Bid Tabulations
Letting of
09/28/2011
LA DOTD Headquarters
| Lead Project: 269-07-0011 | |
| Parish: St. Tammany | |
| Routes: LA 40 | |
| Description: Tangipahoa Parish Line - S. Jct. La 25 | |
| Type Const: GRADING, IN-PLACE CEMENT TREATED BASE COURSE, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, BRIDGE SUPERSTRUCTURE REPAIRS, AND RELATED WORK. | |
| Estimated Construction Cost: $3,046,327.80 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $2,528,703.25 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $3,157,670.40 |
| 3 | 06276 | Barriere Construction Co., LLC. | $3,197,667.53 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Boh Bros. Construction Co., LLC. |
- 3 - Barriere Construction Co., LLC. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Tree Trimming | 1 | LUMP | 2,100.00 | 2,100.00 | 3,000.00 | 3,000.00 | 25,000.00 | 25,000.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 192 | SQYD | 11.00 | 2,112.00 | 10.00 | 1,920.00 | 30.00 | 5,760.00 |
| 0003 | 202-02-04020 | Removal of Bridge Ballast Station 17+60, Station 57+40 and Station 164+00 | 803 | SQYD | 10.00 | 8,030.00 | 15.00 | 12,045.00 | 25.00 | 20,075.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 48 | SQYD | 45.00 | 2,160.00 | 20.00 | 960.00 | 30.00 | 1,440.00 |
| 0005 | 202-02-14500 | Removal of Guard Rail | 1,478 | LNFT | 7.00 | 10,346.00 | 5.50 | 8,129.00 | 6.00 | 8,868.00 |
| 0006 | 202-02-38300 | Removal of Sign and U-Channel Post (Existing Object Markers) | 64 | EACH | 56.00 | 3,584.00 | 5.00 | 320.00 | 12.00 | 768.00 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,682 | CUYD | 20.00 | 53,640.00 | 20.00 | 53,640.00 | 16.00 | 42,912.00 |
| 0008 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 3,788 | CUYD | 14.00 | 53,032.00 | 24.00 | 90,912.00 | 1.00 | 3,788.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 175 | EACH | 13.00 | 2,275.00 | 6.50 | 1,137.50 | 7.50 | 1,312.50 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 13,000 | LNFT | 1.10 | 14,300.00 | 1.00 | 13,000.00 | 1.35 | 17,550.00 |
| 0011 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 66,736 | SQYD | 5.15 | 343,690.40 | 4.65 | 310,322.40 | 6.00 | 400,416.00 |
| 0012 | 308-02-00100 | Removal of Existing Patches | 1,200 | SQYD | 11.00 | 13,200.00 | 12.50 | 15,000.00 | 1.00 | 1,200.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 271 | CUYD | 34.50 | 9,349.50 | 100.00 | 27,100.00 | 100.00 | 27,100.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 10.00 | 5,000.00 | 20.00 | 10,000.00 | 1.00 | 500.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 18,601.3 | TON | 63.50 | 1,181,182.55 | 90.00 | 1,674,117.00 | 70.00 | 1,302,091.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 679 | TON | 175.00 | 118,825.00 | 140.00 | 95,060.00 | 120.00 | 81,480.00 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 54,541 | SQYD | 1.50 | 81,811.50 | 2.00 | 109,082.00 | 1.50 | 81,811.50 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,273 | CUYD | 0.10 | -227.30 | 10.00 | -22,730.00 | 20.00 | -45,460.00 |
| 0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 260.00 | 4,160.00 | 135.00 | 2,160.00 | 160.00 | 2,560.00 |
| 0020 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 24 | LNFT | 260.00 | 6,240.00 | 145.00 | 3,480.00 | 180.00 | 4,320.00 |
| 0021 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 48 | LNFT | 280.00 | 13,440.00 | 185.00 | 8,880.00 | 225.00 | 10,800.00 |
| 0022 | 701-15-00100 | Concrete Collar | 14 | EACH | 850.00 | 11,900.00 | 875.00 | 12,250.00 | 1,000.00 | 14,000.00 |
| 0023 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,600.00 | 1,600.00 | 3,000.00 | 3,000.00 | 4,300.00 | 4,300.00 |
| 0024 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 400 | LNFT | 36.00 | 14,400.00 | 42.00 | 16,800.00 | 60.00 | 24,000.00 |
| 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,318 | LNFT | 60.00 | 79,080.00 | 70.00 | 92,260.00 | 70.00 | 92,260.00 |
| 0026 | 704-03-00100 | Blocked Out Guard Rail | 500 | LNFT | 19.00 | 9,500.00 | 23.00 | 11,500.00 | 23.00 | 11,500.00 |
| 0027 | 704-11-00100 | Guard Rail End Treatment (Flared) | 16 | EACH | 2,100.00 | 33,600.00 | 2,200.00 | 35,200.00 | 2,750.00 | 44,000.00 |
| 0028 | 707-01-00100 | Concrete Curb | 22 | LNFT | 27.00 | 594.00 | 30.00 | 660.00 | 75.00 | 1,650.00 |
| 0029 | 711-02-00300 | Riprap (30 lb) Station 36+00, Station 114+15 and Station 215+20 | 30 | CUYD | 140.00 | 4,200.00 | 165.00 | 4,950.00 | 200.00 | 6,000.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,000.00 | 14,000.00 | 23,000.00 | 23,000.00 | 225,000.00 | 225,000.00 |
| 0031 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 88 | LNFT | 0.23 | 20.24 | 0.20 | 17.60 | 0.25 | 22.00 |
| 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.80 | 19.20 | 0.50 | 12.00 | 1.00 | 24.00 |
| 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.301 | MILE | 500.00 | 4,150.50 | 500.00 | 4,150.50 | 500.00 | 4,150.50 |
| 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.178 | MILE | 160.00 | 828.48 | 50.00 | 258.90 | 180.00 | 932.04 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.966 | MILE | 210.00 | 5,452.86 | 100.00 | 2,596.60 | 240.00 | 6,231.84 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 560.00 | 4,480.00 | 300.00 | 2,400.00 | 320.00 | 2,560.00 |
| 0037 | 717-01-00100 | Seeding | 121 | LB | 8.50 | 1,028.50 | 20.00 | 2,420.00 | 22.00 | 2,662.00 |
| 0038 | 718-01-00100 | Fertilizer | 4,025 | LB | 0.45 | 1,811.25 | 0.50 | 2,012.50 | 0.55 | 2,213.75 |
| 0039 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 9,000.00 | 9,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 |
| 0040 | 726-01-00100 | Bedding Material | 99.3 | CUYD | 52.00 | 5,163.60 | 94.00 | 9,334.20 | 110.00 | 10,923.00 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 130,800.00 | 130,800.00 | 200,000.00 | 200,000.00 | 290,000.00 | 290,000.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 48 | EACH | 85.00 | 4,080.00 | 80.00 | 3,840.00 | 90.00 | 4,320.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 798 | EACH | 5.50 | 4,389.00 | 5.25 | 4,189.50 | 6.00 | 4,788.00 |
| 0044 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 44 | LNFT | 1.60 | 70.40 | 1.60 | 70.40 | 2.00 | 88.00 |
| 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 5.25 | 63.00 | 5.25 | 63.00 | 6.00 | 72.00 |
| 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.983 | MILE | 3,000.00 | 38,949.00 | 2,900.00 | 37,650.70 | 3,200.00 | 41,545.60 |
| 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.589 | MILE | 900.00 | 2,330.10 | 900.00 | 2,330.10 | 1,000.00 | 2,589.00 |
| 0048 | 735-01-00100 | Mailboxes | 29 | EACH | 10.00 | 290.00 | 7.00 | 203.00 | 6.00 | 174.00 |
| 0049 | 735-02-00100 | Mailbox Supports (Single) | 29 | EACH | 100.00 | 2,900.00 | 140.00 | 4,060.00 | 175.00 | 5,075.00 |
| 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 72,500.00 | 72,500.00 |
| 0051 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 83.96 | CUYD | 1,000.00 | 83,960.00 | 1,200.00 | 100,752.00 | 1,400.00 | 117,544.00 |
| 0052 | 805-12-33000 | Reinforced Concrete Box Culverts (4' x 4') (Extension) | 64 | LNFT | 425.00 | 27,200.00 | 700.00 | 44,800.00 | 825.00 | 52,800.00 |
| 0053 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 80 | LNFT | 510.00 | 40,800.00 | 800.00 | 64,000.00 | 900.00 | 72,000.00 |
| 0054 | 805-12-35000 | Reinforced Concrete Box Culverts (6' x 6') (Extension) | 16 | LNFT | 575.00 | 9,200.00 | 900.00 | 14,400.00 | 1,000.00 | 16,000.00 |
| 0055 | 806-01-00100 | Deformed Reinforcing Steel | 6,137 | LB | 1.25 | 7,671.25 | 1.30 | 7,978.10 | 1.50 | 9,205.50 |
| 0056 | NS-200-00020 | Cleaning Existing Ditches | 500 | LNFT | 4.25 | 2,125.00 | 7.00 | 3,500.00 | 8.00 | 4,000.00 |
| 0057 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 225 | INLF | 5.70 | 1,282.50 | 1.00 | 225.00 | 1.25 | 281.25 |
| 0058 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 75 | INLF | 17.00 | 1,275.00 | 3.00 | 225.00 | 1.25 | 93.75 |
| 0059 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 8.302 | MILE | 360.00 | 2,988.72 | 700.00 | 5,811.40 | 650.00 | 5,396.30 |
| 0060 | NS-805-00016 | Bridge Superstructure Repair Structure Numbers: 2690700171, 2690700931 & 2690702991 | 3 | EACH | 8,700.00 | 26,100.00 | 4,500.00 | 13,500.00 | 8,500.00 | 25,500.00 |
| 0061 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps Austin Street, Station 223+70 Left of Center Line | 1 | EACH | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 1,200.00 | 1,200.00 |
| 0062 | 202-03-38000 | Relocation of Sign (Existing Permanent Signs) | 43 | EACH | 50.00 | 2,150.00 | 5.00 | 215.00 | 18.00 | 774.00 |
| CONTRACTOR TOTAL | 2,528,703.25 | 3,157,670.40 | 3,197,667.53 | |||||||