Bid Tabulations
Letting of
06/16/2010
LA DOTD Headquarters
| Lead Project: 283-09-0141 | |
| Parish: Jefferson | |
| Routes: US 90 | |
| Description: IMPROVEMENTS TO US 90B SERVICE ROADS AT FARRINGTON DRIVE | |
| Type Const: REALIGN CROSSOVER, ADD U-TURNS TO US 90B SERVICE ROADS AND RELATE WORK | |
| Estimated Construction Cost: $511,167.84 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 43371 | RMD Holdings Ltd | $428,686.70 |
| 2 | 38610 | Three C's Properties Inc | $474,474.88 |
| 3 | 06276 | Barriere Construction Co., LLC | $537,032.81 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $556,375.93 |
| 5 | 24901 | Hard Rock Construction Co. | $594,303.64 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - RMD Holdings Ltd |
- 2 - Three C's Properties Inc |
- 3 - Barriere Construction Co., LLC |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 796.77 | 796.77 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 100.00 | 100.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 132 | LNFT | 6.94 | 915.83 | 12.30 | 1,623.60 | 6.00 | 792.00 | 15.00 | 1,980.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 876 | SQYD | 2.68 | 2,347.07 | 5.00 | 4,380.00 | 13.00 | 11,388.00 | 15.00 | 13,140.00 |
| 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 150 | SQYD | 6.70 | 1,005.62 | 10.80 | 1,620.00 | 13.00 | 1,950.00 | 15.00 | 2,250.00 |
| 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 7 | EACH | 24.37 | 170.60 | 5.15 | 36.05 | 6.00 | 42.00 | 5.00 | 35.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 30.55 | SQYD | 6.70 | 204.81 | 24.00 | 733.20 | 13.00 | 397.15 | 10.00 | 305.50 |
| 0007 | 203-01-00100 | General Excavation | 841 | CUYD | 12.52 | 10,528.48 | 15.80 | 13,287.80 | 15.00 | 12,615.00 | 15.00 | 12,615.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 20.15 | 2,014.74 | 20.00 | 2,000.00 | 35.00 | 3,500.00 | 25.00 | 2,500.00 |
| 0009 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 2,100 | SQYD | 12.38 | 25,995.06 | 12.00 | 25,200.00 | 16.00 | 33,600.00 | 20.00 | 42,000.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,113.2 | TON | 125.00 | 139,150.00 | 145.00 | 161,414.00 | 136.00 | 151,395.20 | 80.00 | 89,056.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 257 | SQYD | 4.68 | 1,202.76 | 36.00 | 9,252.00 | 30.00 | 7,710.00 | 20.00 | 5,140.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | 115.03 | CUYD | -0.01 | -1.15 | 1.00 | 115.03 | 1.00 | 115.03 | 1.00 | 115.03 |
| 0013 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 20 | SQYD | 196.21 | 3,924.18 | 95.00 | 1,900.00 | 100.00 | 2,000.00 | 40.00 | 800.00 |
| 0014 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 160 | LNFT | 51.08 | 8,173.15 | 107.00 | 17,120.00 | 115.00 | 18,400.00 | 300.00 | 48,000.00 |
| 0015 | 701-07-00300 | Yard Drain Pipe (8") PVC Pipe | 43 | LNFT | 20.31 | 873.38 | 99.00 | 4,257.00 | 23.00 | 989.00 | 40.00 | 1,720.00 |
| 0016 | 701-08-00100 | Relaying Pipe This pay item will be used to deal with the irrigation system beneath crossover and U-turns. | 200 | LNFT | 19.55 | 3,910.14 | 11.70 | 2,340.00 | 12.00 | 2,400.00 | 20.00 | 4,000.00 |
| 0017 | 702-01-00100 | Junction Boxes 4' x 9' x 3' | 2 | EACH | 2,561.55 | 5,123.10 | 4,235.00 | 8,470.00 | 4,700.00 | 9,400.00 | 6,000.00 | 12,000.00 |
| 0018 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 409.50 | 819.00 | 942.50 | 1,885.00 | 1,300.00 | 2,600.00 | 500.00 | 1,000.00 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) 6' wide | 2,040 | SQYD | 38.07 | 77,666.47 | 43.00 | 87,720.00 | 40.00 | 81,600.00 | 50.00 | 102,000.00 |
| 0020 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 15 | SQYD | 38.07 | 571.08 | 60.00 | 900.00 | 100.00 | 1,500.00 | 100.00 | 1,500.00 |
| 0021 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 389.67 | 5,455.36 | 960.00 | 13,440.00 | 1,300.00 | 18,200.00 | 2,000.00 | 28,000.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,596 | LNFT | 20.46 | 32,659.43 | 33.50 | 53,466.00 | 20.00 | 31,920.00 | 25.00 | 39,900.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,439.33 | 5,439.33 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 |
| 0024 | 717-01-00100 | Seeding | 4.293 | LB | 29.25 | 125.57 | 22.20 | 95.30 | 30.00 | 128.79 | 1.00 | 4.29 |
| 0025 | 718-01-00100 | Fertilizer | 143.11 | LB | 1.17 | 167.44 | 4.50 | 644.00 | 1.75 | 250.44 | 1.00 | 143.11 |
| 0026 | 726-01-00100 | Bedding Material | 250 | CUYD | 59.67 | 14,917.50 | 43.35 | 10,837.50 | 60.00 | 15,000.00 | 1.00 | 250.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 60,314.89 | 60,314.89 | 12,500.00 | 12,500.00 | 51,000.00 | 51,000.00 | 50,000.00 | 50,000.00 |
| 0028 | 729-21-00100 | U-Channel Post | 7 | EACH | 85.80 | 600.57 | 63.00 | 441.00 | 65.00 | 455.00 | 60.00 | 420.00 |
| 0029 | 730-09-00100 | Electrical System | 1 | LUMP | 1,170.00 | 1,170.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 |
| 0030 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,974 | LNFT | 0.64 | 1,270.27 | 0.60 | 1,184.40 | 0.80 | 1,579.20 | 0.50 | 987.00 |
| 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) Crosswalks | 460 | LNFT | 1.29 | 592.02 | 1.15 | 529.00 | 1.10 | 506.00 | 1.50 | 690.00 |
| 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 60 | LNFT | 4.68 | 280.80 | 4.20 | 252.00 | 4.50 | 270.00 | 4.50 | 270.00 |
| 0033 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 204.75 | 819.00 | 184.00 | 736.00 | 200.00 | 800.00 | 300.00 | 1,200.00 |
| 0034 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 4 | EACH | 380.25 | 1,521.00 | 340.00 | 1,360.00 | 375.00 | 1,500.00 | 350.00 | 1,400.00 |
| 0035 | 732-04-04000 | Plastic Pavement Legends and Symbols (Diamond) | 4 | EACH | 216.45 | 865.80 | 195.00 | 780.00 | 210.00 | 840.00 | 200.00 | 800.00 |
| 0036 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 4 | EACH | 468.00 | 1,872.00 | 420.00 | 1,680.00 | 455.00 | 1,820.00 | 300.00 | 1,200.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,680.00 | 4,680.00 | 8,650.00 | 8,650.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 |
| 0038 | 741-05-01100 | Water Service Line (2" PVC) | 50 | LNFT | 23.40 | 1,170.00 | 65.25 | 3,262.50 | 12.00 | 600.00 | 20.00 | 1,000.00 |
| 0039 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 170 | INLF | 1.46 | 248.63 | 1.55 | 263.50 | 1.00 | 170.00 | 1.50 | 255.00 |
| 0040 | NS-ENH-02080 | Bollards 8" diameter concrete bollard with 4" wide stainless steel band with 4" wide reflective band fastened to stainless steel band. | 12 | EACH | 760.50 | 9,126.00 | 550.00 | 6,600.00 | 800.00 | 9,600.00 | 800.00 | 9,600.00 |
| CONTRACTOR TOTAL | 428,686.70 | 474,474.88 | 537,032.81 | 556,375.93 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Hard Rock Construction Co. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 14,000.00 | 14,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 132 | LNFT | 25.00 | 3,300.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 876 | SQYD | 10.00 | 8,760.00 |
| 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 150 | SQYD | 10.00 | 1,500.00 |
| 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 7 | EACH | 5.00 | 35.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 30.55 | SQYD | 20.00 | 611.00 |
| 0007 | 203-01-00100 | General Excavation | 841 | CUYD | 20.00 | 16,820.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 24.00 | 2,400.00 |
| 0009 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 2,100 | SQYD | 20.00 | 42,000.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,113.2 | TON | 141.00 | 156,961.20 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 257 | SQYD | 35.00 | 8,995.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | 115.03 | CUYD | 1.00 | 115.03 |
| 0013 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 20 | SQYD | 100.00 | 2,000.00 |
| 0014 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 160 | LNFT | 120.00 | 19,200.00 |
| 0015 | 701-07-00300 | Yard Drain Pipe (8") PVC Pipe | 43 | LNFT | 31.00 | 1,333.00 |
| 0016 | 701-08-00100 | Relaying Pipe This pay item will be used to deal with the irrigation system beneath crossover and U-turns. | 200 | LNFT | 15.00 | 3,000.00 |
| 0017 | 702-01-00100 | Junction Boxes 4' x 9' x 3' | 2 | EACH | 6,000.00 | 12,000.00 |
| 0018 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 500.00 | 1,000.00 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) 6' wide | 2,040 | SQYD | 1.00 | 2,040.00 |
| 0020 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 15 | SQYD | 70.00 | 1,050.00 |
| 0021 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 1,000.00 | 14,000.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,596 | LNFT | 25.00 | 39,900.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0024 | 717-01-00100 | Seeding | 4.293 | LB | 200.00 | 858.60 |
| 0025 | 718-01-00100 | Fertilizer | 143.11 | LB | 1.00 | 143.11 |
| 0026 | 726-01-00100 | Bedding Material | 250 | CUYD | 100.00 | 25,000.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0028 | 729-21-00100 | U-Channel Post | 7 | EACH | 60.00 | 420.00 |
| 0029 | 730-09-00100 | Electrical System | 1 | LUMP | 5,000.00 | 5,000.00 |
| 0030 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,974 | LNFT | 0.55 | 1,085.70 |
| 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) Crosswalks | 460 | LNFT | 1.10 | 506.00 |
| 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 60 | LNFT | 4.00 | 240.00 |
| 0033 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 175.00 | 700.00 |
| 0034 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 4 | EACH | 325.00 | 1,300.00 |
| 0035 | 732-04-04000 | Plastic Pavement Legends and Symbols (Diamond) | 4 | EACH | 185.00 | 740.00 |
| 0036 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 4 | EACH | 400.00 | 1,600.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0038 | 741-05-01100 | Water Service Line (2" PVC) | 50 | LNFT | 50.00 | 2,500.00 |
| 0039 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 170 | INLF | 7.00 | 1,190.00 |
| 0040 | NS-ENH-02080 | Bollards 8" diameter concrete bollard with 4" wide stainless steel band with 4" wide reflective band fastened to stainless steel band. | 12 | EACH | 1,000.00 | 12,000.00 |
| CONTRACTOR TOTAL | 594,303.64 | |||||