Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 283-09-0137 | |
| Parish: Jefferson | |
| Routes: US 90-Z | |
| Description: 1.25 MILES WEST OF LA 45 - US 90 BUSINESS EXIT | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, RUMBLE STRIPS and RELATED WORK. | |
| Estimated Construction Cost: $3,885,670.99 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $4,082,184.84 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,372,276.77 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Boh Bros. Construction Co., LLC. |
- 2 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 200 | CUYD | 45.00 | 9,000.00 | 12.00 | 2,400.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 24,650.1 | TON | 95.00 | 2,341,759.50 | 85.00 | 2,095,258.50 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,055.4 | TON | 95.00 | 100,263.00 | 142.00 | 149,866.80 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 219,792 | SQYD | 2.50 | 549,480.00 | 3.00 | 659,376.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -6,105 | CUYD | 15.00 | -91,575.00 | 20.00 | -122,100.00 |
| 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 80.00 | 16,000.00 | 70.00 | 14,000.00 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 650 | SQYD | 130.00 | 84,500.00 | 96.00 | 62,400.00 |
| 0008 | 706-04-00100 | Handicapped Curb Ramps | 96 | EACH | 2,000.00 | 192,000.00 | 2,000.00 | 192,000.00 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 395,000.00 | 395,000.00 |
| 0010 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 11,000 | LNFT | 0.01 | 110.00 | 0.15 | 1,650.00 |
| 0011 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,318 | LNFT | 0.03 | 159.54 | 0.40 | 2,127.20 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 41.948 | MILE | 10.00 | 419.48 | 500.00 | 20,974.00 |
| 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 23.998 | MILE | 15.00 | 359.97 | 550.00 | 13,198.90 |
| 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.4 | MILE | 20.00 | 768.00 | 550.00 | 21,120.00 |
| 0015 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 114 | EACH | 10.00 | 1,140.00 | 25.00 | 2,850.00 |
| 0016 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 86 | EACH | 10.00 | 860.00 | 25.00 | 2,150.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 430,000.00 | 430,000.00 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,590 | EACH | 6.00 | 15,540.00 | 5.00 | 12,950.00 |
| 0019 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 5,500 | LNFT | 1.50 | 8,250.00 | 0.90 | 4,950.00 |
| 0020 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,659 | LNFT | 5.00 | 13,295.00 | 2.75 | 7,312.25 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.2 | MILE | 2,500.00 | 48,000.00 | 2,300.00 | 44,160.00 |
| 0022 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 14.169 | MILE | 900.00 | 12,752.10 | 950.00 | 13,460.55 |
| 0023 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 57 | EACH | 240.00 | 13,680.00 | 175.00 | 9,975.00 |
| 0024 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 43 | EACH | 250.00 | 10,750.00 | 175.00 | 7,525.00 |
| 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0026 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 12,000.00 | 24,000.00 | 10,000.00 | 20,000.00 |
| 0027 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 8.1 | MILE | 400.00 | 3,240.00 | 1,500.00 | 12,150.00 |
| 0028 | 202-02-06100 | Removal of Concrete Walks and Drives | 200 | SQYD | 20.00 | 4,000.00 | 17.00 | 3,400.00 |
| 0029 | 202-02-06140 | Removal of Curbs (Concrete) | 500 | LNFT | 5.00 | 2,500.00 | 14.50 | 7,250.00 |
| 0030 | 202-02-14500 | Removal of Guard Rail | 944 | LNFT | 7.00 | 6,608.00 | 8.00 | 7,552.00 |
| 0031 | 702-04-00100 | Adjusting Manholes | 142 | EACH | 50.00 | 7,100.00 | 500.00 | 71,000.00 |
| 0032 | 702-04-00200 | Adjusting Catch Basins | 100 | EACH | 100.00 | 10,000.00 | 1,100.00 | 110,000.00 |
| 0033 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 337.5 | LNFT | 60.00 | 20,250.00 | 60.00 | 20,250.00 |
| 0034 | 704-03-00100 | Blocked Out Guard Rail | 1,312.5 | LNFT | 19.00 | 24,937.50 | 20.00 | 26,250.00 |
| 0035 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 12.5 | LNFT | 80.00 | 1,000.00 | 90.00 | 1,125.00 |
| 0036 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 90.00 | 1,125.00 | 100.00 | 1,250.00 |
| 0037 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,200.00 | 8,800.00 | 2,250.00 | 9,000.00 |
| 0038 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 200 | SQYD | 70.00 | 14,000.00 | 66.00 | 13,200.00 |
| 0039 | 707-01-00100 | Concrete Curb | 100 | LNFT | 100.00 | 10,000.00 | 35.00 | 3,500.00 |
| 0040 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 1,767.76 | LNFT | 0.02 | 35.36 | 0.25 | 441.94 |
| 0041 | 717-01-00100 | Seeding | 37.091 | LB | 30.00 | 1,112.73 | 12.00 | 445.09 |
| 0042 | 718-01-00100 | Fertilizer | 1,236.36 | LB | 0.50 | 618.18 | 2.00 | 2,472.72 |
| 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 80.00 | 960.00 | 130.00 | 1,560.00 |
| 0044 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 883.88 | LNFT | 2.70 | 2,386.48 | 1.50 | 1,325.82 |
| 0045 | 736-09-00100 | Loop Detector | 500 | LNFT | 14.00 | 7,000.00 | 15.00 | 7,500.00 |
| CONTRACTOR TOTAL | 4,082,184.84 | 4,372,276.77 | ||||||