Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 374-03-0022 | |
| Parish: Avoyelles | |
| Routes: LA 451 | |
| Description: POMME DE TERRE RESERVE - JCT. LA 1 | |
| Type Const: Pavement patching, CP, Superpave overlay | |
| Estimated Construction Cost: $1,339,739.60 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,490,135.60 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,524,840.41 |
| 3 | 05789 | D & J Construction Co., Inc. | $1,604,574.14 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - D & J Construction Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,400.00 | 1,400.00 | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 137 | LNFT | 15.00 | 2,055.00 | 15.00 | 2,055.00 | 12.00 | 1,644.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 15 | CUYD | 100.00 | 1,500.00 | 60.00 | 900.00 | 60.00 | 900.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,922 | CUYD | 70.00 | 274,540.00 | 75.00 | 294,150.00 | 40.00 | 156,880.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 10,560.1 | TON | 75.00 | 792,007.50 | 78.50 | 828,967.85 | 95.00 | 1,003,209.50 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 654.8 | TON | 122.00 | 79,885.60 | 140.00 | 91,672.00 | 135.00 | 88,398.00 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 658 | SQYD | 9.00 | 5,922.00 | 9.00 | 5,922.00 | 14.00 | 9,212.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -25 | CUYD | 1.00 | -25.00 | 10.00 | -250.00 | 0.10 | -2.50 |
| 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 2,100 | SQYD | 50.00 | 105,000.00 | 48.00 | 100,800.00 | 62.00 | 130,200.00 |
| 0010 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 216 | LNFT | 75.00 | 16,200.00 | 150.00 | 32,400.00 | 75.00 | 16,200.00 |
| 0011 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 25 | LNFT | 38.00 | 950.00 | 38.00 | 950.00 | 42.00 | 1,050.00 |
| 0012 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 23.00 | 1,150.00 | 23.00 | 1,150.00 | 25.00 | 1,250.00 |
| 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,400.00 | 4,800.00 | 2,400.00 | 4,800.00 | 2,500.00 | 5,000.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,000.00 | 4,000.00 | 3,800.00 | 3,800.00 | 20,000.00 | 20,000.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.883 | MILE | 150.00 | 1,182.45 | 200.00 | 1,576.60 | 250.00 | 1,970.75 |
| 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.066 | MILE | 325.00 | 1,971.45 | 1.00 | 6.07 | 200.00 | 1,213.20 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.787 | MILE | 700.00 | 4,050.90 | 1.00 | 5.79 | 1.00 | 5.79 |
| 0018 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 200.00 | 400.00 | 100.00 | 200.00 | 250.00 | 500.00 |
| 0019 | 716-01-00100 | Mulch (Vegetative) | 9 | TON | 425.00 | 3,825.00 | 405.00 | 3,645.00 | 400.00 | 3,600.00 |
| 0020 | 717-01-00100 | Seeding | 135 | LB | 6.00 | 810.00 | 6.50 | 877.50 | 6.00 | 810.00 |
| 0021 | 718-01-00100 | Fertilizer | 4,500 | LB | 0.52 | 2,340.00 | 0.40 | 1,800.00 | 0.45 | 2,025.00 |
| 0022 | 726-01-00100 | Bedding Material | 50.5 | CUYD | 100.00 | 5,050.00 | 88.00 | 4,444.00 | 100.00 | 5,050.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 91,000.00 | 91,000.00 | 70,000.00 | 70,000.00 | 60,000.00 | 60,000.00 |
| 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 14 | EACH | 75.00 | 1,050.00 | 80.00 | 1,120.00 | 100.00 | 1,400.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,041 | EACH | 5.00 | 5,205.00 | 5.50 | 5,725.50 | 6.00 | 6,246.00 |
| 0026 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 3.25 | 130.00 | 4.00 | 160.00 | 5.00 | 200.00 |
| 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.787 | MILE | 2,600.00 | 15,046.20 | 2,800.00 | 16,203.60 | 2,200.00 | 12,731.40 |
| 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.066 | MILE | 750.00 | 4,549.50 | 750.00 | 4,549.50 | 1,000.00 | 6,066.00 |
| 0029 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 425.00 | 850.00 | 440.00 | 880.00 | 750.00 | 1,500.00 |
| 0030 | 735-01-00100 | Mailboxes | 20 | EACH | 1.00 | 20.00 | 10.00 | 200.00 | 5.00 | 100.00 |
| 0031 | 735-02-00100 | Mailbox Supports (Single) | 20 | EACH | 125.00 | 2,500.00 | 130.00 | 2,600.00 | 125.00 | 2,500.00 |
| 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0033 | NS-200-00020 | Cleaning Existing Ditches | 120 | LNFT | 7.25 | 870.00 | 9.00 | 1,080.00 | 7.00 | 840.00 |
| 0034 | NS-500-00280 | Surface Preparation | 1 | LUMP | 47,000.00 | 47,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 |
| 0035 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 49,500 | INLF | 0.20 | 9,900.00 | 0.10 | 4,950.00 | 0.25 | 12,375.00 |
| CONTRACTOR TOTAL | 1,490,135.60 | 1,524,840.41 | 1,604,574.14 | |||||||