Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 315-01-0010 | |
| Parish: Ouachita | |
| Routes: LA 143 | |
| Description: Overlays in West Monroe, 7th Street | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK. | |
| Estimated Construction Cost: $2,441,932.10 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $1,921,268.70 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,006,610.99 |
| 3 | 15099 | Amethyst Construction, Inc. | $2,629,821.55 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $2,871,941.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Amethyst Construction, Inc. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,800.00 | 1,800.00 | 3,400.00 | 3,400.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 77 | SQYD | 5.00 | 385.00 | 15.00 | 1,155.00 | 12.00 | 924.00 | 20.00 | 1,540.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 380 | LNFT | 6.00 | 2,280.00 | 13.00 | 4,940.00 | 6.00 | 2,280.00 | 15.00 | 5,700.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 220 | LNFT | 14.00 | 3,080.00 | 19.00 | 4,180.00 | 5.00 | 1,100.00 | 13.00 | 2,860.00 |
| 0005 | 202-02-26300 | Removal of Median / Island | 100 | SQYD | 5.00 | 500.00 | 40.00 | 4,000.00 | 8.00 | 800.00 | 20.00 | 2,000.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 586 | CUYD | 33.00 | 19,338.00 | 89.00 | 52,154.00 | 16.00 | 9,376.00 | 30.00 | 17,580.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 12,358 | TON | 93.00 | 1,149,294.00 | 91.00 | 1,124,578.00 | 92.00 | 1,136,936.00 | 115.00 | 1,421,170.00 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 207 | TON | 184.00 | 38,088.00 | 197.00 | 40,779.00 | 102.00 | 21,114.00 | 200.00 | 41,400.00 |
| 0009 | 509-01-00100 | Cold Planing Asphaltic Pavement | 77,225 | SQYD | 1.50 | 115,837.50 | 1.90 | 146,727.50 | 7.20 | 556,020.00 | 4.00 | 308,900.00 |
| 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 312 | SQYD | 125.00 | 39,000.00 | 120.00 | 37,440.00 | 92.00 | 28,704.00 | 130.00 | 40,560.00 |
| 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 11,555 | LNFT | 2.00 | 23,110.00 | 2.00 | 23,110.00 | 3.00 | 34,665.00 | 5.00 | 57,775.00 |
| 0012 | 702-04-00100 | Adjusting Manholes | 46 | EACH | 1,200.00 | 55,200.00 | 2,000.00 | 92,000.00 | 2,800.00 | 128,800.00 | 1,000.00 | 46,000.00 |
| 0013 | 702-04-00200 | Adjusting Catch Basins | 25 | EACH | 2,200.00 | 55,000.00 | 2,400.00 | 60,000.00 | 3,400.00 | 85,000.00 | 1,900.00 | 47,500.00 |
| 0015 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 22.00 | 1,100.00 | 24.00 | 1,200.00 | 22.00 | 1,100.00 | 50.00 | 2,500.00 |
| 0016 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 56.00 | 5,600.00 | 62.00 | 6,200.00 | 20.00 | 2,000.00 | 70.00 | 7,000.00 |
| 0017 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 | 2,600.00 | 10,400.00 |
| 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 59 | SQYD | 45.00 | 2,655.00 | 62.00 | 3,658.00 | 65.00 | 3,835.00 | 84.00 | 4,956.00 |
| 0019 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 110 | SQYD | 45.00 | 4,950.00 | 56.00 | 6,160.00 | 65.00 | 7,150.00 | 84.00 | 9,240.00 |
| 0020 | 706-04-00100 | Handicapped Curb Ramps | 71 | EACH | 600.00 | 42,600.00 | 1,200.00 | 85,200.00 | 3,200.00 | 227,200.00 | 2,500.00 | 177,500.00 |
| 0021 | 707-01-00100 | Concrete Curb | 380 | LNFT | 10.00 | 3,800.00 | 11.00 | 4,180.00 | 9.00 | 3,420.00 | 30.00 | 11,400.00 |
| 0022 | 707-01-00300 | Concrete Curb (Mountable) | 220 | LNFT | 10.00 | 2,200.00 | 24.00 | 5,280.00 | 9.00 | 1,980.00 | 40.00 | 8,800.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 63,000.00 | 63,000.00 | 20,000.00 | 20,000.00 | 65,000.00 | 65,000.00 | 115,000.00 | 115,000.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 332 | LNFT | 2.00 | 664.00 | 1.00 | 332.00 | 2.00 | 664.00 | 1.40 | 464.80 |
| 0025 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 4.973 | MILE | 1,000.00 | 4,973.00 | 350.00 | 1,740.55 | 1,200.00 | 5,967.60 | 600.00 | 2,983.80 |
| 0026 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 9.246 | MILE | 3,500.00 | 32,361.00 | 350.00 | 3,236.10 | 2,000.00 | 18,492.00 | 8,600.00 | 79,515.60 |
| 0027 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 11 | EACH | 50.00 | 550.00 | 50.00 | 550.00 | 150.00 | 1,650.00 | 100.00 | 1,100.00 |
| 0028 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 100.00 | 200.00 | 50.00 | 100.00 | 150.00 | 300.00 | 100.00 | 200.00 |
| 0029 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 7 | EACH | 150.00 | 1,050.00 | 50.00 | 350.00 | 250.00 | 1,750.00 | 100.00 | 700.00 |
| 0030 | 716-01-00100 | Mulch (Vegetative) | 13.2 | TON | 425.00 | 5,610.00 | 450.00 | 5,940.00 | 2,200.00 | 29,040.00 | 550.00 | 7,260.00 |
| 0031 | 717-01-00100 | Seeding | 396 | LB | 7.00 | 2,772.00 | 7.00 | 2,772.00 | 12.00 | 4,752.00 | 9.00 | 3,564.00 |
| 0032 | 718-01-00100 | Fertilizer | 6,600 | LB | 0.45 | 2,970.00 | 0.50 | 3,300.00 | 1.00 | 6,600.00 | 0.50 | 3,300.00 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 136,000.00 | 136,000.00 | 80,000.00 | 80,000.00 | 250,000.00 | 250,000.00 |
| 0034 | 729-16-00100 | Object Marker Assembly (Type 1) | 2 | EACH | 100.00 | 200.00 | 90.00 | 180.00 | 80.00 | 160.00 | 100.00 | 200.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 647 | EACH | 5.00 | 3,235.00 | 5.50 | 3,558.50 | 8.00 | 5,176.00 | 6.50 | 4,205.50 |
| 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,150 | LNFT | 4.00 | 4,600.00 | 1.00 | 1,150.00 | 2.00 | 2,300.00 | 1.30 | 1,495.00 |
| 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 332 | LNFT | 6.00 | 1,992.00 | 4.00 | 1,328.00 | 4.00 | 1,328.00 | 4.75 | 1,577.00 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.246 | MILE | 2,200.00 | 20,341.20 | 3,000.00 | 27,738.00 | 2,800.00 | 25,888.80 | 3,300.00 | 30,511.80 |
| 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.973 | MILE | 1,000.00 | 4,973.00 | 780.00 | 3,878.94 | 1,800.00 | 8,951.40 | 900.00 | 4,475.70 |
| 0040 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 10 | EACH | 250.00 | 2,500.00 | 215.00 | 2,150.00 | 250.00 | 2,500.00 | 230.00 | 2,300.00 |
| 0041 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 325.00 | 650.00 | 230.00 | 460.00 | 350.00 | 700.00 | 230.00 | 460.00 |
| 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 375.00 | 375.00 | 215.00 | 215.00 | 250.00 | 250.00 | 230.00 | 230.00 |
| 0043 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 350.00 | 2,450.00 | 225.00 | 1,575.00 | 250.00 | 1,750.00 | 230.00 | 1,610.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 4,000.00 | 4,000.00 | 18,000.00 | 18,000.00 | 50,000.00 | 50,000.00 |
| 0045 | 741-11-00100 | Adjusting Water Valve | 10 | EACH | 300.00 | 3,000.00 | 850.00 | 8,500.00 | 250.00 | 2,500.00 | 700.00 | 7,000.00 |
| 0046 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 11,969 | LNFT | 1.70 | 20,347.30 | 1.65 | 19,748.85 | 2.50 | 29,922.50 | 2.00 | 23,938.00 |
| 0047 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 5,799 | LNFT | 1.70 | 9,858.30 | 1.65 | 9,568.35 | 2.75 | 15,947.25 | 2.00 | 11,598.00 |
| 0048 | NS-500-00280 | Surface Preparation | 1 | LUMP | 35,000.00 | 35,000.00 | 24,500.00 | 24,500.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0049 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 7,660 | INLF | 0.45 | 3,447.00 | 0.50 | 3,830.00 | 2.00 | 15,320.00 | 1.50 | 11,490.00 |
| 0050 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,054 | INLF | 0.60 | 1,832.40 | 0.80 | 2,443.20 | 2.00 | 6,108.00 | 1.50 | 4,581.00 |
| 0051 | NS-737-00001 | Traffic Paint Curbs and Traffic Islands | 100 | SQYD | 10.00 | 1,000.00 | 0.75 | 75.00 | 2.00 | 200.00 | 10.00 | 1,000.00 |
| 0052 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 42.00 | 2,100.00 | 45.00 | 2,250.00 | 24.00 | 1,200.00 | 28.00 | 1,400.00 |
| CONTRACTOR TOTAL | 1,921,268.70 | 2,006,610.99 | 2,629,821.55 | 2,871,941.20 | ||||||||