Bid Tabulations
Letting of
09/22/2010
LA DOTD Headquarters
| Lead Project: 297-01-0012 | |
| Parish: Desoto | |
| Routes: LA 765, LA 764 | |
| Description: US 84 TO TEXAS STATE LINE | |
| Type Const: ASPHALTIC CONCRETE WIDENING AND OVERLAY | |
| Estimated Construction Cost: $2,579,058.73 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $2,569,216.21 |
| 2 | 36374 | Best-Yet Builders, Llc | $2,821,936.50 |
| 3 | 17464 | Benton & Brown, LLC. | $3,565,358.53 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Best-Yet Builders, Llc |
- 3 - Benton & Brown, LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 18 | SQYD | 15.00 | 270.00 | 20.00 | 360.00 | 100.00 | 1,800.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 1,220 | LNFT | 6.00 | 7,320.00 | 4.00 | 4,880.00 | 5.00 | 6,100.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) S. P. 816-05-0012: Stations 41+80, 44+45, 53+43, 56+35, 58+11 & 74+47 | 156 | LNFT | 150.00 | 23,400.00 | 50.00 | 7,800.00 | 23.00 | 3,588.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) S. P. 297-01-0012: Stations 36+19, 54+36 & 159+95 | 26 | LNFT | 150.00 | 3,900.00 | 50.00 | 1,300.00 | 23.00 | 598.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 65,000.00 | 65,000.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 9,000 | CUYD | 12.50 | 112,500.00 | 10.00 | 90,000.00 | 20.00 | 180,000.00 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 350 | CUYD | 10.00 | 3,500.00 | 50.00 | 17,500.00 | 100.00 | 35,000.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 22,189.1 | TON | 80.00 | 1,775,128.00 | 90.00 | 1,997,019.00 | 100.00 | 2,218,910.00 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,420 | TON | 20.00 | 28,400.00 | 95.00 | 134,900.00 | 140.00 | 198,800.00 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,561 | SQYD | 2.00 | 5,122.00 | 2.50 | 6,402.50 | 7.00 | 17,927.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -53 | CUYD | 1.00 | -53.00 | 1.00 | -53.00 | 0.01 | -0.53 |
| 0012 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 4,300 | SQYD | 41.00 | 176,300.00 | 50.00 | 215,000.00 | 50.00 | 215,000.00 |
| 0013 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 80 | LNFT | 200.00 | 16,000.00 | 57.85 | 4,628.00 | 155.00 | 12,400.00 |
| 0014 | 701-08-00100 | Relaying Pipe | 36 | LNFT | 150.00 | 5,400.00 | 100.00 | 3,600.00 | 240.00 | 8,640.00 |
| 0015 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 60 | LNFT | 200.00 | 12,000.00 | 57.85 | 3,471.00 | 185.00 | 11,100.00 |
| 0016 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 42 | LNFT | 225.00 | 9,450.00 | 81.75 | 3,433.50 | 195.00 | 8,190.00 |
| 0017 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 16 | LNFT | 250.00 | 4,000.00 | 112.55 | 1,800.80 | 200.00 | 3,200.00 |
| 0018 | 701-15-00100 | Concrete Collar | 15 | EACH | 1,250.00 | 18,750.00 | 1,000.00 | 15,000.00 | 900.00 | 13,500.00 |
| 0019 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 300 | LNFT | 39.00 | 11,700.00 | 42.00 | 12,600.00 | 46.00 | 13,800.00 |
| 0020 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 570 | LNFT | 29.00 | 16,530.00 | 58.00 | 33,060.00 | 64.00 | 36,480.00 |
| 0021 | 704-03-00100 | Blocked Out Guard Rail | 150 | LNFT | 24.00 | 3,600.00 | 22.00 | 3,300.00 | 24.00 | 3,600.00 |
| 0022 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 1,676.00 | 20,112.00 | 2,200.00 | 26,400.00 | 2,400.00 | 28,800.00 |
| 0023 | 712-04-00100 | Flexible Revetment | 394 | SQYD | 80.00 | 31,520.00 | 100.00 | 39,400.00 | 100.00 | 39,400.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 10,000.00 | 10,000.00 | 140,000.00 | 140,000.00 |
| 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 1.00 | 12.00 | 2.00 | 24.00 | 1.00 | 12.00 |
| 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.377 | MILE | 300.00 | 4,013.10 | 800.00 | 10,701.60 | 350.00 | 4,681.95 |
| 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.639 | MILE | 1.00 | 5.64 | 200.00 | 1,127.80 | 1.00 | 5.64 |
| 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 42.874 | MILE | 1.00 | 42.87 | 300.00 | 12,862.20 | 1.00 | 42.87 |
| 0029 | 716-01-00100 | Mulch (Vegetative) | 28.48 | TON | 600.00 | 17,088.00 | 700.00 | 19,936.00 | 1,100.00 | 31,328.00 |
| 0030 | 717-01-00100 | Seeding | 470 | LB | 10.00 | 4,700.00 | 7.25 | 3,407.50 | 9.00 | 4,230.00 |
| 0031 | 718-01-00100 | Fertilizer | 13,640 | LB | 0.50 | 6,820.00 | 0.45 | 6,138.00 | 0.50 | 6,820.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | 140,000.00 | 140,000.00 |
| 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 15 | EACH | 50.00 | 750.00 | 60.00 | 900.00 | 65.00 | 975.00 |
| 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 62.00 | 744.00 | 100.00 | 1,200.00 | 110.00 | 1,320.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 772 | EACH | 5.25 | 4,053.00 | 5.25 | 4,053.00 | 5.25 | 4,053.00 |
| 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 35 | LNFT | 11.00 | 385.00 | 11.00 | 385.00 | 11.00 | 385.00 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 20.178 | MILE | 2,200.00 | 44,391.60 | 2,200.00 | 44,391.60 | 2,200.00 | 44,391.60 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.708 | MILE | 1,000.00 | 4,708.00 | 1,000.00 | 4,708.00 | 1,000.00 | 4,708.00 |
| 0039 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.017 | MILE | 20,000.00 | 340.00 | 20,000.00 | 340.00 | 20,000.00 | 340.00 |
| 0040 | 735-01-00100 | Mailboxes | 30 | EACH | 1.00 | 30.00 | 50.00 | 1,500.00 | 1.10 | 33.00 |
| 0041 | 735-02-00100 | Mailbox Supports (Single) | 22 | EACH | 137.00 | 3,014.00 | 65.00 | 1,430.00 | 150.00 | 3,300.00 |
| 0042 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 175.00 | 700.00 | 75.00 | 300.00 | 195.00 | 780.00 |
| 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 | 45,000.00 | 45,000.00 |
| 0044 | NS-200-00020 | Cleaning Existing Ditches | 430 | LNFT | 5.00 | 2,150.00 | 20.00 | 8,600.00 | 20.00 | 8,600.00 |
| 0045 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 210 | INLF | 2.00 | 420.00 | 3.00 | 630.00 | 12.00 | 2,520.00 |
| CONTRACTOR TOTAL | 2,569,216.21 | 2,821,936.50 | 3,565,358.53 | |||||||