9.50 | 19,285.00 | 1.60 | 3,248.00 |
| 0053 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 559 | LNFT | 4.25 | 2,375.75 | 3.75 | 2,096.25 | 15.50 | 8,664.50 | 3.70 | 2,068.30 |
| 0054 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 224.30 | 448.60 | 200.00 | 400.00 | 220.00 | 440.00 | 200.00 | 400.00 |
| 0055 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 224.30 | 1,345.80 | 200.00 | 1,200.00 | 220.00 | 1,320.00 | 200.00 | 1,200.00 |
| 0056 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 230.00 | 1,840.00 | 210.00 | 1,680.00 | 240.00 | 1,920.00 | 200.00 | 1,600.00 |
| 0057 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 213.00 | 213.00 | 190.00 | 190.00 | 215.00 | 215.00 | 200.00 | 200.00 |
| 0058 | 736-01-00100 | Trenching and Backfilling | 340 | LNFT | 5.70 | 1,938.00 | 5.25 | 1,785.00 | 5.25 | 1,785.00 | 5.20 | 1,768.00 |
| 0059 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 60 | LNFT | 17.25 | 1,035.00 | 15.00 | 900.00 | 16.00 | 960.00 | 15.60 | 936.00 |
| 0060 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 320 | LNFT | 22.00 | 7,040.00 | 19.00 | 6,080.00 | 20.50 | 6,560.00 | 20.00 | 6,400.00 |
| 0061 | 736-04-02000 | Signal Support (Pedestal Pole) | 3 | EACH | 1,553.00 | 4,659.00 | 1,350.00 | 4,050.00 | 1,500.00 | 4,500.00 | 1,400.00 | 4,200.00 |
| 0062 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 2 | EACH | 9,550.00 | 19,100.00 | 8,300.00 | 16,600.00 | 9,000.00 | 18,000.00 | 8,600.00 | 17,200.00 |
| 0063 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 10,920.00 | 10,920.00 | 9,500.00 | 9,500.00 | 10,000.00 | 10,000.00 | 9,820.00 | 9,820.00 |
| 0064 | 736-04-05080 | Signal Support (Clamp on 25' Arm) | 2 | EACH | 2,275.00 | 4,550.00 | 2,000.00 | 4,000.00 | 2,000.00 | 4,000.00 | 2,050.00 | 4,100.00 |
| 0065 | 736-04-05100 | Signal Support (Clamp on 30' Arm) | 1 | EACH | 2,475.00 | 2,475.00 | 2,200.00 | 2,200.00 | 2,200.00 | 2,200.00 | 2,225.00 | 2,225.00 |
| 0066 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 19 | EACH | 905.00 | 17,195.00 | 800.00 | 15,200.00 | 800.00 | 15,200.00 | 814.00 | 15,466.00 |
| 0067 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,200.00 | 2,400.00 | 1,200.00 | 2,400.00 | 1,165.00 | 2,330.00 |
| 0068 | 736-06-00100 | Signal Service | 2 | EACH | 1,225.00 | 2,450.00 | 1,100.00 | 2,200.00 | 1,100.00 | 2,200.00 | 1,102.00 | 2,204.00 |
| 0069 | 736-07-00100 | Traffic Signal System | 1 | LUMP | 8,050.00 | 8,050.00 | 7,000.00 | 7,000.00 | 7,500.00 | 7,500.00 | 7,240.00 | 7,240.00 |
| 0070 | 736-08-01000 | Signal Controller (TS-2, Type 1; Type 6 Cabinet) | 1 | EACH | 21,250.00 | 21,250.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 19,150.00 | 19,150.00 |
| 0071 | 736-08-02000 | Signal Controller (TS-2, Type 2; Type 3 Cabinet) | 1 | EACH | 19,000.00 | 19,000.00 | 18,000.00 | 18,000.00 | 18,000.00 | 18,000.00 | 17,070.00 | 17,070.00 |
| 0072 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 460.00 | 460.00 | 400.00 | 400.00 | 425.00 | 425.00 | 415.00 | 415.00 |
| 0073 | 736-10-00300 | Underground Junction Box (Type F) | 6 | EACH | 495.00 | 2,970.00 | 450.00 | 2,700.00 | 450.00 | 2,700.00 | 445.00 | 2,670.00 |
| 0074 | 736-10-00700 | Underground Junction Box (Type J) | 1 | EACH | 1,265.00 | 1,265.00 | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 | 1,140.00 | 1,140.00 |
| 0075 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 225 | LNFT | 4.00 | 900.00 | 3.50 | 787.50 | 3.75 | 843.75 | 3.65 | 821.25 |
| 0076 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 55 | LNFT | 7.20 | 396.00 | 6.50 | 357.50 | 6.75 | 371.25 | 6.50 | 357.50 |
| 0077 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 340 | LNFT | 4.90 | 1,666.00 | 4.50 | 1,530.00 | 4.50 | 1,530.00 | 4.50 | 1,530.00 |
| 0078 | 736-12-05000 | Conductor (7c, #12 awg) | 4,410 | LNFT | 2.30 | 10,143.00 | 2.00 | 8,820.00 | 2.10 | 9,261.00 | 2.10 | 9,261.00 |
| 0079 | 739-01-00100 | Hydro-Seeding | 7 | ACRE | 1,610.00 | 11,270.00 | 1,500.00 | 10,500.00 | 1,550.00 | 10,850.00 | 1,055.00 | 7,385.00 |
| 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 110,000.00 | 110,000.00 | 100,000.00 | 100,000.00 | 600,000.00 | 600,000.00 | 260,000.00 | 260,000.00 |
| 0081 | 802-01-00100 | Structural Excavation | 34,482 | CUYD | 12.70 | 437,921.40 | 20.00 | 689,640.00 | 17.00 | 586,194.00 | 14.50 | 499,989.00 |
| 0082 | 802-05-00100 | Cofferdams | 1 | LUMP | 3,660,000.00 | 3,660,000.00 | 6,100,000.00 | 6,100,000.00 | 6,570,000.00 | 6,570,000.00 | 8,600,000.00 | 8,600,000.00 |
| 0083 | 803-03-00100 | Steel Sheet Pile Wall | 112,815 | SQFT | 24.55 | 2,769,608.25 | 28.00 | 3,158,820.00 | 25.40 | 2,865,501.00 | 30.50 | 3,440,857.50 |
| 0084 | 804-01-00200 | Precast Concrete Piles (14") | 17,400 | LNFT | 34.00 | 591,600.00 | 42.00 | 730,800.00 | 33.00 | 574,200.00 | 30.00 | 522,000.00 |
| 0085 | 804-01-00300 | Precast Concrete Piles (16") | 51,628 | LNFT | 41.00 | 2,116,748.00 | 46.00 | 2,374,888.00 | 37.00 | 1,910,236.00 | 34.55 | 1,783,747.40 |
| 0086 | 804-05-00200 | Precast Concrete Test Piles (14") | 1 | EACH | 66,000.00 | 66,000.00 | 40,000.00 | 40,000.00 | 8,200.00 | 8,200.00 | 30,000.00 | 30,000.00 |
| 0087 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 66,500.00 | 66,500.00 | 42,000.00 | 42,000.00 | 8,800.00 | 8,800.00 | 35,000.00 | 35,000.00 |
| 0088 | 804-09-00100 | Loading Test Piles | 2 | EACH | 17,000.00 | 34,000.00 | 10,000.00 | 20,000.00 | 25,100.00 | 50,200.00 | 25,000.00 | 50,000.00 |
| 0089 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 17,000.00 | 34,000.00 | 5,000.00 | 10,000.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 |
| 0090 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 33,400.00 | 66,800.00 | 2,500.00 | 5,000.00 | 750.00 | 1,500.00 | 2,500.00 | 5,000.00 |
| 0092 | 805-06-00100 | Class R Concrete | 1,336.45 | CUYD | 520.00 | 694,954.00 | 225.00 | 300,701.25 | 360.00 | 481,122.00 | 330.00 | 441,028.50 |
| 0093 | 806-01-00100 | Deformed Reinforcing Steel | 1,631,165 | LB | 0.60 | 978,699.00 | 0.70 | 1,141,815.50 | 0.80 | 1,304,932.00 | 0.65 | 1,060,257.25 |
| 0094 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 7,806 | INLF | 1.00 | 7,806.00 | 1.00 | 7,806.00 | 1.00 | 7,806.00 | 8.00 | 62,448.00 |
| 0095 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 72 | INLF | 1.25 | 90.00 | 5.00 | 360.00 | 3.00 | 216.00 | 12.00 | 864.00 |
| 0096 | NS-700-00040 | Adjusting Water Lines (6") | 150 | LNFT | 80.00 | 12,000.00 | 80.00 | 12,000.00 | 140.00 | 21,000.00 | 90.00 | 13,500.00 |
| 0097 | NS-736-00020 | Video Detector (MVP) Device | 6 | EACH | 6,900.00 | 41,400.00 | 6,000.00 | 36,000.00 | 6,000.00 | 36,000.00 | 6,180.00 | 37,080.00 |
| 0098 | NS-736-00040 | Video Detection (MVP) System | 2 | EACH | 4,400.00 | 8,800.00 | 3,800.00 | 7,600.00 | 4,000.00 | 8,000.00 | 3,915.00 | 7,830.00 |
| 0099 | NS-P36-00100 | Irrigation System | 1 | LUMP | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 |
| 0100 | NS-P36-00200 | Landscape Lighting System | 1 | LUMP | 24,000.00 | 24,000.00 | 25,000.00 | 25,000.00 | 21,000.00 | 21,000.00 | 21,000.00 | 21,000.00 |
| 0101 | NS-P36-00001 | Construction Dewatering | 1 | LUMP | 450,000.00 | 450,000.00 | 320,000.00 | 320,000.00 | 800,000.00 | 800,000.00 | 485,000.00 | 485,000.00 |
| 0102 | NS-P36-00002 | Temporary Dam Emergency Removal & Reconstruction | 18 | EACH | 14,000.00 | 252,000.00 | 10,000.00 | 180,000.00 | 17,000.00 | 306,000.00 | 12,000.00 | 216,000.00 |
| 0103 | NS-P36-00003 | Wellpoint System | 1 | LUMP | 250,000.00 | 250,000.00 | 780,000.00 | 780,000.00 | 7,500.00 | 7,500.00 | 0.01 | 0.01 |
| 0104 | 805-02-00100 | Class A(M) Concrete | 9,313.1 | CUYD | 360.00 | 3,352,716.00 | 400.00 | 3,725,240.00 | 400.00 | 3,725,240.00 | 350.00 | 3,259,585.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 20,160,138.41 | 23,299,396.90 | 24,460,867.70 | 25,388,187.25 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 3,500,000.00 | 3,725,000.00 | 3,875,000.00 | 3,650,000.00 | ||||||||
| TOTAL BID | 23,660,138.41 | 27,024,396.90 | 28,335,867.70 | 29,038,187.25 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - JB James Construction LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 320,000.00 | 320,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 3,339.3 | LNFT | 7.00 | 23,375.10 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 549 | SQYD | 7.00 | 3,843.00 |
| 0004 | 202-02-32180 | Removal of Pipe Headwalls | 20 | EACH | 5,000.00 | 100,000.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 186 | SQYD | 25.00 | 4,650.00 |
| 0006 | 202-02-38200 | Removal of Signs | 5 | EACH | 500.00 | 2,500.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,864.6 | SQYD | 5.00 | 29,323.00 |
| 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,000.00 | 3,000.00 |
| 0009 | 203-01-00100 | General Excavation | 3,622 | CUYD | 14.00 | 50,708.00 |
| 0010 | 203-02-00100 | Drainage Excavation | 14,059 | CUYD | 12.00 | 168,708.00 |
| 0011 | 203-03-00100 | Embankment | 1,587 | CUYD | 40.00 | 63,480.00 |
| 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 1,780 | CUYD | 50.00 | 89,000.00 |
| 0013 | 203-07-00100 | Borrow (Vehicular Measurement) | 457 | CUYD | 42.00 | 19,194.00 |
| 0014 | 203-08-00100 | Geotextile Fabric | 13,058 | SQYD | 2.00 | 26,116.00 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 4,807 | LNFT | 3.00 | 14,421.00 |
| 0016 | 302-01-00500 | Class II Base Course (Asphaltic Concrete Base on Embankment Layer) | 105.7 | CUYD | 230.00 | 24,311.00 |
| 0017 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 5,431.3 | SQYD | 25.00 | 135,782.50 |
| 0018 | 502-01-00100 | Superpave Asphaltic Concrete | 1,260.4 | TON | 135.00 | 170,154.00 |
| 0019 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 649.9 | TON | 135.00 | 87,736.50 |
| 0020 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 133 | LNFT | 90.00 | 11,970.00 |
| 0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 40 | LNFT | 150.00 | 6,000.00 |
| 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 60 | LNFT | 155.00 | 9,300.00 |
| 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 56 | LNFT | 160.00 | 8,960.00 |
| 0024 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 14 | LNFT | 300.00 | 4,200.00 |
| 0025 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 19 | LNFT | 100.00 | 1,900.00 |
| 0026 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 32 | LNFT | 130.00 | 4,160.00 |
| 0027 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 23 | LNFT | 250.00 | 5,750.00 |
| 0028 | 702-02-00100 | Manholes (MH-06) | 11 | EACH | 5,000.00 | 55,000.00 |
| 0029 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 4,500.00 | 4,500.00 |
| 0030 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,500.00 | 4,500.00 |
| 0031 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 6,500.00 | 6,500.00 |
| 0032 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 1,100.00 | 6,600.00 |
| 0033 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 6,000.00 | 6,000.00 |
| 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 767.9 | SQYD | 40.00 | 30,716.00 |
| 0035 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 180.4 | SQYD | 41.00 | 7,396.40 |
| 0036 | 706-04-00100 | Handicapped Curb Ramps | 46 | EACH | 800.00 | 36,800.00 |
| 0037 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,308 | LNFT | 27.00 | 89,316.00 |
| 0038 | 712-02-00100 | Sacked Concrete Revetment | 891 | SQYD | 50.00 | 44,550.00 |
| 0039 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 |
| 0040 | 718-01-00100 | Fertilizer | 7,000 | LB | 0.40 | 2,800.00 |
| 0041 | 719-01-02100 | Plants (Tree) (Container) (3 1/2" diameter) Tuscarora Crape Myrtle | 12 | EACH | 500.00 | 6,000.00 |
| 0042 | 719-01-06060 | Plants (Plant) (Container) (3 gallon) Indian Hawthorn | 124 | EACH | 40.00 | 4,960.00 |
| 0043 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 30,000.00 | 30,000.00 |
| 0044 | 723-01-00100 | Granular Material (Net Section) | 3,989 | CUYD | 53.00 | 211,417.00 |
| 0045 | 726-01-00100 | Bedding Material | 51.2 | CUYD | 95.00 | 4,864.00 |
| 0046 | 727-01-00100 | Mobilization | 1 | LUMP | 2,600,000.00 | 2,600,000.00 |
| 0047 | 729-01-00100 | Sign (Type A) | 65 | SQFT | 50.00 | 3,250.00 |
| 0048 | 730-15-01000 | Relocate Light Poles (Sta. 106+94.63, 98.74' Rt.; Sta. 107+23.66, 98.48' Rt.; and Sta. 107+23.90, 40.76' Lt.) | 3 | EACH | 2,700.00 | 8,100.00 |
| 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 56 | EACH | 6.00 | 336.00 |
| 0050 | 732-01-04000 | Plastic Pavement Striping (4" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 4,220 | LNFT | 3.30 | 13,926.00 |
| 0051 | 732-01-04040 | Plastic Pavement Striping (8" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 375 | LNFT | 6.00 | 2,250.00 |
| 0052 | 732-01-04060 | Plastic Pavement Striping (12" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 2,030 | LNFT | 9.50 | 19,285.00 |
| 0053 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 559 | LNFT | 15.00 | 8,385.00 |
| 0054 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 250.00 | 500.00 |
| 0055 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 250.00 | 1,500.00 |
| 0056 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 250.00 | 2,000.00 |
| 0057 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 250.00 | 250.00 |
| 0058 | 736-01-00100 | Trenching and Backfilling | 340 | LNFT | 6.00 | 2,040.00 |
| 0059 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 60 | LNFT | 15.00 | 900.00 |
| 0060 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 320 | LNFT | 20.00 | 6,400.00 |
| 0061 | 736-04-02000 | Signal Support (Pedestal Pole) | 3 | EACH | 1,500.00 | 4,500.00 |
| 0062 | 736-04-04120 | Signal Support (35' Single Mast Arm) | 2 | EACH | 8,500.00 | 17,000.00 |
| 0063 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 10,000.00 | 10,000.00 |
| 0064 | 736-04-05080 | Signal Support (Clamp on 25' Arm) | 2 | EACH | 2,000.00 | 4,000.00 |
| 0065 | 736-04-05100 | Signal Support (Clamp on 30' Arm) | 1 | EACH | 2,200.00 | 2,200.00 |
| 0066 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 19 | EACH | 800.00 | 15,200.00 |
| 0067 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 1,200.00 | 2,400.00 |
| 0068 | 736-06-00100 | Signal Service | 2 | EACH | 1,100.00 | 2,200.00 |
| 0069 | 736-07-00100 | Traffic Signal System | 1 | LUMP | 7,800.00 | 7,800.00 |
| 0070 | 736-08-01000 | Signal Controller (TS-2, Type 1; Type 6 Cabinet) | 1 | EACH | 19,000.00 | 19,000.00 |
| 0071 | 736-08-02000 | Signal Controller (TS-2, Type 2; Type 3 Cabinet) | 1 | EACH | 17,000.00 | 17,000.00 |
| 0072 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 400.00 | 400.00 |
| 0073 | 736-10-00300 | Underground Junction Box (Type F) | 6 | EACH | 450.00 | 2,700.00 |
| 0074 | 736-10-00700 | Underground Junction Box (Type J) | 1 | EACH | 1,300.00 | 1,300.00 |
| 0075 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 225 | LNFT | 4.00 | 900.00 |
| 0076 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 55 | LNFT | 7.00 | 385.00 |
| 0077 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 340 | LNFT | 5.00 | 1,700.00 |
| 0078 | 736-12-05000 | Conductor (7c, #12 awg) | 4,410 | LNFT | 2.50 | 11,025.00 |
| 0079 | 739-01-00100 | Hydro-Seeding | 7 | ACRE | 1,500.00 | 10,500.00 |
| 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0081 | 802-01-00100 | Structural Excavation | 34,482 | CUYD | 31.00 | 1,068,942.00 |
| 0082 | 802-05-00100 | Cofferdams | 1 | LUMP | 6,700,000.00 | 6,700,000.00 |
| 0083 | 803-03-00100 | Steel Sheet Pile Wall | 112,815 | SQFT | 28.00 | 3,158,820.00 |
| 0084 | 804-01-00200 | Precast Concrete Piles (14") | 17,400 | LNFT | 32.00 | 556,800.00 |
| 0085 | 804-01-00300 | Precast Concrete Piles (16") | 51,628 | LNFT | 36.00 | 1,858,608.00 |
| 0086 | 804-05-00200 | Precast Concrete Test Piles (14") | 1 | EACH | 35,000.00 | 35,000.00 |
| 0087 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 35,000.00 | 35,000.00 |
| 0088 | 804-09-00100 | Loading Test Piles | 2 | EACH | 1,000.00 | 2,000.00 |
| 0089 | 804-10-00100 | Reloading Test Piles | 2 | EACH | 500.00 | 1,000.00 |
| 0090 | 804-11-00100 | Redriving Test Piles | 2 | EACH | 500.00 | 1,000.00 |
| 0092 | 805-06-00100 | Class R Concrete | 1,336.45 | CUYD | 300.00 | 400,935.00 |
| 0093 | 806-01-00100 | Deformed Reinforcing Steel | 1,631,165 | LB | 0.75 | 1,223,373.75 |
| 0094 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 7,806 | INLF | 1.00 | 7,806.00 |
| 0095 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 72 | INLF | 2.00 | 144.00 |
| 0096 | NS-700-00040 | Adjusting Water Lines (6") | 150 | LNFT | 70.00 | 10,500.00 |
| 0097 | NS-736-00020 | Video Detector (MVP) Device | 6 | EACH | 6,500.00 | 39,000.00 |
| 0098 | NS-736-00040 | Video Detection (MVP) System | 2 | EACH | 4,000.00 | 8,000.00 |
| 0099 | NS-P36-00100 | Irrigation System | 1 | LUMP | 2,500.00 | 2,500.00 |
| 0100 | NS-P36-00200 | Landscape Lighting System | 1 | LUMP | 22,000.00 | 22,000.00 |
| 0101 | NS-P36-00001 | Construction Dewatering | 1 | LUMP | 825,000.00 | 825,000.00 |
| 0102 | NS-P36-00002 | Temporary Dam Emergency Removal & Reconstruction | 18 | EACH | 10,000.00 | 180,000.00 |
| 0103 | NS-P36-00003 | Wellpoint System | 1 | LUMP | 775,000.00 | 775,000.00 |
| 0104 | 805-02-00100 | Class A(M) Concrete | 9,313.1 | CUYD | 467.00 | 4,349,217.70 |
| ITEM TOTAL (CONSTRUCTION BID) | 26,250,439.95 | |||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 3,650,000.00 | |||||
| TOTAL BID | 29,900,439.95 | |||||