Bid Tabulations
Letting of
06/09/2010
LA DOTD Headquarters
| Lead Project: 382-04-0054 | |
| Parish: Calcasieu | |
| Routes: | |
| Description: BLACK BAYOU - DUKE ROAD | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK | |
| Estimated Construction Cost: $1,402,203.46 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $1,349,386.96 |
| 2 | 14096 | Bessette Development Corp. | $1,570,002.00 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $1,625,175.20 |
| 4 | 36384 | John Bailey, Inc. | $1,710,714.55 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - Bessette Development Corp. |
- 3 - Gilchrist Construction Co. LLC |
- 4 - John Bailey, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,600.00 | 2,600.00 | 812.00 | 812.00 | 300.00 | 300.00 | 2,000.00 | 2,000.00 |
| 0002 | 202-02-06040 | Removal of Concrete Box Headwall HEADWALL & FLARED WINGWALLS STATION 225+43 | 1 | EACH | 3,000.00 | 3,000.00 | 1,082.25 | 1,082.25 | 600.00 | 600.00 | 2,500.00 | 2,500.00 |
| 0003 | 202-02-14500 | Removal of Guard Rail | 300 | LNFT | 15.00 | 4,500.00 | 4.35 | 1,305.00 | 10.00 | 3,000.00 | 10.00 | 3,000.00 |
| 0004 | 203-01-00100 | General Excavation | 56 | CUYD | 15.00 | 840.00 | 10.85 | 607.60 | 15.00 | 840.00 | 20.00 | 1,120.00 |
| 0005 | 203-03-00100 | Embankment | 131 | CUYD | 18.00 | 2,358.00 | 21.65 | 2,836.15 | 25.00 | 3,275.00 | 30.00 | 3,930.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 225.00 | 2,250.00 | 39.25 | 392.50 | 20.00 | 200.00 | 40.00 | 400.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 20.00 | 2,000.00 | 8.95 | 895.00 | 2.00 | 200.00 | 5.00 | 500.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,362 | CUYD | 34.00 | 46,308.00 | 65.15 | 88,734.30 | 60.00 | 81,720.00 | 100.00 | 136,200.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 10,453.4 | TON | 81.50 | 851,952.10 | 92.50 | 966,939.50 | 94.00 | 982,619.60 | 94.00 | 982,619.60 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 553.9 | TON | 131.00 | 72,560.90 | 120.75 | 66,883.43 | 150.00 | 83,085.00 | 100.00 | 55,390.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 77,763 | SQYD | 2.00 | 155,526.00 | 2.15 | 167,190.45 | 2.00 | 155,526.00 | 2.00 | 155,526.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,374 | CUYD | 0.01 | -13.74 | 1.65 | -2,267.10 | 1.00 | -1,374.00 | 0.01 | -13.74 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 100.00 | 25,000.00 | 79.50 | 19,875.00 | 115.00 | 28,750.00 | 95.00 | 23,750.00 |
| 0014 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 16 | LNFT | 65.00 | 1,040.00 | 97.50 | 1,560.00 | 110.00 | 1,760.00 | 110.00 | 1,760.00 |
| 0015 | 701-08-00100 | Relaying Pipe | 8 | LNFT | 125.00 | 1,000.00 | 97.50 | 780.00 | 110.00 | 880.00 | 125.00 | 1,000.00 |
| 0016 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 5 | LNFT | 100.00 | 500.00 | 97.50 | 487.50 | 110.00 | 550.00 | 125.00 | 625.00 |
| 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 600.00 | 600.00 | 818.50 | 818.50 | 600.00 | 600.00 | 1,000.00 | 1,000.00 |
| 0018 | 702-08-00100 | Side Drain Safety End (Type I) | 1 | EACH | 2,000.00 | 2,000.00 | 1,785.50 | 1,785.50 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 56.3 | LNFT | 25.00 | 1,407.50 | 21.70 | 1,221.71 | 24.00 | 1,351.20 | 26.50 | 1,491.95 |
| 0020 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 45.00 | 2,250.00 | 38.00 | 1,900.00 | 42.00 | 2,100.00 | 50.00 | 2,500.00 |
| 0021 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 59.50 | 5,950.00 | 85.00 | 8,500.00 | 85.00 | 8,500.00 |
| 0022 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,500.00 | 5,000.00 | 2,164.50 | 4,329.00 | 2,400.00 | 4,800.00 | 2,500.00 | 5,000.00 |
| 0023 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,500.00 | 10,000.00 | 2,381.00 | 9,524.00 | 2,600.00 | 10,400.00 | 2,750.00 | 11,000.00 |
| 0024 | 712-03-00100 | Stone Revetment | 120 | SQYD | 70.00 | 8,400.00 | 75.75 | 9,090.00 | 80.00 | 9,600.00 | 100.00 | 12,000.00 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,000.00 | 27,000.00 | 4,572.00 | 4,572.00 | 6,200.00 | 6,200.00 | 75,000.00 | 75,000.00 |
| 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 524 | LNFT | 0.01 | 5.24 | 0.25 | 131.00 | 0.25 | 131.00 | 0.72 | 377.28 |
| 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 0.01 | 0.96 | 0.90 | 86.40 | 0.90 | 86.40 | 2.50 | 240.00 |
| 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.54 | MILE | 400.00 | 3,816.00 | 541.15 | 5,162.57 | 250.00 | 2,385.00 | 600.00 | 5,724.00 |
| 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.238 | MILE | 0.01 | 0.05 | 514.05 | 2,692.59 | 550.00 | 2,880.90 | 600.00 | 3,142.80 |
| 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 24.74 | MILE | 0.01 | 0.25 | 595.25 | 14,726.49 | 200.00 | 4,948.00 | 864.00 | 21,375.36 |
| 0031 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 60.00 | 240.00 | 86.50 | 346.00 | 100.00 | 400.00 | 120.00 | 480.00 |
| 0032 | 726-01-00100 | Bedding Material | 21.7 | CUYD | 90.00 | 1,953.00 | 108.25 | 2,349.03 | 110.00 | 2,387.00 | 100.00 | 2,170.00 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 27,000.00 | 27,000.00 | 85,181.25 | 85,181.25 | 120,000.00 | 120,000.00 | 75,000.00 | 75,000.00 |
| 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 75.75 | 606.00 | 90.00 | 720.00 | 125.00 | 1,000.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 630 | EACH | 5.00 | 3,150.00 | 5.70 | 3,591.00 | 6.00 | 3,780.00 | 6.00 | 3,780.00 |
| 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 262 | LNFT | 2.00 | 524.00 | 1.50 | 393.00 | 1.50 | 393.00 | 1.20 | 314.40 |
| 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 48 | LNFT | 3.00 | 144.00 | 5.00 | 240.00 | 5.20 | 249.60 | 3.72 | 178.56 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.37 | MILE | 2,600.00 | 32,162.00 | 2,705.50 | 33,467.04 | 2,900.00 | 35,873.00 | 2,880.00 | 35,625.60 |
| 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.619 | MILE | 800.00 | 2,095.20 | 920.00 | 2,409.48 | 1,000.00 | 2,619.00 | 960.00 | 2,514.24 |
| 0040 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 500.00 | 1,000.00 | 433.00 | 866.00 | 450.00 | 900.00 | 540.00 | 1,080.00 |
| 0041 | 735-01-00100 | Mailboxes | 35 | EACH | 2.00 | 70.00 | 1.20 | 42.00 | 10.00 | 350.00 | 25.00 | 875.00 |
| 0042 | 735-02-00100 | Mailbox Supports (Single) | 35 | EACH | 150.00 | 5,250.00 | 131.50 | 4,602.50 | 140.00 | 4,900.00 | 175.00 | 6,125.00 |
| 0043 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 6,000.00 | 3,000.00 | 2,881.00 | 1,440.50 | 2,400.00 | 1,200.00 | 4,000.00 | 2,000.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 3,247.00 | 3,247.00 | 4,800.00 | 4,800.00 | 5,000.00 | 5,000.00 |
| 0045 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 6.23 | CUYD | 1,000.00 | 6,230.00 | 1,263.75 | 7,873.16 | 1,250.00 | 7,787.50 | 1,500.00 | 9,345.00 |
| 0046 | 805-12-35000 | Reinforced Concrete Box Culverts (6' x 6') (Extension) | 38 | LNFT | 600.00 | 22,800.00 | 811.65 | 30,842.70 | 750.00 | 28,500.00 | 900.00 | 34,200.00 |
| 0047 | 806-01-00100 | Deformed Reinforcing Steel | 4,134 | LB | 1.25 | 5,167.50 | 3.00 | 12,402.00 | 3.00 | 12,402.00 | 2.75 | 11,368.50 |
| CONTRACTOR TOTAL | 1,349,386.96 | 1,570,002.00 | 1,625,175.20 | 1,710,714.55 | ||||||||