Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 385-04-0005 | |
| Parish: Acadia, Vermilion | |
| Routes: LA 92 | |
| Description: BAYOU QUEUE DE TORTUE ON LA 92 | |
| Type Const: CLEARING AND GRUBBING, GRADING, REMOVAL OF TIMBER TRESTLE BRIDGE, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK | |
| Estimated Construction Cost: $1,203,761.27 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 09090 | Guinn Brothers, LLC. | $1,165,241.30 |
| 2 | 39462 | Jb James Construction Llc | $1,257,760.15 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $1,259,336.56 |
| 4 | 01012 | Cecil D. Gassiott, LLC | $1,330,000.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Guinn Brothers, LLC. |
- 2 - Jb James Construction Llc |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Cecil D. Gassiott, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 80,000.00 | 80,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 10,000.00 | 10,000.00 | 6,400.00 | 6,400.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 110+99.14; 116' x 25' Timber Trestle Bridge | 1 | EACH | 17,000.00 | 17,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,980.7 | SQYD | 3.00 | 5,942.10 | 3.50 | 6,932.45 | 5.15 | 10,200.61 | 10.00 | 19,807.00 |
| 0005 | 203-01-00100 | General Excavation | 568 | CUYD | 4.00 | 2,272.00 | 15.00 | 8,520.00 | 13.00 | 7,384.00 | 20.00 | 11,360.00 |
| 0006 | 203-02-00100 | Drainage Excavation | 1,180 | CUYD | 4.00 | 4,720.00 | 12.00 | 14,160.00 | 22.00 | 25,960.00 | 15.00 | 17,700.00 |
| 0007 | 203-03-00100 | Embankment | 1,364 | CUYD | 12.00 | 16,368.00 | 30.00 | 40,920.00 | 27.00 | 36,828.00 | 20.00 | 27,280.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 100.00 | 400.00 | 150.00 | 600.00 | 500.00 | 2,000.00 | 200.00 | 800.00 |
| 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 500.00 | 2,000.00 | 600.00 | 2,400.00 | 500.00 | 2,000.00 | 1,000.00 | 4,000.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 1,990 | LNFT | 1.50 | 2,985.00 | 1.75 | 3,482.50 | 1.80 | 3,582.00 | 2.00 | 3,980.00 |
| 0011 | 302-02-03000 | Class II Base Course (8" Thick) | 1,845.4 | SQYD | 19.00 | 35,062.60 | 22.00 | 40,598.80 | 21.00 | 38,753.40 | 24.50 | 45,212.30 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 26.8 | TON | 250.00 | 6,700.00 | 400.00 | 10,720.00 | 460.00 | 12,328.00 | 200.00 | 5,360.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 104.3 | CUYD | 85.00 | 8,865.50 | 80.00 | 8,344.00 | 108.00 | 11,264.40 | 95.00 | 9,908.50 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 60 | CUYD | 50.00 | 3,000.00 | 85.00 | 5,100.00 | 100.00 | 6,000.00 | 110.00 | 6,600.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 356.9 | TON | 170.00 | 60,673.00 | 180.00 | 64,242.00 | 150.00 | 53,535.00 | 185.00 | 66,026.50 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 91.6 | TON | 200.00 | 18,320.00 | 200.00 | 18,320.00 | 220.00 | 20,152.00 | 200.00 | 18,320.00 |
| 0017 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 164 | LNFT | 35.00 | 5,740.00 | 54.00 | 8,856.00 | 55.00 | 9,020.00 | 75.00 | 12,300.00 |
| 0018 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 44 | LNFT | 165.00 | 7,260.00 | 84.00 | 3,696.00 | 100.00 | 4,400.00 | 140.00 | 6,160.00 |
| 0019 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,000.00 | 8,000.00 | 2,500.00 | 5,000.00 | 3,700.00 | 7,400.00 | 3,500.00 | 7,000.00 |
| 0020 | 702-08-00100 | Side Drain Safety End (Type I) | 4 | EACH | 1,350.00 | 5,400.00 | 1,100.00 | 4,400.00 | 1,500.00 | 6,000.00 | 1,900.00 | 7,600.00 |
| 0021 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 4,000.00 | 8,000.00 | 3,200.00 | 6,400.00 | 3,900.00 | 7,800.00 | 4,400.00 | 8,800.00 |
| 0022 | 704-03-00100 | Blocked Out Guard Rail | 162.5 | LNFT | 27.00 | 4,387.50 | 24.00 | 3,900.00 | 25.00 | 4,062.50 | 26.00 | 4,225.00 |
| 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 58.00 | 5,800.00 | 40.00 | 4,000.00 | 45.00 | 4,500.00 | 60.00 | 6,000.00 |
| 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,700.00 | 5,400.00 | 2,400.00 | 4,800.00 | 2,600.00 | 5,200.00 | 2,600.00 | 5,200.00 |
| 0025 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 3,100.00 | 6,200.00 | 2,500.00 | 5,000.00 | 2,800.00 | 5,600.00 | 3,300.00 | 6,600.00 |
| 0026 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 408 | LNFT | 8.00 | 3,264.00 | 10.00 | 4,080.00 | 9.00 | 3,672.00 | 11.00 | 4,488.00 |
| 0027 | 705-05-00100 | Double Swinging Driveway Gates 40'-0" | 1 | DBGT | 2,500.00 | 2,500.00 | 600.00 | 600.00 | 3,400.00 | 3,400.00 | 500.00 | 500.00 |
| 0028 | 708-01-00100 | Right-of-Way Monument | 12 | EACH | 225.00 | 2,700.00 | 200.00 | 2,400.00 | 255.00 | 3,060.00 | 500.00 | 6,000.00 |
| 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 12 | EACH | 225.00 | 2,700.00 | 200.00 | 2,400.00 | 255.00 | 3,060.00 | 250.00 | 3,000.00 |
| 0030 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 1,326 | SQYD | 65.00 | 86,190.00 | 54.00 | 71,604.00 | 53.00 | 70,278.00 | 56.00 | 74,256.00 |
| 0031 | 711-04-00100 | Geotextile Fabric | 1,326 | SQYD | 4.00 | 5,304.00 | 2.50 | 3,315.00 | 2.85 | 3,779.10 | 3.00 | 3,978.00 |
| 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 30,000.00 | 30,000.00 | 55,000.00 | 55,000.00 | 12,500.00 | 12,500.00 |
| 0033 | 726-01-00100 | Bedding Material | 2.4 | CUYD | 250.00 | 600.00 | 130.00 | 312.00 | 300.00 | 720.00 | 250.00 | 600.00 |
| 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 125,000.00 | 125,000.00 | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 |
| 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 70.00 | 280.00 | 70.00 | 280.00 | 80.00 | 320.00 |
| 0036 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 64 | EACH | 35.00 | 2,240.00 | 30.00 | 1,920.00 | 11.00 | 704.00 | 25.00 | 1,600.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 21 | EACH | 25.00 | 525.00 | 20.00 | 420.00 | 5.95 | 124.95 | 20.00 | 420.00 |
| 0038 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 3,236 | LNFT | 1.00 | 3,236.00 | 0.75 | 2,427.00 | 0.65 | 2,103.40 | 0.65 | 2,103.40 |
| 0039 | 735-01-00100 | Mailboxes | 3 | EACH | 50.00 | 150.00 | 1.00 | 3.00 | 10.00 | 30.00 | 35.00 | 105.00 |
| 0040 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 100.00 | 300.00 | 250.00 | 750.00 | 150.00 | 450.00 | 150.00 | 450.00 |
| 0041 | 739-01-00100 | Hydro-Seeding | 2.04 | ACRE | 1,700.00 | 3,468.00 | 1,300.00 | 2,652.00 | 1,300.00 | 2,652.00 | 1,600.00 | 3,264.00 |
| 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 8,500.00 | 8,500.00 |
| 0043 | 804-01-00600 | Precast Concrete Piles (24") | 2,000 | LNFT | 120.00 | 240,000.00 | 105.00 | 210,000.00 | 93.00 | 186,000.00 | 110.00 | 220,000.00 |
| 0044 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 100.00 | 100.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 |
| 0045 | 805-01-00700 | Class A Concrete (Bents) | 57.22 | CUYD | 950.00 | 54,359.00 | 1,050.00 | 60,081.00 | 1,200.00 | 68,664.00 | 1,350.00 | 77,247.00 |
| 0046 | 805-04-00100 | Class AA(M) Concrete | 128.28 | CUYD | 850.00 | 109,038.00 | 780.00 | 100,058.40 | 1,000.00 | 128,280.00 | 1,225.00 | 157,143.00 |
| 0047 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 948 | LNFT | 80.00 | 75,840.00 | 85.00 | 80,580.00 | 60.00 | 56,880.00 | 65.00 | 61,620.00 |
| 0048 | 805-11-00100 | Strip Seal Joints | 60 | LNFT | 200.00 | 12,000.00 | 200.00 | 12,000.00 | 185.00 | 11,100.00 | 210.00 | 12,600.00 |
| 0049 | 806-01-00100 | Deformed Reinforcing Steel | 52,974 | LB | 1.00 | 52,974.00 | 1.00 | 52,974.00 | 0.80 | 42,379.20 | 0.90 | 47,676.60 |
| 0050 | 807-08-00100 | Structural Metalwork | 1 | LUMP | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 16,000.00 | 16,000.00 | 13,500.00 | 13,500.00 |
| 0051 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 320 | LNFT | 85.00 | 27,200.00 | 65.00 | 20,800.00 | 78.00 | 24,960.00 | 75.00 | 24,000.00 |
| 0052 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 235.00 | 64,756.60 | 200.00 | 55,112.00 | 250.00 | 68,890.00 | 250.00 | 68,890.00 |
| 0053 | NS-804-00001 | Vibration Monitoring | 5 | EACH | 1,000.00 | 5,000.00 | 500.00 | 2,500.00 | 1,300.00 | 6,500.00 | 500.00 | 2,500.00 |
| CONTRACTOR TOTAL | 1,165,241.30 | 1,257,760.15 | 1,259,336.56 | 1,330,000.30 | ||||||||